Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

Saudi Aramco 2601-ENG (01/2003)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPRNS SAUDI ARABIAN OIL COMPANY
0

0
PMT

EQUIPMENT INSPECTION SCHEDULE (REFER TO SAEP - 20)


ENGG CERT

INSPECTION
INTERVAL-MONTHS
EQUIPMENT INSPECTION PROCEDURE
Initial
OSI T&I
0

T&I
DESCRIPTION

0
JO/EWO
REV.
DATE
NO.

DISCIPLINE
ENGINEER

DATE
PROJECT
ENGINEER

DATE
CERTIFIED

DATE
CONSTRUCTION
AGENCY

DATE
OPERATIONS

DATE
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISION CERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Supvr. Opns Insp. Gen. Supvr./ Supt. Opns. Engr. Superintendent Opns. Manager, Insp. Dept. Gen. Mgr. Opns or Plt. Mgr.
THIS INDICATES THAT REV. NO.

JO / EWO

JO NO.
EQUIPMENT INSPECTION SCHEDULE DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT NO. REV NO.

SCH
A E-
(DCC) NO.

EWO NO.

SAUDI ARAMCO JO / EWO

EDSD/2601-0103.XLS