Professional Documents
Culture Documents
Saudi Arabian Oil Company: Equipment Inspection Schedule
Saudi Arabian Oil Company: Equipment Inspection Schedule
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPRNS SAUDI ARABIAN OIL COMPANY
0
0
PMT
INSPECTION
INTERVAL-MONTHS
EQUIPMENT INSPECTION PROCEDURE
Initial
OSI T&I
0
T&I
DESCRIPTION
0
JO/EWO
REV.
DATE
NO.
DISCIPLINE
ENGINEER
DATE
PROJECT
ENGINEER
DATE
CERTIFIED
DATE
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISION CERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS
OF THIS DRAWING IS COVERED, FOR ALL
Supvr. Opns Insp. Gen. Supvr./ Supt. Opns. Engr. Superintendent Opns. Manager, Insp. Dept. Gen. Mgr. Opns or Plt. Mgr.
THIS INDICATES THAT REV. NO.
JO / EWO
JO NO.
EQUIPMENT INSPECTION SCHEDULE DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT NO. REV NO.
SCH
A E-
(DCC) NO.
EWO NO.
EDSD/2601-0103.XLS