This cable high potential test report summarizes insulation resistance and DC withstand voltage testing on the main transformer's cables at the GP2 installation location. Insulation resistance was tested before and after applying voltages of 6KV, 12KV, 18KV and 24KV for various time periods, and leakage currents were measured for each cable phase. The test concluded that the cables passed insulation resistance and voltage withstand standards.
This cable high potential test report summarizes insulation resistance and DC withstand voltage testing on the main transformer's cables at the GP2 installation location. Insulation resistance was tested before and after applying voltages of 6KV, 12KV, 18KV and 24KV for various time periods, and leakage currents were measured for each cable phase. The test concluded that the cables passed insulation resistance and voltage withstand standards.
This cable high potential test report summarizes insulation resistance and DC withstand voltage testing on the main transformer's cables at the GP2 installation location. Insulation resistance was tested before and after applying voltages of 6KV, 12KV, 18KV and 24KV for various time periods, and leakage currents were measured for each cable phase. The test concluded that the cables passed insulation resistance and voltage withstand standards.