Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 13.06.2019

Work Item Unit Overall Average (RM)


EXTERNAL WATER SUPPLY INSTALLATION Item Location Range (RM) Average (RM) RM 4520.23
EXTERNAL WATER SUPPLY INSTALLATION
A 950.00 - 3000.00 1878.13
EXTERNAL WATER RETICULATIONS
Connection B 6000.00 - 13295.60 9647.80
Allow for connection of 100mm Diameter mild steel C 70.00 - 5000.00 1244.23
pipe to existing main water supply with and including
requisite adaptors, connectors and bolts complete and D 10000.00 - 10000.00 10000.00
make good any defect upon completion E 1000.00 - 4000.00 2571.43
F 5300.00 - 5300.00 5300.00
H 1000.00 - 1000.00 1000.00
EXTERNAL WATER SUPPLY INSTALLATION Item Location Range (RM) Average (RM) RM 3750.00
EXTERNAL WATER SUPPLY INSTALLATION
E 2500.00 - 5000.00 3750.00
EXTERNAL WATER RETICULATIONS
Locating and tapping into Jabatan Bekalan Air's water
main
Allow for locating, arranging, attending, liaising and
obtaining approval from Jabatan Bekalan Air for
temporary water shut-off, cutting off from existing
water mains and tapping to 100mm diameter mild steel
pipe including coated cast airon offtake tee,
EXTERNAL WATER SUPPLY INSTALLATION Item Location Range (RM) Average (RM) RM 2719.60
EXTERNAL WATER SUPPLY INSTALLATION
A 600.00 - 6700.00 2012.92
EXTERNAL WATER RETICULATIONS
Testing B 2000.00 - 3850.00 2950.00
On completion of the water reticulation system test and C 500.00 - 6180.00 3617.65
commision as specified all pipes and fitting and make
good all defects, re-test and leave whole in perfect D 1000.00 - 5750.00 2958.33
working order to the satisfaction of the Architect and E 1000.00 - 3060.00 2213.33
Authorities
F 500.00 - 4000.00 1910.00
H 1500.00 - 9000.00 3375.00
EXTERNAL WATER SUPPLY INSTALLATION Item Location Range (RM) Average (RM) RM 1208.33
EXTERNAL WATER SUPPLY INSTALLATION
EXTERNAL WATER RETICULATIONS
Sterrillisation

1/3
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 13.06.2019

Work Item Unit Overall Average (RM)


Sterrillisation as specified including cost water and A 500.00 - 500.00 500.00
chlorine solution to the approval of the Architect and
the Authorities for all pipes and fittings. B 2000.00 - 2000.00 2000.00
C 1000.00 - 1000.00 1000.00
E 1000.00 - 2000.00 1333.33

2/3
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 13.06.2019

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: husnan@jkr.gov.my

3/3

You might also like