To: Project Manager Sub: Monthly Report (Jan - 2017) : No Date Activity
To: Project Manager Sub: Monthly Report (Jan - 2017) : No Date Activity
No Date Activity.
Bahirka Sub 1- Formwork for first stage transformer oil pit wall (3rd
2- KRG - MOE 3/1 transformer).
2- De-shuttering formwork for electrical indoor
/NES-02/2013 equipment of capacitor bank
Bahirka Sub
1- Concrete curing for first stage transformer oil pit wall
3- KRG - MOE 5/1 (3rd transformer).
/NES-02/2013 2- Painting with two layers of bitumen flint coat material
for main building.
Bahirka Sub 1- Concrete curing for 2nd stage transformer oil pit wall
5- KRG - MOE 9/1 (3rd transformer).
/NES-02/2013 2- Painting main building foundation with two layers of
bitumen flint coat material.
Bahirka Sub 1- Concrete curing for 2nd stage transformer oil pit wall
6- KRG - MOE 11/1 (3rd transformer).
/NES-02/2013 2- Painting with two layers of bitumen flint coat material
for gantry foundations (M1).
Bahirka Sub
10- KRG - MOE 19/1
1- Painting gantry foundations (M1) with two layers of
/NES-02/2013 bitumen flint coat material.
•
MOE -Civil Supervisor team for Bahirka Sub KRG - MOE /NES-
02/2013 :
. (KRG - MOE / ES-06a/2011)