Professional Documents
Culture Documents
Final Report - Sul-Luw-21-T-1034 - Split-Central-68pst MCP Soho PDF
Final Report - Sul-Luw-21-T-1034 - Split-Central-68pst MCP Soho PDF
REPORT
MS-TOWER 6.20 – EIA-222-F
SITE ID : SUL-LUW-21-T-1034
SITE NAME : SPLIT-CENTRAL-68/PST MCP
SOHO
TYPE TOWER : MONOPOLE 20M
2020
1. SUMMARY REPORT
2. DESIGN CRITERIA
Baik
VI CATATAN LAIN
Daftar Ketidaksesuaian
Keadaan permukaan : Baik
Keadaan cat besi tower : Baik
Kondisi karat besi tower : Baik
Detail Baseplate : Baik
Penangkal Petir : Baik
Lampu Tower : Baik
Grounding dan Pentanahan : Baik
VII KESIMPULAN
Anchor Bolt Masih aman dan Tidak Memerlukan perkuatan
Baseplate Masih aman dan Tidak Memerlukan perkuatan
Tower Tidak Aman Dan Memerlukan Perkuatan
Jakarta, 23-Jan-2020
................................................ ................................................
PLICATION ST
1.1 APP TANDARD AN
ND SPECIFIC
CATION
All materrials, fabricatio
on and testing shall conform
m to the latest version
v of the following stan
ndards or equiivalents.
1. Design : EIA -222--F.
2. mber Stress : EIA
Mem E -222-F.
3. ASC
CE for Steel Trransmission To
ower.
4. AISC
C for Manual of
o Steel Consttruction – Allow
wable Stress Design.
D
5. SKB
BI 1.3.5.1987 Earthquake
E forr building desiign.
6. UBC
C (Uniform Building Code), 1991
1 Edition.
7. ICAO
O for Obstructtion Marking and
a Lighting.
8. ANS
SI/AWS D1.1-9
92 and D1.0-6
69.
9. NEC
C – Tower Ligh
hting Kits.
10. AWS
S D1.1-Structu
ural Welding Code.
C
TERIAL
1.2 MAT
Standard
d material are used in structural analysis and
a design, given in the following table:
Material Standard Yield Strrength
pes
Steel Pip JIS G3444 / STK400 fy = 235 Mpa
Steel Sha
ape & Plates ASTM A36 / JIS
J G3101 fy = 245 Mpa
Bolts ASTM325 fy = 660 Mpa
Anchor Bolts
B ASTM A307 fy = 245 Mpa
Welds D1.1-92 and D1.0-69
D fy = 345 Mpa
Hot-dip Galvanized
G ASTM A123 on thickness”
“70 micro
Concrete
e ACI 318M-89 fc = 18.3
32 Mpa
ADING
1.3 LOA
The follow
wing definition
ns give the me
eaning of certa
ain terms used
d in the structu
ural analysis a
and design :
A. Dead Load [D
DL]
Vertical load due to the
e weight of all
a permanen
nt structural [tower] and non structura
al components
es].
[appurtenance
es : Items atta
Appurtenance ached to the sttructure such as
a antennas, transmission
t lines, climbing
g devices, etc.
B. Wind
W Load [W
WL]
Horizontal loa
ad refers to EIA
A – 222 F “Strructural Stand
dards for Anten
nna Supportin a Antennas”.
ng Structures and
C. Load
L Combination [LC]
C.1 The following load com
mbination sha
all be investigated when ca
alculating the maximum me
ember stresse
es
and structure reaction.
DL**DL + WL*WL
L W
Where : Basic Wind Speed
DL Dead Loa
ad Factor : 1.00
WL Wind Loa
ad Factor : 1.00
Oprattional Wind Sp
peed
DL Dead Loa
ad Factor : 1.00
WL Wind Loa
ad Factor : 0.49
Rev. No
o. : 00 P
PT. DIGJAYA MANDIRI
M TEKN
NIK
D. Classificitation of Structu
ures
Structures shall be classifie
ed according to Table 3-1 be
elow:
Table 3-1
Classification
C n of Structure
es
E. Topographic
c Categories
The topographic category fo
or a structure shall be assessed as being
g one of the fo
ollowing:
F. ategories
Exposure Ca
e category for a structure sh
The exposure hall be assesse
ed as being on
ne of the follow
wing:
1. Exposure B: Urban and d suburban areas, wooded d areas, or othher terrain with numerous closely space ed
obstructionns having the size of singlee-family dwellin
ngs or larger. Use ofthis exposure shall be
b limited thosse
areas for which
w terrain representative
r e of Exposure B surrounds thet structure in all directions for a distancce
of at least 2,630 ft [800 m] or ten time
es the height of
o the structuree, whichever iss greater.
Rev. No
o. : 00 P
PT. DIGJAYA MANDIRI
M TEKN
NIK
1.4 STR
RUCTURAL AN
NALYSIS CONDITION
The strucctural analysiss has been ca
arried out usin
ng MSTOWER
R. MSTOWER
R is a set of sspecialized pro
ograms, whicch
assist in the analysis and
a checking of latticed co
ommunication and transmisssion tower . T
The following condition werre
made in the
t structural analysis :
A. Tower Heightt
B. Extension
C. Tower Base Elevation
E
D. Structure shall be analyzed
d as a space frrame for lattice
ed structure and
a regarded a
as a linear elastic body.
m.hour-1 = 33..33 m.s-1 (< 5 Km From The
e Beach) and 100 km.hour-1
-
E. peed is 120 km
Basic wind sp = 27.78 m.ss-1
(> 5 Km From
m The Beach)
F. Limiting value
e of effective slenderness
s r
ratio (kL/r) for compression members of tthe structure shall
s preferab
bly
be 150 for leg
gs, 200 for face bracing, 250
0 for redundan
nt and 300 for Hip.
G. Maximum stre
ess ratio in the
e members is 1.0
H. The allowable
e displacemen wist and sway shall be desig
nt of lateral, tw m.hour-1 = 23.3
gned at 84 km 33 m.s-1 servicce
wind speed as follows :
Lateral : H/200, where H = Height of To
ower/Pole
For Tower
T (SST or
o MT)
Sway : 0.50 degree
Twisst : 0.50 degree
For Minipole
M or Mo
onopole
Sway : 1.00 degree
Twisst : 1.00 degree
Rev. No
o. : 00 P
PT. DIGJAYA MANDIRI
M TEKN
NIK
VIEW GOOGLE MAPS LOKASI SPLIT-CENTRAL-68PST MCP SOHO
EXTREME WIND MAP INDONESIA
ANNUAL PROBABILITY 0.02
100" 00" 00" 106' 00'00" 110' 00' 00" 116' 00' 00" 120·00· 00" 126' 00' 00" 130' 00" 00" 136' 0 0' 00" 140' 00' 00"
· oo· oo·
••
' 06° 00' 00"
t
,,
,..�
'00" 00"
'.,- ""
1�
.. ,-
., .
�
DO" 00' 00"
\,
' ��-·---r- (bi.-. �.
,
• 00' 00"
·�
� . .. :,#
v
\ 05" 00'00"
'00'00 " I
+ -+- 1D' 00' 00"
WOO'DO" 10<1' 00' 00 " 109' 0 0' 00" 114' 00' 00" 119" 00'00" 124' 00' 00" 129' 00' 00" 134' 00' 00" 139" 00' 00"
Genel'JII Rufes; - unluk site dekat dengan tap; pantai / laut (kurang dari 5 km} wind speed nya 120 kmlh
- untuk stte yang berjarak lebih dari 5 km dari tepi pantal / laut, wind speed nya 100 km/h
o
� 120 Km/H (Spec:I1I Wind Region) '} Area Danau Tba. Bantan, Madura. Bali & Pontianak
� 100 Km/H
Y
X
theta: 300 phi: 30
Y X
theta: 180 phi: 0
Z X
theta: 0 phi: 90
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F).td
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 2
15 Jan 2020
3:39 PM
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F).twr
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 2
15 Jan 2020
3:39 PM
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F).twr
PT. DIGJAYA MANDIRI TEKNIK
Job: SPLIT CENTRAL_EXISTING (EIA222F) 15 Jan 2020
SPLIT CENTRAL_EXISTING 03:39 PM
MONOPOLE 20M
Y
X
theta: 300 phi: 30
L O A D C A S E S
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F).rpt
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 2
Job: SPLIT CENTRAL_EXISTING (EIA222F) displacement 15 Jan 2020
SPLIT CENTRAL_EXISTING 3:46 PM
MONOPOLE 20M
L O A D C A S E S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F) displacement.rpt
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 2
Job: SPLIT CENTRAL_EXISTING (EIA222F) displacement 15 Jan 2020
SPLIT CENTRAL_EXISTING 3:46 PM
MONOPOLE 20M
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F) displacement.rpt
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 5
Job: SPLIT CENTRAL_EXISTING (EIA222F) displacement 16 Jan 2020
SPLIT CENTRAL_EXISTING 1:30 PM
MONOPOLE 20M
I N P U T / A N A L Y S I S R E P O R T
M A T E R I A L P R O P E R T I E S
T A B L E O F Q U A N T I T I E S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 5
Job: SPLIT CENTRAL_EXISTING (EIA222F) displacement 16 Jan 2020
SPLIT CENTRAL_EXISTING 1:30 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 3 of 5
Job: SPLIT CENTRAL_EXISTING (EIA222F) displacement 16 Jan 2020
SPLIT CENTRAL_EXISTING 1:30 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 4 of 5
Job: SPLIT CENTRAL_EXISTING (EIA222F) displacement 16 Jan 2020
SPLIT CENTRAL_EXISTING 1:30 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 5 of 5
Job: SPLIT CENTRAL_EXISTING (EIA222F) displacement 16 Jan 2020
SPLIT CENTRAL_EXISTING 1:30 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 3
Job: SPLIT CENTRAL_EXISTING (EIA222F) 15 Jan 2020
SPLIT CENTRAL_EXISTING 3:41 PM
MONOPOLE 20M
I N P U T / A N A L Y S I S R E P O R T
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F).p1
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 3
Job: SPLIT CENTRAL_EXISTING (EIA222F) 15 Jan 2020
SPLIT CENTRAL_EXISTING 3:41 PM
MONOPOLE 20M
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F).p1
PT. DIGJAYA MANDIRI TEKNIK Page 3 of 3
Job: SPLIT CENTRAL_EXISTING (EIA222F) 15 Jan 2020
SPLIT CENTRAL_EXISTING 3:41 PM
MONOPOLE 20M
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_EXISTING (EIA222F).p1
6. ANALYSIS FOR
PROPOSED
LOAD CONDITION
PT. DIGJAYA MANDIRI TEKNIK
Job: SPLIT CENTRAL_PROPOSED (EIA222F) 15 Jan 2020
PATI HOTEL_EXISTING 04:52 PM
MONOPOLE 20M
Y
X
theta: 300 phi: 30
Y X
theta: 180 phi: 0
Z X
theta: 0 phi: 90
MStower
D:\PUL-PULAN\08.
[V6.02.011: ]SPLIT CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F).td
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 3
15 Jan 2020
4:53 PM
MStower
D:\PUL-PULAN\08.
[V6.02.011:SPLIT
] CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F).twr
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 3
15 Jan 2020
4:53 PM
MStower
D:\PUL-PULAN\08.
[V6.02.011:SPLIT
] CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F).twr
PT. DIGJAYA MANDIRI TEKNIK Page 3 of 3
15 Jan 2020
4:53 PM
MStower
D:\PUL-PULAN\08.
[V6.02.011:SPLIT
] CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F).twr
PT. DIGJAYA MANDIRI TEKNIK
Job: SPLIT CENTRAL_PROPOSED (EIA222F) 15 Jan 2020
PATI HOTEL_EXISTING 04:53 PM
MONOPOLE 20M
Y
X
theta: 300 phi: 30
L O A D C A S E S
MStower
D:\PUL-PULAN\08.
[V6.02.011: SPLIT
] CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F).rpt
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 3
Job: SPLIT CENTRAL_PROPOSED (EIA222F) displacement 15 Jan 2020
PATI HOTEL_EXISTING 5:09 PM
MONOPOLE 20M
L O A D C A S E S
D:\PUL-PULAN\08.
MStowerSPLIT
[V6.02.011:
CENTRAL] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F) displacement.rpt
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 3
Job: SPLIT CENTRAL_PROPOSED (EIA222F) displacement 15 Jan 2020
PATI HOTEL_EXISTING 5:09 PM
MONOPOLE 20M
D:\PUL-PULAN\08.
MStowerSPLIT
[V6.02.011:
CENTRAL] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F) displacement.rpt
PT. DIGJAYA MANDIRI TEKNIK Page 3 of 3
Job: SPLIT CENTRAL_PROPOSED (EIA222F) displacement 15 Jan 2020
PATI HOTEL_EXISTING 5:09 PM
MONOPOLE 20M
D:\PUL-PULAN\08.
MStowerSPLIT
[V6.02.011:
CENTRAL] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F) displacement.rpt
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 5
Job: SPLIT CENTRAL_PROPOSED (EIA222F) displacement 15 Jan 2020
PATI HOTEL_EXISTING 5:09 PM
MONOPOLE 20M
I N P U T / A N A L Y S I S R E P O R T
M A T E R I A L P R O P E R T I E S
T A B L E O F Q U A N T I T I E S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStowerSPLIT
[V6.02.011:
CENTRAL] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 5
Job: SPLIT CENTRAL_PROPOSED (EIA222F) displacement 15 Jan 2020
PATI HOTEL_EXISTING 5:09 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStowerSPLIT
[V6.02.011:
CENTRAL] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 3 of 5
Job: SPLIT CENTRAL_PROPOSED (EIA222F) displacement 15 Jan 2020
PATI HOTEL_EXISTING 5:09 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStowerSPLIT
[V6.02.011:
CENTRAL] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 4 of 5
Job: SPLIT CENTRAL_PROPOSED (EIA222F) displacement 15 Jan 2020
PATI HOTEL_EXISTING 5:09 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStowerSPLIT
[V6.02.011:
CENTRAL] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 5 of 5
Job: SPLIT CENTRAL_PROPOSED (EIA222F) displacement 15 Jan 2020
PATI HOTEL_EXISTING 5:09 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStowerSPLIT
[V6.02.011:
CENTRAL] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 3
Job: SPLIT CENTRAL_PROPOSED (EIA222F) 15 Jan 2020
PATI HOTEL_EXISTING 5:06 PM
MONOPOLE 20M
I N P U T / A N A L Y S I S R E P O R T
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
MStower
D:\PUL-PULAN\08.
[V6.02.011: SPLIT
] CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F).p1
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 3
Job: SPLIT CENTRAL_PROPOSED (EIA222F) 15 Jan 2020
PATI HOTEL_EXISTING 5:06 PM
MONOPOLE 20M
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
MStower
D:\PUL-PULAN\08.
[V6.02.011: SPLIT
] CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F).p1
PT. DIGJAYA MANDIRI TEKNIK Page 3 of 3
Job: SPLIT CENTRAL_PROPOSED (EIA222F) 15 Jan 2020
PATI HOTEL_EXISTING 5:06 PM
MONOPOLE 20M
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
MStower
D:\PUL-PULAN\08.
[V6.02.011: SPLIT
] CENTRAL - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_PROPOSED (EIA222F).p1
7. ANALYSIS FOR
STRENGTHEN
LOAD CONDITION
PT. DIGJAYA MANDIRI TEKNIK
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) 17 Jan 2020
PATI HOTEL_EXISTING 01:08 PM
MONOPOLE 20M
Y
X
theta: 300 phi: 30
Y X
theta: 180 phi: 0
Z X
theta: 0 phi: 90
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F).td
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 1
17 Jan 2020
1:09 PM
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F).udp
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 3
15 Jan 2020
5:16 PM
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_STRENGTHENING (EIA222F).twr
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 3
15 Jan 2020
5:16 PM
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_STRENGTHENING (EIA222F).twr
PT. DIGJAYA MANDIRI TEKNIK Page 3 of 3
15 Jan 2020
5:16 PM
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\EIA222F\SPLIT CENTRAL_STRENGTHENING (EIA222F).twr
PT. DIGJAYA MANDIRI TEKNIK
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) 17 Jan 2020
PATI HOTEL_EXISTING 01:10 PM
MONOPOLE 20M
Y
X
theta: 300 phi: 30
L O A D C A S E S
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F).rpt
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 2
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) 17 Jan 2020
PATI HOTEL_EXISTING 1:10 PM
MONOPOLE 20M
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F).rpt
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 3
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement 17 Jan 2020
PATI HOTEL_EXISTING 1:18 PM
MONOPOLE 20M
L O A D C A S E S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement.rpt
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 3
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement 17 Jan 2020
PATI HOTEL_EXISTING 1:18 PM
MONOPOLE 20M
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement.rpt
PT. DIGJAYA MANDIRI TEKNIK Page 3 of 3
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement 17 Jan 2020
PATI HOTEL_EXISTING 1:18 PM
MONOPOLE 20M
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement.rpt
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 6
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement 17 Jan 2020
PATI HOTEL_EXISTING 1:29 PM
MONOPOLE 20M
I N P U T / A N A L Y S I S R E P O R T
M A T E R I A L P R O P E R T I E S
T A B L E O F Q U A N T I T I E S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 6
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement 17 Jan 2020
PATI HOTEL_EXISTING 1:29 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 3 of 6
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement 17 Jan 2020
PATI HOTEL_EXISTING 1:29 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 4 of 6
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement 17 Jan 2020
PATI HOTEL_EXISTING 1:29 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 5 of 6
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement 17 Jan 2020
PATI HOTEL_EXISTING 1:29 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 6 of 6
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement 17 Jan 2020
PATI HOTEL_EXISTING 1:29 PM
MONOPOLE 20M
N O D E D I S P L A C E M E N T S
D:\PUL-PULAN\08.
MStower [V6.02.011:
SPLIT CENTRAL
] - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F) displacement.p1
PT. DIGJAYA MANDIRI TEKNIK Page 1 of 3
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) 17 Jan 2020
PATI HOTEL_EXISTING 1:16 PM
MONOPOLE 20M
I N P U T / A N A L Y S I S R E P O R T
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F).p1
PT. DIGJAYA MANDIRI TEKNIK Page 2 of 3
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) 17 Jan 2020
PATI HOTEL_EXISTING 1:16 PM
MONOPOLE 20M
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F).p1
PT. DIGJAYA MANDIRI TEKNIK Page 3 of 3
Job: SPLIT CENTRAL_STRENGTHENING (EIA222F) 17 Jan 2020
PATI HOTEL_EXISTING 1:16 PM
MONOPOLE 20M
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
S U P P O R T R E A C T I O N S
MStower
D:\PUL-PULAN\08.
[V6.02.011: ] SPLIT CENTRAL - Cipaw\01. Analisa\SPLIT CENTRAL_STRENGTHENING (EIA222F).p1
8. ANALYSIS FOR
ANCHOR AND BASEPLATE
PERHITUNGAN BASE PLATE
SPLIT-CENTRAL-68/PST MCP SOHO
EXISTING CONDITION
Anchor
- Grade ASTM A325
- Fya = 660 MPa
- Fu = 120 ksi = 830.00 Mpa = 8466.00 Kgf
- FV = 0.3 FyA = 198.00 Mpa = 2019.60 Kgf
- FT = 0.5 FyA = 330.00 Mpa = 3366.00 Kgf
TOTAL AND DIAMETER ANCHOR = jumlah baut f diameter baut mm (ASTM A307)
8 f 24 mm (ASTM A307)
At anchor ( Total Luas Penampang Angkur ) = (A anchor x N) cm2 (total anchor in a leg baseplate)
At anchor ( Total Luas Penampang Angkur ) = 36.19 cm2 (total anchor in a leg baseplate)
Anchor strength :
fva (shear on anchor bolt) = S / At anchor
= 38.20 Mpa < FV Resume : OK !
1) Steel SS - 400
Fy = 2500 kg/cm2
2
A = 4069.44 cm (Luas penampang baseplate)
tpt =
tpt = 0.17 cm
tpm =
tpm = 1.61 cm
Anchor
- Grade ASTM A325
- Fya = 660 MPa
- Fu = 120 ksi = 830.00 Mpa = 8466.00 Kgf
- FV = 0.3 FyA = 198.00 Mpa = 2019.60 Kgf
- FT = 0.5 FyA = 330.00 Mpa = 3366.00 Kgf
TOTAL AND DIAMETER ANCHOR = jumlah baut f diameter baut mm (ASTM A307)
8 f 24 mm (ASTM A307)
At anchor ( Total Luas Penampang Angkur ) = (A anchor x N) cm2 (total anchor in a leg baseplate)
At anchor ( Total Luas Penampang Angkur ) = 36.19 cm2 (total anchor in a leg baseplate)
Anchor strength :
fva (shear on anchor bolt) = S / At anchor
= 49.11 Mpa < FV Resume : OK !
1) Steel SS - 400
Fy = 2500 kg/cm2
2
A = 4069.44 cm (Luas penampang baseplate)
t
tp = Tebal minimum Baseplate Berdasarkan Tension Force
tpt =
tpt = 0.18 cm
tpm =
tpm = 1.88 cm
Anchor
- Grade ASTM A325
- Fya = 660 MPa
- Fu = 120 ksi = 830.00 Mpa = 8466.00 Kgf
- FV = 0.3 FyA = 198.00 Mpa = 2019.60 Kgf
- FT = 0.5 FyA = 330.00 Mpa = 3366.00 Kgf
TOTAL AND DIAMETER ANCHOR = jumlah baut f diameter baut mm (ASTM A307)
8 f 24 mm (ASTM A307)
At anchor ( Total Luas Penampang Angkur ) = (A anchor x N) cm2 (total anchor in a leg baseplate)
At anchor ( Total Luas Penampang Angkur ) = 36.19 cm2 (total anchor in a leg baseplate)
Anchor strength :
fva (shear on anchor bolt) = S / At anchor
= 48.65 Mpa < FV Resume : OK !
1) Steel SS - 400
Fy = 2500 kg/cm2
2
A = 4069.44 cm (Luas penampang baseplate)
tpt =
tpt = 0.18 cm
tpm =
tpm = 1.87 cm