Formworks Installation of Plywood for Feb 4 - Feb 12 9 Just waited for the billing
flooring of second floor so the materials can be delivered on site
Roofing Works Fabrication of Steel trusses 10 Depend on the delivery of materials on site
Installation of Steel trusses 5 Can fabricate the trust anytime
and install it after finishing the column
Masonry Works Plastering of Wall Mar-01 8 to 10 at roofdeck
Can do 14 days after pouring
(We will remove some of horizontal braces.)