Wastewater Flow Rate: Chapter II: Wastewater Engineering CE 524

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 34

Chapter II: Wastewater Engineering CE 524

Wastewater Flow Rate

Determining the rates of wastewater flow is a fundamental step in the design of


wastewater collection, treatment, and disposal facilities. In situation where wastewater flow rate
data are limited or unavailable, wastewater flow rate estimates have to be developed from water
consumption records and other information. Estimated residential flow rates need to account for
not only averages, but peak flows that continue for days can include hydraulic failure.

To develop a basis for properly assessing wastewater flow rates for a community, the
following subjects should be considered.

 Definition of the various components that make up the wastewater flow rates.
 Definition of the types of sewer.
 Identifying the sources of the sewage.
 Estimating the quantities of sewage from these sources.
 Project population and land use up to the expected life or design period of the
planned sewer system.
 Explain the variations of wastewater flow.
 Distinguish the relationship of either peak flow or minimum flow to average
wastewater flow.

Fig. 1 Urban Wet


Weather Flows

Cataylo, Clata, dela Peña, Yurong Page 1


Chapter II: Wastewater Engineering CE 524

Wastewater Flow Components

The components that make up the wastewater flow from a community depend on the type
of collection system used and may include the following:

 Domestic (also called sanitary) Wastewater – Wastewater discharged from residences


and from commercial, institutional, and similar facilities.

 Industrial Wastewater – Wastewater in which industrial wastes predominate.

 Infiltration/Inflow (I/I) – I/I enters the collection system in a variety of ways. Some of
the most common sources of I/I are presented in Figure 2. Infiltration is defined as
storm water flows that enter the collection system by percolating through the soil
and then through defects in pipelines, manholes, and joints. Examples of defects
that allow infiltration into the collection system are cracked or broken pipes,
misaligned joints, deteriorated manholes, and root penetration. Inflow is definedas
storm water that enters the collection system via a direct connection to the system.
A few examples of inflow are downspout connections, foundation or yard drains,
leaky manhole covers, and illegal storm drain connections. The adverse effects of
I/I entering the collection system is that they increase both the flow volume and
peak flows in the system so that it is operating at or above its capacity. Excessive
I/I in the sanitary sewer collection system is the leading cause of sanitary sewer
overflows (SSOs).

Cataylo, Clata, dela Peña, Yurong Page 2


Chapter II: Wastewater Engineering CE 524

Fig. 2 Typical Sources of Inflow and Infiltration Sanitary Sewer Master Plan

 Storm Water – Runoff resulting from rainfall and snowmelt.

Therefore, wastewater flows in sanitary sewers consists of three major components:


(1) Domestic Wastewater,
(2) Industrial Wastewater, and
(3) Infiltration/Inflow.

The percentage of wastewater components varies with local conditions and the time of the
year.

 For areas served with sewers, wastewater flow rates are commonly determined from
existing records or by direct field measurements.

 For new developments, wastewater flow rates are derived from an analysis of population
data and corresponding projected unit rates of water consumption or from estimates of
per capita wastewater flow rates from similar communities.

Cataylo, Clata, dela Peña, Yurong Page 3


Chapter II: Wastewater Engineering CE 524

 If field measurements of wastewater flow rates are not possible and actual wastewater
flow rate are not available, water supply records can often be used as an aid to estimate
wastewater flow rates.

 Where water supply records are not available, useful data for various types of
establishments and water-using devices are provided for making estimates of wastewater
flow rates.

Sewers and Types of Sewers

Sewer is a pipe or conduit carrying sewage. Sewers are usually not flow full (Gravity
Full). The full flowing sewers are called force main as the flow is under pressure.

Sewerage System
 Separate system. In this system the sanitary sewage and storm water are carried
separately in two set of sewers.
 Combined sewerage system. In this system the sewage and storm water are carried
combine in only one set of sewers to the waste water.
 Partially separate sewerage system. This system is the compromise between separate
and combine system taking the advantages of both systems.

Types of Sewer according to material:


1. Asbestos Cement (AC) Sewer
Types of sewer like Asbestos Cement (AC) Sewers
are manufactured from a mixture of cement and asbestos
fiber. Asbestos Cement (AC) Sewers are suitable for
carrying domestic sanitary sewage. Asbestos cement
sewer is best as vertical pipe for carrying sullage from
upper floors of multistory buildings (in two pipe system of
plumbing).
2. Brick Sewers

Cataylo, Clata, dela Peña, Yurong Page 4


Chapter II: Wastewater Engineering CE 524

Cataylo, Clata, dela Peña, Yurong Page 5


Chapter II: Wastewater Engineering CE 524

These types of sewer (Brick Sewers) are made at site and used for construction
large size sewer. Brick Sewers are very useful for construction of storm sewer or
combined sewer. Nowadays brick sewers are replaced by concrete sewer. Brick sewers
my get deformed and leakage may take place. A lot of labour work is required.

3. Cement Concrete
PCC - for dia upto 60 cm
Suitable for small storm drains. Not
durable.
RCC - for dia > 60 cm
They may be cast in situ or precast,
resistant to heavy loads, corrosion and high
pressure. These are very heavy and difficult to transport.

4. Cast Iron (CI) Sewers


These types of sewer are High strength and durability water tight. Cast Iron
sewers can withstand high internal pressure and can bear external load. Cast Iron sewers
are suitable for the following conditions.

 When the sewage is conveyed under high


pressure
 When the sewer line is subject to heavy
external load e.g. under railway line,
foundation wall etc, below highways.

Cataylo, Clata, dela Peña, Yurong Page 6


Chapter II: Wastewater Engineering CE 524

 When there is considerable difference in temperature

5. Steel Sewers
These types of sewer (steel sewers) are
Impervious, light, resistant to high pressure, flexible,
suitable when;
 The sewage is carried under pressure
 The sewage has to be carried across a river
under water
 The sewer has to cross under a railway track
 They are generally used for outfall and trunk
sewers

6. Plastic Sewers
Nowadays PVC sewers are used for
carrying sewage. Plastic sewers are resistant
to corrosion. Such types of sewer are light in
weight, smooth and can be bent easily. But
these types of sewer (Plastic sewers) are
having high co-efficient of thermal expansion
and cannot be used in very hot areas.

SOURCES OF SEWAGE

Sources and Rates of Domestic and Industrial Wastewater Flows

Cataylo, Clata, dela Peña, Yurong Page 7


Chapter II: Wastewater Engineering CE 524

1. Domestic Wastewater - Wastewater which is principally derived from sanitary


conveniences of residences or produced by normal residential activities.

 Small residential districts – wastewater flows determined based on population


density and average per capita contribution of wastewater.

 Large residential districts – wastewater flows developed based on land use areas
and anticipated population density (typically rates are based on wastewater flows
from nearby areas).

 If data is unavailable, estimate 70% of the domestic water-withdrawal rate is


returned to the sanitary sewer system.

 In all cases, should try to obtain local wastewater flows for a similar area.

2. Industrial Wastewater

 Without internal reuse: 85-95% of the water used will probably become
wastewater.

 With internal water reuse, separate estimates must be made.

 Average wastewater may vary from 30-95 L/capita/day

3. Infiltration and Inflow

Cataylo, Clata, dela Peña, Yurong Page 8


Chapter II: Wastewater Engineering CE 524

 Infiltration – groundwater entering sewers through defective joints, and broken or


cracked or broken pipes and manholes. High during wet period, especially sewers
constructed in or close to streambeds.

 Inflow – the water discharged into a sewer system including service connections from
such sources as roof downspouts; basement, yard, and area drains; manhole covers,
surface runoff, street wash water; etc.

Units: L/ha/day, L/km length, or L/cm diameter


Quantity may vary from 35 to 115 m3/km

Infiltration to Sanitary Sewer Systems Inflow to Sanitary Sewer Systems


Water entering a sewer system from surface
sources such as:
a. Leaking manhole covers
Groundwater/percolating water in the subsurface b. Directly connected roof gutters
entering a sewer system through: c. Cellar or foundation drains
a. Defective pipes d. Cross connections from storm drains
b. Leaking pipe joints and combined sewers
c. Poor connections e. Yard and area drains
d. Cracked manhole walls f. Cooling-water discharges
e. Etc. g. Drains from springs and swampy
areas
h. Street wash water
i. Etc.

Quantity Estimation of Sewage

Accurate estimation of sewage discharge is necessary for hydraulic design for sewers. Far
lower estimation than reality will soon lead to inadequate sewer size after commissioning of the
scheme or the sewers may not remain adequate for the entire design period. Similarly, very high
discharge estimated will lead to larger sewer size affecting economy of the sewerage scheme,
and the lower discharge actually flowing in the sewer may not meet the criteria of the self-
cleansing velocity and hence leading to deposition in the sewers.

Evaluation of Sewage Discharge

Cataylo, Clata, dela Peña, Yurong Page 9


Chapter II: Wastewater Engineering CE 524

Correct estimation of sewage discharge is necessary; otherwise sewers may prove


inadequate resulting in overflow or may prove too large in diameter, which may make the system
uneconomical and hydraulically inefficient. Hence, before designing the sewerage system it is
important to know the discharge/quantity of the sewage, which will flow in it after completion of
the project and at the end of design period.

Apart from accounted water supplied by water authority that will be converted to
wastewater, following quantities are considered while estimating the sewage quantity.

a. Addition Due to Unaccounted Private Water Supplies

People using water supply from private wells, tube walls, etc., contribute to the
wastewater generation more than the water supplied by municipal authority.
Similarly, certain industries utilize their own source of water. Part of this water
after desired uses is converted into wastewater and ultimately discharged into
sewers. This quantity can be estimated by actual field observations.

b. Addition Due to Infiltration

This is additional quantity due to groundwater seepage into sewers through faulty
joints or cracks formed in the pipes. The quantity of the water depends upon the
height of the water table above the sewer invert level. If water table is well below
the sewer invert level, the infiltration can occur only after rain when water is
moving down through soil. The quantity of the water entering sewers depends
upon the permeability of the ground soil and it is very difficult to estimate. While
estimating the design discharge, following suggested discharge can be considered.

Suggested estimates for ground water infiltration for sewers laid below ground
water table (CPHEEO Manual, 1993).

Cataylo, Clata, dela Peña, Yurong Page 10


Chapter II: Wastewater Engineering CE 524

UNIT MINIMUM MAXIMUM


L/ha.d 5000 50 000
L/km.d 500 5000
L per day manhole 250 500

Storm water drainage may also infiltrate into sewers. This inflow is difficult to
calculate. Generally, no extra provision is made for this quantity. This extra
quantity can be taken care of by extra empty space left at the top in the sewers,
which are designed for running ¾ full at maximum design discharge.

c. Subtraction Due to Water Loss

The water loss through leakage in water distribution system and house
connections, does not reach consumers and hence, not appear as sewage.

d. Subtraction Due to Water Not Entering the Sewerage System

Certain amount of water is used for such purposes, which may not generate
sewage; e.g. boiler feed water, water sprinkled over the roads, streets, lawns, and
gardens, water consumed in industrial product water used in air coolers, etc.

e. Net Quantity of Sewage

The net quantity of sewage production can be estimated by considering the


addition and subtraction as discussed above over the accounted quantity of water
supplied by water authority as below:

Net Accounted Addition due Addition Subtraction Subtraction


Quantity = quantity of + to unaccounted + due to - due to water - due to water
of Sewage water private water infiltration losses not entering
supplied supplies the sewage
from the system
water works

Cataylo, Clata, dela Peña, Yurong Page 11


Chapter II: Wastewater Engineering CE 524

Generally, 75 to 80% of accounted water supplied is considered as quantity of sewage


produced.

POPULATION FORECASTING

Design of water supply and sanitation scheme is based on the projected population of a
particular city, estimated for the design period. Any underestimated value will make system
inadequate for the purpose intended; similarly overestimated value will make it costly. Changes
in the population of the city over the years occur, and the system should be designed taking into
account of the population at the end of the design period.

Objective: to project population and land use up to the expected life or design period of the
planned sewer system.

Factors affecting changes in population are:

 Increase due to births


 Decrease due to deaths
 Increase or decrease due to migration

The present and past population record for the city can be obtained from the census
population records. After collecting these population figures, the population at the end of design
period is predicted using various methods as suitable for that city considering the growth pattern
followed by the city.

When planning and designing infrastructure for sewerage and water supply, the utility
has to forecast the future population. Things to consider are design period, land use, and service
life.

Cataylo, Clata, dela Peña, Yurong Page 12


Chapter II: Wastewater Engineering CE 524

 Design Period is the time period or duration that the capacity of the sewerage facility is
anticipated to be adequate to service its tributary area. Before commencing the facility
design, the design period must be determined.
 Land Use helps define population densities and types of contributors to wastewater flows
within the tributary area. Zoning maps and field review of land use can be used to verify
the reasonableness of long range projections.

 Service Life or Operational Life of a sewage facility should exceed the design period of
the facility, provided it is designed, constructed, and maintained properly.

Population Estimate

For the tributary area, the population estimate is the basis for computing the design flow.
It is customary to multiply the estimated population by the estimated per capita wastewater
contribution. Generally, population projections for land use planning have shorter projection
periods than are required for the design period for sewerage facilities.

Projections are conditional statements about the future. A Population Projection is:

 An extrapolation of historical data into the future.

 An attempt to describe what is likely to happen under certain explicit assumptions about
the future as related to the immediate past.

 A set of calculations, which show the future course of fertility, mortality and migration
depending on the assumptions used.

Population Estimate based on Land Use

 Residential

Density Population/Hectare
Single Family (greater than 10 frontage) 50 persons/hectare
Single Family (less than 10 frontage) 70 persons/hectare
Semi-detached 70 persons/hectare
Row dwelling 175 persons/hectare

Cataylo, Clata, dela Peña, Yurong Page 13


Chapter II: Wastewater Engineering CE 524

Apartment 475 persons/hectare

 Apartments

If the proposed population equivalent is greater than 475 person/hectare. Based on


the rate of 2.7 people per unit (ppu) then the calculated population equivalent shall be
used for design.
Population 2.7 ppu ×(number of units)
=
hectare area
 Industrial
For light industries areas, use an equivalent population of 50 persons per hectare.
 Commercial
For commercial areas, use an equivalent population of 50 persons per hectare.
 Institutional

Equivalent population per site as follows:

• Junior Public Schools

1
× number of students (600 students minimum)
3

• Senior Public School

1
×number of students (900 students minimum)
2

• Secondary Schools

2
× number of students (1500 students minimum)
3

• Hospitals

Apply population equivalent of 3 persons per bed

Population Projection Method

Cataylo, Clata, dela Peña, Yurong Page 14


Chapter II: Wastewater Engineering CE 524

 Arithmetic Increase Method

This method is suitable for large and old city with considerable development. If it is used
for small, average or comparatively new cities, it will give lower population estimate than actual
value. In this method the average increase in population per decade is calculated from the past
census reports. This increase is added to the present population to find out the population of the
next decade. Thus, it is assumed that the population is increasing at constant rate.

A population growing arithmetically would increase by a constant number of people in


each period. Arithmetic change produces a linear trend in population growth – following a
straight line rather than a curve.

Pn = P + (n*i)

Pn = population of nth years


P = population of the last year of interval
i = average arithmetic rate of increase
n = time interval (year, decade, etc.)

Example:
Population in year 1971 = 120
Average increase per decade = i = 8.57

1981 = population + (n*i), where n=1 decade = 120 + 1*8.57 = 128.57


1991 = population + (n*i), where n=2 decades = 120 + 2*8.57 = 137.14
2001 = population + (n*i), where n=3 decades = 120 + 3*8.57 = 145.71
2021 = population + (n*i), where n=5 decades = 120 + 5*8.57 = 163.7

 Geometric Increase Method

In this method the percentage increase in population from decade to decade is assumed to
remain constant. Geometric mean increase is used to find out the future increment in population.

Cataylo, Clata, dela Peña, Yurong Page 15


Chapter II: Wastewater Engineering CE 524

Since this method gives higher values and hence should be applied for a new industrial town at
the beginning of development for only few decades.

Geometric growth quickly leads to greater numbers. Geometric population growth is


analogous to the growth of a bank balance receiving compound interest.

Pn = P*(1+ i)n

Example:

Population in year 1971 = 120


Average percentage increase per decade = 10.66%

Population for the years:

1981 = population*(1+i/100) n

= 120*(1+10.66/100) = 132.8

1991 = population*(1+i/100) n

= 120*(1+10.66/100)2 = 146.95

2001 = population*(1+i/100) n

= 120*(1+10.66/100)3 = 162.60

2021 = population*(1+i/100) n

= 120*(1+10.66/100)5 = 199.129

1994 = 146.95 + (15.84*3/10) = 151.70

 Incremental Increase Method

This method is modification of arithmetical increase method and it is suitable for an


average size town under normal condition where the growth rate is found to be in increasing
order. While adopting this method the increase in increment is considered for calculating future
population. The incremental increase is determined for each decade from the past population and
the average value is added to the present population along with the average rate of increase.

Cataylo, Clata, dela Peña, Yurong Page 16


Chapter II: Wastewater Engineering CE 524

Pn = P + average increase per year /decade + average incremental increase

Example:
Population in year 1971 = 120
Average increase per decade = i = 11.57
1981 = population 1971 + 11.57 = 120 + 11.57 = 131.57
1991 = population 1981 + 11.57 = 131. 57 + 11.57 = 143.14
1994 = population 1991 + 11.57*3/10 = 143.14 + 3.47 = 146.61
2021 = population 1971 + 11.57*5 = 120 + 11.57*5 = 177.85

 Ratio Method

The population (or population change) of a smaller area is expressed as a proportion of


the population (or population change) of a larger area in which the smaller area is located.

P2 P
= 1 =K R
P 2 R P1 R

P2= Projected population


P2R= Projected population in the larger region
P1= Population at last census for the projected region
P1R= Population at last census for the projected region in the larger region
KR= ratio or correlation constant

Example:
Population at last census for the projected smaller region = 375
Population at last census for the projected larger region = 89,908
Projected Population in the larger region = 126,284

KR = 375/89,908 = 0.00417
P2 = 126,284*0.00417 = 527

Cataylo, Clata, dela Peña, Yurong Page 17


Chapter II: Wastewater Engineering CE 524

 Logistic Curve Method

The integrated form of the exponential equation permits calculation of population


doubling times.

pt = po e rt

Where:
• Pt = population ¿ a time

• Po =population ¿ an earlier time

• e=constant natural base ( 2.71878 )


• r =per capita rate of population change
• t=time∈ years

 NSO Population Projection

Nso formula: Pn = Po(1+r)^t

Pn
r= ( ( ))
antilog log
Po
−1

Where:

• R = population growth rate


• T = time interval between pn and po
• Pn = population at a later time
• Po = population at an earlier time

Cataylo, Clata, dela Peña, Yurong Page 18


Chapter II: Wastewater Engineering CE 524

Typical Population Densities per Hectare

Average for city residential 75 – 100


Single family dwellings 12 – 37
Sparsely built-up areas with small lots 37 – 55
Closely built-up areas with small lots 55 – 250
Multiple family dwellings 250 – 2500
Apartment and tenement districts 40 – 75
Commercial 40 – 75
Industrial 12 – 40

Domestic Wastewater
RESIDENTIAL DISTRICTS
Basis for Average Flowrate Computation
• Population density, Pd and average per capita contribution of wastewater, q
Ave. Flow rate, Qa=(Pd)(A)(q)
• Percentage of the domestic water withdrawal rate
Ave. Wastewater Flow rate, Qw=(k)(Qa)
Where:
Qa= average domestic water withdrawal rate
K= percentage (range 60-85%), approximately 70%

COMMERCIAL DISTRICTS
• Use table

• Unit flow range 42-1500 m3/ha.d

INDUSTRIAL WASTEWATER FLOWS


Factors:

• Type and size of industry

• Supervision

Cataylo, Clata, dela Peña, Yurong Page 19


Chapter II: Wastewater Engineering CE 524

• Degree of water reuse

• Onsite wastewater treatment method used, if any

Typical Design Value:


For no-wet process-type industries
qi= 50m3/ha.d or 5000 gal/acre.day
Ave. Flow rate, Q=qi.A

INFILTRATION/INFLOW
This is the total quantity of water from both infiltration and inflow without distinguishing the
source.
Factors affecting rate and quantity of infiltration/inflow:
 Quality of sewer material
 Workmanship
 Type of soil
 Groundwater condition
 Topography
 Length of pipes and conduits
 Area serves
 Age of sewers

Infiltration Design Allowances for new sewers


For A≤40 has ia=11.4m3/ha.d
For A>40 has ia=33.5 A-2.292 m3/ha.d

Where: ia=average infiltration rate


A=service area in hectares
Ave. infiltration flow rate, Ia=ia(A)(m3/d)

VARIATIONS IN WASTEWATER FLOWS

Cataylo, Clata, dela Peña, Yurong Page 20


Chapter II: Wastewater Engineering CE 524

Important in designing the different components of the wastewater collection, treatment, and
disposal systems.
affect the amount of water used (for example, the number of residents, bedrooms, customers,
students, patients, seats, or meals served).

Figure 3.
Wastewater
Treatment Plant
Flow Diagram

Whether a
system serves a single home or an entire community, it must be able to handle fluctuations in
the quantity and quality of wastewater it receives to ensure proper treatment is always
provided. Systems that are inadequately designed or hydraulically overloaded may fail to
provide treatment and allow the release of pollutants to the environment. To design systems
that are both as safe and as cost-effective as possible, engineers must estimate the average
and maximum (peak) amount of flows generated by various sources.

Cataylo, Clata, dela Peña, Yurong Page 21


Chapter II: Wastewater Engineering CE 524

The number, type, and efficiency of all water-using fixtures and appliances at the source is
factored into the estimate (for example, the number and amount of water normally used by
faucets, toilets, and washing machines), as is the number of possible users or units that can

Figure 4. A diagram of a wastewater system showing greywater feeding out of the bathroom
and laundry

Because extreme fluctuations in flow can occur during different times of the day and on
different days of the week, estimates are based on observations of the minimum and
maximum amounts of water used on an hourly, daily, weekly, and seasonal basis. The
possibility of instantaneous peak flow events that result from several or all water-using
appliances or fixtures being used at once also is considered.

 Daily variation: usually, peak flow (maximum flow) occurs around lunchtime, while
minimum flow is during nighttime. According to studies, water use in many homes is
lowest from about midnight to 5 a.m., averaging less than one gallon per person per
hour, but then rises sharply in the morning around 6 am. to a little over 3 gallons per
person per hour. During the day, water use drops off moderately and rises again in the
early evening hours.

Cataylo, Clata, dela Peña, Yurong Page 22


Chapter II: Wastewater Engineering CE 524

Cataylo, Clata, dela Peña, Yurong Page 23


Chapter II: Wastewater Engineering CE 524

Figure 5. Short – term variations

 Weekly variation: Weekly peak flows may occur in some homes on weekends,
especially when all adults work during the week. The maximum day of the week is
usually the first day of the week (Sat) and the minimum is the last day of the week
(Fri).

 Monthly variation: maximum month is usually during summer and minimum month
is during winter.

Peak flows at stores and other businesses typically occur during business hours and
during meal times at restaurants. Rental properties, resorts, and commercial
establishments in tourist areas may have extreme flow variations seasonally

Cataylo, Clata, dela Peña, Yurong Page 24


Chapter II: Wastewater Engineering CE 524

Figure 6. Seasonal variations

Estimating flow volumes for centralized treatment systems is a complicated task,


especially when designing a new treatment plant in a community where one has never
existed previously. Engineers must allow for additional flows during wet weather due to
inflow and infiltration of extra water into sewers. Excess water can enter sewers through
leaky manhole covers and cracked pipes and pipe joints, diluting wastewater, which
affects its overall characteristics. This can increase flows to treatment plants sometimes
by as much as three or four times the original design load.

Figure 7. Inflow and Infiltration

MINIMUM AND PEAK FLOWS OF WASTEWATER

Minimum Flow Factor, fm= ratio of minimum flow to average flow


Qm
fm = Qa < 1

Approximate equation:

fm = 0.051p0.199
where: p=population
Peaking factor, fp= ratio of peak flow to average flow

Cataylo, Clata, dela Peña, Yurong Page 25


Chapter II: Wastewater Engineering CE 524

Qp
fp = Qa must be > 1

for population, p ≤ 1000: fp =5


for population, p >1000: fp =15.73p-0.166
Peak Infiltration Rates, ip = ratio of peak flow to average flow
• For old sewers:
ip = 69.16A-0.155 (m3/ha.d)
• For new sewers:
When A ≤ 40 has: ip = 18.5 (m3/ha.d)
When A ≤ 40 has: ip = 54.0A-0.292 (m3/ha.d)
Therefore,
i 18.5
f pi= p = =1.62
i a 11.4

i 54.0
f pi= p = =1.61
i a 33.5

∴ f pi=1.60

Average peak infiltration flow, I p=i p A (m3/ha.d)

DESIGN FLOWS

1. Infiltration and interflow (71 to 140 m3 /d/km)


2. Flow from the service connections
Design period: usually of the order of 50 years

Variation in flow:

Q peak 5.5
=
Qave P 0.18
( )
1000

Cataylo, Clata, dela Peña, Yurong Page 26


Chapter II: Wastewater Engineering CE 524

Q min P 0.16

Q ave
=0.2 (
1000 )
P= population of the service area

Example Problem: You are required to estimate the peak and minimum sewage flows for a
town having an area of 2500 ha. The residential area is 60% of the total area, whereas
commercial and industrial areas are 30% and 10% of the total area, respectively. Of the
residential area, 40% are large lots, 55% small single-family lots and 5% multistory apartments.
The wastewater from the residential area is estimated to be 800 Lpcd. The sewage from
commercial and industrial areas is estimated to be 25000 L/ha/d and 40000 L/ha/d, respectively.

Solution: Table 1. The Population and Flow for Each Area

Density
Type Area(ha) Population Flow (m3 /s)
(persons/ha)
Large lots 0.4(1500) = 600 6 3,600 0.03
Small single 0.55(1500) =
75 61,875 0.57
family lots 825
Multistory
0.05(1500) = 75 2500 187,500 1.74
apartments
Total 252,975 2.34

Commercial sector = 30% of 2500 ha = 750 ha

Average flow from commercial sector = 750x25,000 L/d= 0.22 m3 /s

Cataylo, Clata, dela Peña, Yurong Page 27


Chapter II: Wastewater Engineering CE 524

Industrial sector = 10 % of 2500 ha = 250 ha

Average flow from industrial sector = 250x40,000 L/d = 0.12 m3 /s

Thus, Average wastewater flow (excluding I/I) = 2.34+0.22+0.12 = 2.68 m3 /s

Assuming total population is equal to residential population, i.e.

P= 252,975

Then,

Q peak 5.5 5.5


= 0.18
= =2.0
Qave P (252.975)0.18
( )
1000
Qmin P 0.16

Qave
=0.2 (
1000 ) =0.2(252.975)0.16=0.48

Hence,
Peak flow = Peak factor x wastewater + I/I = 2.0(2.68) + 0.03= 5.39 m3 /s
Minimum flow = 0.48(2.68) + 0.03 = 1.32 m3 /s

AVERAGE FLOW RATE VERSUS PEAK FLOW RATES

The common practice of using discharge figures found in reference books (e.g., Metcalf
and Eddie) tend to be gross averages, meaning half of the septic systems based on this averages
are over-designed and half are under-designed (Kaplan, 1988). Maximum and minimum flows
and instantaneous peak flow variations are necessary factors in properly sizing and designing

Cataylo, Clata, dela Peña, Yurong Page 28


Chapter II: Wastewater Engineering CE 524

system components (Tchobanoglous and Burton, 1991). The system should be capable of
accepting and treating normal peak events without compromising performance (Tchobanoglous
and Burton, 1991).

Because peak flows can occur for a number of days, it is recommended that a peaking
factor of 2.5 be used for the design of downstream treatment processes of septic tanks (Crites and
Tchobanoglous, 1998). Table 2 provides peaking factors for wastewater flows from individual
residences, small commercial establishments, and small communities (Crites and
Tchobanoglous, 1998).

Table 2. Peaking Factors For Wastewater Flows From Individual Residences, Small Commercial
Establishments, And Small Communities

Small commercial
Individual residence Small community
Peaking factor establishment
Range Typical Range Typical Range Typical
Peak hour 4-10 4 6-10 4 3-6 4
Peak day 2-5 2.5 2-6 3.0 2-4 2.5
Peak week 1.25-4 2.0 2-6 2.5 1.5-3 1.75
Peak month 1.15-3 1.5 1.25-4 1.5 1.2-2 1.25

In many states it is quite common to use a flow allowance for design of 150 gpd per
bedroom, which in theory accounts for peak flow (Crites and Tchobanoglous, 1998). These same
authors recommend that a per capita design allowance, based on peak flow, be used for design.
Table 3 provides a comparison of design flows based on a per capita allowance times a peaking
factor versus design flows based on a per bedroom allowance (Crites and Tchobanoglous, 1998).

Table 3. Comparison Of Design Flows Based On A Per Capita Allowance Times A Peaking
Factor Versus Design Flow Based On A Per Bedroom Allowance

Cataylo, Clata, dela Peña, Yurong Page 29


Chapter II: Wastewater Engineering CE 524

Design flow
Flowrates Design flow
based on per
Number of Number , Peaking based n peak,
bedroom
bedrooms of persons gal/capita. factor per capita
allowance,
d flow, gal//d
gal/d

1 2 55 2.5 275 150

2 3 48 2.5 360 300

3 4 45 2.5 450 450

4 5 42 2.5 525 600

DESIGN FLOW

Minimum Flowrate

• Important in designing pipes and channels in the wastewater treatment plant.

• Flow should be designed to prevent suspended solid from deposition in the piping
system.

• The minimum velocity required to keep organic solids in suspension is 1.0 ft/sec
(.3 m/s).

• The minimum velocity required keeping silt and fine sand in suspension is 2.0
ft/sec (.6 ft/sec).

Design Flowrate

• Usually assumed to be the average daily flow at the end of the design period of
the system.

Cataylo, Clata, dela Peña, Yurong Page 30


Chapter II: Wastewater Engineering CE 524

• The average daily flow is considered to be the average daily flow for a continue
12- months period.

• The design flow rate is used in determining:

1. The organic loading to the treatment plant

2. Sizing primary, secondary, and tertiary treatment units

3. Sludge treatment and handling facilities

Maximum Flowrate

• Is the peak hourly flow rate plus flow rate due to infiltration and inflow.

• The maximum flow is important in determining:

1. The hydraulic capacity of collection system.

2. The hydraulic capacity of treatment plant.

Average Daily Flow

Occurring over a 24- hour period based on annual flow rate. The the average daily
flowrate is used in evaluating treatment plant capacity and in developing flowrate ratios used
in design.

Maximum Daily Flow

Calculate on over a 24- hour period based on annual operating data. The maximum
daily flowrate is important particularly in the design of facilities involving retention time
such as equalization basins.

Peak Hourly Flow

The peak sustained hourly flowrate occurring during a 24- hour period based on
annual operating date. Data on peak hourly flows are needed for the design of collection and

Cataylo, Clata, dela Peña, Yurong Page 31


Chapter II: Wastewater Engineering CE 524

interceptor sewers, wastewater-pumping stations, wastewater flow meters, sedimentation


tanks and channels in the treatment plant.

Minimum Daily Flow

The flow rate occurs over a 24-hour period based on annual operating data. Minimum
flow rates are important in the sizing of the conduits where solids deposition might occur at
low flow rates.

Minimum Hourly Flow

The minimum sustained hourly flow rate occurring over 24-hour period based on
annual operating data. Data on the minimum hourly flow rate are needed to determine
possible process effects and for sizing of wastewater flow-meters, particularly those that pace
chemical-feed systems. At some treatment facilities, such as those using trickling filters,
recirculation of effluent is required to sustain the process during low-flow period. For
wastewater pumping, minimum flow rates are important to ensure that the pumping systems
have adequate turndown to match the low flow rates.

Cataylo, Clata, dela Peña, Yurong Page 32


Chapter II: Wastewater Engineering CE 524

REFERENCES
http://site.iugaza.edu.ps/safifi/files/2010/02/2-Wastewater_Flowrate__WWT.pdf
http://faculty.kfupm.edu.sa/CE/abukhari/Courses/CE370/Lectures/Wastewater
%20Characteristics_Quantity.pdf
https://engineering.purdue.edu/~frankenb/NU-prowd/wwater.htm
http://www.hawkmeasure.com/refdetail.asp?id=116
http://ahmadsana.tripod.com/Courses/wre/sewernet.pdf
https://nptel.ac.in/courses/105105048/M5L5.pdf
https://www.google.com.ph/url?
sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=0ahUKEwiYt9rSnMHX
AhVCsJQKHXSOCukQjRwIBw&url=https%3A%2F%2Friverdalesupply.com%2Fwaste-water
%2F&psig=AOvVaw1s_k_tUgkD4l-_0j-CALnb&ust=1510856016319569
https://www.google.com.ph/url?
sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=0ahUKEwjC0pzlnMHX
AhXKoZQKHeZzCGkQjRwIBw&url=https%3A%2F%2Ftwitter.com
%2Fwater_ewa&psig=AOvVaw35rmvStf00m2VtcDzXZ3eT&ust=1510850846791364
https://www.google.com.ph/url?
sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=0ahUKEwi7ieP1nMHX
AhXGoZQKHezQALEQjRwIBw&url=http%3A%2F%2Fwww.lenzyme.com
%2FDrainfield_Education.html&psig=AOvVaw0zhhjXHLsslpEfytU9bJhL&ust=151084973596
7345
http://amanzimatters.co.za/amanzi/wp-content/uploads/2012/12/Septic_Tank_20090530.jpg
https://www.kullabs.com/classes/subjects/units/lessons/notes/note-detail/7415
file:///C:/Users/drexler%20g.%20barte/Downloads/ADH7-
Sanitary_Sewer_Systems_March_2016.pdf
file:///C:/Users/drexler%20g.%20barte/Desktop/Engineer's%20Documents/Wastewater
%20Engineering/CHARCTERISTIC%20OF%20SEWAGE.pdf
http://www.sciencedirect.com/science/article/pii/S1110570416300649
http://www.merckmanuals.com/en-pr/professional/infectious-diseases/anaerobic-
bacteria/overview-of-anaerobic-bacteria
https://www.healthline.com/health/anaerobic-infections#overview1
http://www.wisegeek.com/what-is-aerobic-bacteria.htm
https://www.watertechonline.com/microorganisms-in-activated-sludge/

Cataylo, Clata, dela Peña, Yurong Page 33


Chapter II: Wastewater Engineering CE 524

Cataylo, Clata, dela Peña, Yurong Page 34

You might also like