Doc. Code - ISHU-LC&P-CON-RPT-0022 PROJECT DASHBOARD 022 - PERIOD M12.1 - FOR INTERNAL USE ONLY Date: 23/05/2020
Project Start Progress of Works (Earned Value) Certified Milestones Value (MCCs) Certified Milestones Value Paid (Drawdowns) Duration Details (Months) Project Completion Project Status
Contract: 10/6/2019 Planned: 26.48 % MCRs cumulative value: 47,877,291.00 $ Issued PNs cumulative value: 128,773,882.19 $ Project Duration: 27 Contract: 9/9/2021
Actual: 19.54 % MCCs cumulative value: 47,877,291.00 $ Sold PNs cumulative value: 113,249,891.61 $ Time Elapsed: 11.5 Delay on Completion: 0 Delay
M2
M2 09/06/21 Substantial Completion
Landscaping 20/5/2021
0.00
672,231.00
1,877,148.00
5,929,202.50
541,783.00
3,425,230.00
0.00
2,133,770.00
0.00
10,435,925.00
6,712,519.00
8,877,389.00
11,030,067.00
7,175,348.50
7,522,981.00
6,393,908.50
3,837,808.00
6,069,537.50
11,381,324.00
32,858,254.50
27,723,831.00
18,514,489.50
6,045,819.00
20,973,873.50
0.00
0.00
16,469,635.00
positions. Procedures are not being followed and rework
11 is often needed. Long Lead of Civil & MEP procurement
has not started yed despite some design packages having
Planned been issued in the last two weeks.
Completed
Milestones Value The Contractor's schedule is extremely compressed with
22 multiple critical or near critical paths, resources
requirements are extremely high. Delayed issue of IFC
drawings may worsen the situation.
0.00
97,461.00
1,046,580.00
953,368.50
5,158,437.00
5,189,748.00
412,335.00
1,721,435.00
487,305.00
463,148.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
procurement. Preventative measures taken by the local
government have considerably slowed down progress.
Milestones Completions Planned for following Period M12.2 Mil.4 4.2.br Block D Superstructures - level B4 200000000 4 U-Boot First batch Delivered
(from 24/05/2020 to 09/06/2020) Mil.5 4.2.b Block A Substructures
175000000
Mil.1 1.10.i Project Management Services - M11 and M12 Mil.6 4.2.x Block B Substructures
Mil.2 1.11.f Works Supervision Services - M11 and M12 Mil.7 4.2.ck Block E Substructures
150000000
Mil.3 2.1.g Completion of Training preparation Mil.8 4.2.df Block F Substructures
Mil.4 4.2.cl Block E Superstructures - level B4 and Substructures - level B3 Mil.9 4.3.j Nurses Hostel A Bulk Earthworks and Substructures 125000000
Mil.5 5.1.d Order Confirmation acknowledged by manufacturer of Clinical Labs Mil.10 4.3.o Nurses Hostel B Bulk Earthworks and Substructures
100000000
Mil.6 5.1.g Order Confirmation acknowledged by manufacturer of Main Surgery Mil.11 4.4.a Recreation and Motel Bulk Earthworks
Order Confirmation acknowledged by manufacturer of Dialysis/Chempotherapy Adults &
Mil.7 5.1.h Peds/Blood Bank & Tranfusion Mil.12 4.2.au Block C Substructures 75000000
19.54%
Order Confirmation acknowledged by manufacturer of Central Sterilization
Mil.8 5.1.o /Accident&Emer/Rehabilitation Mil.13 4.2.bq Block D Substructures 50000000
Order Confirmation acknowledged by manufacturer of Hosiptal Furniture and FF&E
Mil.9 5.1.p (Basement 3) Mil.14 5.1.b Order Confirmation acknowledged by manufacturer of Nuclear Medicine
25000000
43655
43747
43778
43870
43899
43991
44021
44144
44236
44264
44356
44386
44417
43686
43717
43808
43839
43930
43960
44052
44083
44113
44174
44205
44295
44325
44448
Time
Mil.11 5.1.u Specialized Training School Furniture and FF&E
Mil.17 5.1.k Order Confirmation acknowledged by manufacturer of Intervention Radiology 1 Lifts 29/11/2020
Mil.12 7.1.f Monthly Project Progress Report - M11 and M12 Mil.18 5.3.c Approval of Shop Drawings by Engineer for Radiotherapy Department + Cyclotron 2 Transformers 15/01/2021
3 Generators 18/01/2021
Activities Carried out during Period M12.1 Activities Planned for following Period M12.2
5 WS Pumps 27/12/2020
(from 10/05/2020 to 23/05/2020) (from 24/05/2020 to 09/06/2020)
Reinforcement installation and form works for Hospital foundation Block A (rework due to Act.1 Ongoing Compaction, blinding concrete and waterproofing for hospital foundation for blocks F & D 6 Chiller 15/02/2021
Act.1
initial faulty concrete pour)
Concrete pour at block A-01-A, A-02-A, A-02-B, B-01-B, A-01-B and Block C-03, rebar placements at RFI MS SD NCR IR 7 FAHU 15/02/2021
Act.2
Block B and E
Act.2 Reinforcement installation and form works for Hospital foundation Block B and E TOT TOT TOT TOT 2 TOT 8 FCU 24/11/2020
Review/approval of revised Shop Drawings for Nurses hostel, Block C, D & F, method statements &
Act.3 Fabrication of Foundation's reinforcement and starter bars Act.3
risk assessments for other blocks. Prequalifactions of suppliers
276 2 212 14 117 9 Exhaust Fan 24/12/2020
Act.4 Applying water proofing primer and layer for Block D Act.4 Appliances and furniture for the Engineer's site office to be completed NEW NEW NEW NEW NEW 10 CHW Pumps 15/01/2021
Act.5 Pouring of concrete Hospital foundation part of Block A Act.5 Lean concrete at Conference & Exhibition Center and Recreation & Motel 0 0 2 0 212 0 12 0 117 11 FF Pumps 19/12/2020
Act.6 Cleaning of temporary trench for drainage and Construction of additional steel yard Act.6 Reviewing shopdrawings for 2nd Batching Plant, Shop drawings for storm water drainage outlets 12 STP system 13/12/2020
Act.7 Excavation of Nursing hostel 7B Act.7 Procurement of materials for storm water drainage towards ZANA community 13 Medical Equipments 14/01/2021
Act.8 Preparation of tower crane installation on Block B Act.8 Installation of tower crane at Block B and C - Verification of compliance 14 FF&E 08/03/2021
Act.9 Excavation of Doctor's, Nurses and specialized training school buildings 7
13
29
Ov erd ue Pe ndi
n g / A wa ting C losed
Planned
Actual 1190 1133
Actual
331 367 438 486
26 26 44 44 29 29 24 24 34 34 100 37 88 244 168 35 48 21
12 12 12 6 14 0 0 0
48
Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21