8/18/2019 ITP for Cable Tray Installation

  oosan Heavy Industries


Vietnam
Dung Quat Economic Zone,
Binh Thuan, Binh Son, Quang Ngai,
Vietnam
T +84 55 5618 900
F +84 553 618 950

 A 21-May-12   Danny J.Y.Jeong K.J.Lim For Information

Rev. Date Drawn Checked Approved Details of Revision

Owner :

  AES-VCM MONG DUONG


POWER COMPANY LIMITED

Owner's Engineer :

Contractor :

Project : PC : T10206

MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT UAS : QE01

Unit : PO

KKS : ZEN
Title : T10206-QE01-POZEN__-040203 INSPECTION
 AND TEST PLAN FOR Reg. No. 040203
CABLE TRAYS INSTALLATION Revision :  A

Drawing No. : Page-No :


T10206-QE01-P0ZEN-040203 1 of 4

Page 1

http://slidepdf.com/reader/full/itp-for-cable-tray-installation 1/4
8/18/2019 ITP for Cable Tray Installation

Doc. No. T10206-QE01-POZEN-040203 Rev. A

ITP for Cable Tray Installation AES-VCM


Contractor  DOOSAN 2 of 4

This note is only applicable for AES-VCM Mong Duong

Detailed Legend

S : Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong
except for the first or last operation on the basis of each process. AES-VCM Mong Duong
could check the operation, if he is present at the site during the inspection by Doosan.

R  : Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document


attesting to the satisfactory performance of the related test or inspection for review by
- .

W : Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to
decide whether they will attend such inspection or not.

H : Hold Point / Downstream construction and other activities shall not proceed
without attendance or any written approval of AES-VCM Mong Duong.

NOTE : The Site ITP and all of the abovementioned reports will be kept available by
  DOOSAN at anytime for control and or review by AES-VCM Mong Duong.

Page 2

http://slidepdf.com/reader/full/itp-for-cable-tray-installation 2/4
8/18/2019 ITP for Cable Tray Installation

Doc. No.
Inspection & Test Plan for Cable Tray
AES-VCM
Installation
Contractor 

Inspection & Test Activities


Specific Applicable drawing
Item Name Oper. No. Inspection Process number, Standard Code number, Subcontractor DOOSAN  AES-VCM
Specification
 A Sign A Sign A Sign

Check the condition of cable Supports, Racks, Trays


 A1 Packing List R R R
and Trunking while receiving.
 A.Material
Receipt
Check size and type of the Supports, Racks, Trays Material Technical
 A2 R R R
and Trunking with respect to the requisitions. Specification

Check the installation is according to the designed  Approved Cons truction


B1 H W W
layout drawing & specification. Drawing T10206-YD04---

   
B2 H W W
expansion joints if any are specified are in place. Drawing T10206-YD04---

No sharp edges cut to be permitted. Cutting edges of  Approved Cons truction


B3 H W W
trays/trunkings are touch-up painted. Drawing T10206-YD04---

B. Cable Ensure the gap between parallel runs is quite enough  Approved Cons truction
Tray B4 H W W
to accommodate the layer of cables. Drawing T10206-YD04---
Installation
Ensure there are no sharp 90 degrees bends are  Approved Cons truction
B5 H W W
made. Drawing T10206-YD04---

Ensure the cable trays numbered according to cable


 Approved Cons truction
B6 trays route layout on which KKS nos. are indicated and H W W
Drawing T10206-YD04---
explained.

Ensure the cable trays numbered according to


B7 cable trays route layout on which KKS nos. are  Approved Cons truction H W W
Drawing T10206-YD04---
indicated and explained.

 Abb revi atio n : S: Surveillance R: Report Review W: Witness Inspection H: Hold Inspection

Note :  All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications

http://slidepdf.com/reader/full/itp-for-cable-tray-installation 3/4
8/18/2019 ITP for Cable Tray Installation

Inspection Check List


 Project : Cable Tray Installation Works Ref. No.

 Drawing No. : Date :


Specific Location :

CHECK ITEM

Verification & Approval Observed


 No Inspection elements Result
Yes No N/A / Remarks

Check the condition of cable Supports, Racks, Trays and Trunking while
1
receiving.

Check size and type of the Supports, Racks, Trays and Trunking with
2
respect to the requisitions.

Check the installation is according to the designed layout drawing &


3
specification.

Check the leveling & alignment of tray & rack and expansion joints if
4
any are specified are in place.

 No sharp edges cut to be permitted. Cutting edges of trays/trunkings are


5
touch-up painted.

Ensure the gap between parallel runs is quite enough to accommodate the
6
layer of cables.

7 Ensure there are no sharp 90 degrees bends are made.

Ensure the cable trays numbered according to cable trays route


8
layout on which KKS nos. are indicated and explained.

Check whether the exclusive earth continuity between the trays /


9
trunking / racks where the joints are made.

Earth jumper cable with crimp type terminals to be fitted to all cable
10
tray joints.

hecked by : (Subcontractor DOOSAN Electrical Dept. DOOSAN QA/QC Dept. AES-VCM


 Name & Signature Name & Signature Name & Signature Name & Signature
 Position Position Position Position
 Date Date Date Date

page 4