Construction Check Sheet E-008A: Electrical LV Starters, Fuse Switch / Isolators & Feeder
Construction Check Sheet E-008A: Electrical LV Starters, Fuse Switch / Isolators & Feeder
ELECTRICAL
LV STARTERS, FUSE SWITCH /
ISOLATORS & FEEDER
PROJECT
DESCRIPTION
n-BUTYL LITHIUM DILUTION FACILITY PROJECT NO: 44-NC-2900
A. INDENT/CONTRACT No:
LOCATION: SUBSTATION SYSTEM/DUTY:
HAZARDOUS AREA DWG: HAZARDOUS AREA CLASS
SAFE/ZONE:
CERTIFYING AUTHORITY: CERTIFICATE No:
EQUIPMENT/CUBICLE TAG NO: GA DRAWING NO:
WIRING / SCHEMATIC DIAGRAM NO:
INTER-CONNECTION DIAGRAM NO:
DEVICE MAKE & TYPE RATING
SWITCH FUSE UNIT
MCCB / MCB
CONTACTOR
OVERLOAD RELAY
ELCB
CONTROL TRANSFORMER
CONTROL FUSE / MCB
CURRENT TRANSFORMER
AMMETER
B. INSPECTION Results
3. Inspect and ensure that the installation meets the requirements of the hazardous area in which the
cubicle/starter is located
Sheet 1 of 2
CONSTRUCTION CHECK SHEET E-008A
ELECTRICAL
LV STARTERS, FUSE SWITCH /
ISOLATORS & FEEDER
PROJECT
DESCRIPTION
n-BUTYL LITHIUM DILUTION FACILITY PROJECT NO: 44-NC-2900
INSPECTION Results
11. Test operation of Switch Fuse Unit and ensure proper make and break
12. Check close and open operation of MCCBs and MCBs by hand
14. Test and record through contact resistance of SFU / MCCB / MCB auxiliary contacts
16. Check and record contactor and auxiliary relay coil voltages
19. Record through contact resistance of contactor contacts with contacts physically closed ()
C. REMARKS/OBSERVATIONS:
Sheet 2 of 2