DhrUv ConsUltancy Services Pvt. Ltd.

Association with
Qmax Techno ConsUltants Pvt. Ltd.
501, Plot No. 67, Pujit Plaza, Opp. K-Star Hotel, Sector-11, C.B.D. Belapur, Navi Mumbai – 400 614
Telefax No. +91 22 27570710, Mobile:- 09619497305, Website : www.dhruvconsultancy.in
Email ID: services@dhruvconsultancy.in, info@dhruvconsultancy.in, CIN No.U74999MH2003PTC141887

O. No.Dhruv/Kolde-Khetia/AE/

Date: 23/05/2020
To,
The Executive Engineer,
MSRDC Ltd, Camp Office,
Green Building, 4th Floor,
Bhandkan Bhavan Parisar,
Untawadi Road,
Nashik – 422002.

Sub: Consultancy Services for Authority’s Engineer for Supervision of rehabilitation and up-gradation
to 2 lane with paved shoulder / 4 lane standards of National Highway section Kolde village to
Khetia MP border section of NH-752-G length 48.60 km part of NH-6-Wisarwadi-Nandurbar-
Prakasha-Shahada-Khetia (MP Border) NH-752-G in the State of Maharashtra under EPC Mode
(Pacakge-32):- Regarding proposal for COS proposal

Ref: 1) Your telephonic instruction to Team Leader on dated 22.05.2020.


2) Regional Office letter no.RW/MUM/P-1138/2016-17/153 this letter received from you
whatsapp.

Sir,
As per your telephonic instrcuctions and letter received under reference no.01 and 02.
In the above said letter reference no.02 therein mentioned letter no.NH-2020/02/DE-
7/C.R. No. NHW-7/ENGG/2027 dated 30.04.2020 is not received by this office till today. As you have
instructed to comply the remarks you are requested to please provide the same, without having this
letter this office trying to comply the remarks as below.
Sr.No. Observations Comply
1. It is pertaining to mentioned that out As per your office letter no.
of 48.60km length of project 6.07km is MSRDC/NSK/NH/36/2020 on dated 08.01.2020
4-Lane as per scope and remaining is 2- and This office letter no.Dhruv/Kolde-
lane with paved shoulder.The proposed Khetia/2018-19/AE/Four Lane/248 on dated
4-Laning of additional 2.805km is not 06.01.2019 proposal is submitted.
in continuity of 4- lanning as per
scope .The traffic on the stretch is of
tune of9736 PCU as per 2016 traffic
count. The 4-lanining in
piece meal manner will not solve the
501, Plot No. 67, Pujit Plaza, Opp. K-Star Hotel, Sector-11, C.B.D. Belapur, Navi Mumbai – 400 614
Telefax No. +91 22 27570710, Mobile:- 09619497305, Website : www.dhruvconsultancy.in
Email ID: services@dhruvconsultancy.in, info@dhruvconsultancy.in, CIN No.U74999MH2003PTC141887

purpose and create safety issues. It


shall be examined whether 4-lanning
is required in full length.Why 4-
lanning of full stretch may be
considered instead of 4-lanning in
piece meal manner.
2. Whether, land is available for Land is available .
construction of 4-lanning in proposed
2.805km
3. Is there any additional requirement of May be required.
utility shifting
4. The completion of work revised Ok will be followed.
schedule on 31.05.2020 shall not be
stopped due to proposed 4-lanning.it
may be taken up in DLP period if
required.
Submitted for your information and necessary action please.

(Team Leader)
Dhruv Consultancy Services Pvt. Ltd.
Cc: 1. Copy submitted to Project cordinator, kolde-khetia, Dhruv Consultancy Service Pvt Ltd,
Mumbai, for your information please.