China Petroleum Engineering Co.

Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 31 of 61
GE-0001

WB (SC-2) thin fireproof coating for steel structure for outdoor use
(Former name: SC-2 thin fireproof coating for steel structure for outdoor use)

Example: Tianjin Meijiang Exhibition Center

PROFILE
The brand new WB (SC-2) thin fireproof coating for steel structure for outdoor use is applicable to outdoor structures
like petroleum, chemical and oil (gas) tank support. This product plays a role of ornament and protection at ordinary times,
and the coat expands and gets thicker to form fireproof and insulation barrier during fire to prevent the heat from
transmitting to the steel substrate quickly. This product is tested by our test center and national test center for fireproof
building materials according to GB14907-002 Fireproof Coating for Steel Structure, and its physical & chemical properties
and fire resistance meet the prescribed requirements or are even better. It has been widely applied in the key fireproofing
engineering like Wuhan International Exhibition Center, Huai’an Exhibition Center, National Conference Center, Liaoning
Jinxi Oil Refining Works, Sinopec Scientific Research Office Building, Xiamen Exhibition Center.
MAIN PERFORMANCE
This product is tested by our test center and national test center for fireproof building materials according to GB14907-2002
Fireproof Coating for Steel Structure, and its physical & chemical properties and fireproof performance meet the prescribed
requirements or are even better than the indexes below:
TECHNICAL PARAMETERS
Item Technical index
State in the container Even and thick fluid after stirring
Drying time (surface drying) ≤12h
Initial dry crack resistance 1-3 cracks allowable, width≤0.5mm
Appearance and color Grey white
Bonding strength ≥0.15Mpa
Water resistance ≥24h, the coat does not wrinkle, form bubble or shed.
Hot & cold circulation resistance ≥15 times, the coat does not wrinkle, form bubble or shed.
Fire resistance Coat thickness, mm 5.5 Fire resistance rating, h 1.0
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 32 of 61
GE-0001

WB (SC-2) thin fireproof coating for steel structure for outdoor use

Example: Liaoning Jinxi Oil Refining Works

PAINTING
A. Antirust actions shall be taken on the surface of the steel structure, or dirt and dust shall be removed from the surface
coated with antirust paint.
B. The temperature is preferred to fall between 5 and 38℃, the relative humidity shall not be higher than 90% with good
ventilation.
C. It is preferred to use gravity (or jet) spray gun. The thickness of each layer shall not exceed 2.5mm (refer to painting
instructions for detail).

KEY POINTS
Painting is not allowed when the temperature is too low, the humidity is too high, the wind speed is higher than 5m/s
(class 4), or there is dew formed on the surface of the steel structure. This product shall be stored at a cool, dry and
ventilated place at 5-35℃ and the validity period of storage is six months.

RECOMMENDED USE
Fire resistance time (h) Thickness of dry film of coat (mm) Theoretic consumption (kg/m2)
1.5 3.1 3.03
2.0 3.4 3.32
2.5 3.9 3.81
3.0 4.8 4.69
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 33 of 61
GE-0001

Lanling Group Painting Instructions

SC-2 Expansive Fireproof Coating for Steel


Structure

Painting
Instructions

Jiangsu Lanling Polymer Material Co., Ltd.

Add: Hengshan Bridge Town, East Suburb, Changzhou, Jiangsu

Tel: 0519-88601616

Fax: 0519-88604887
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 34 of 61
GE-0001

Lanling Group Painting Instructions


1. General
1.1 This manual covers the fire protection engineering for load bearing steel structure in industrial and civil
buildings. Stir SC-2 expansive fireproof coating for steel structure to be uniform, then apply it on the steel
structure by brush painting, roller painting, spray painting or combination of above modes to form fireproof
protective layer, thus the fire resistance rating of the steel structure is increased.
1.2 The thickness of fireproof coat of SC-2 expansive fireproof coating for steel structure (thickness of dry
film) shall comply with the design requirement for fire resistance rating.
1.3 The painting engineering is preferred to be started after all the steel structures are installed.
1.4 Rust, dust, oil stain on the surface of steel structure shall be removed, and antirust primer shall be
painted.
1.5 Fill in the seams at the connections of the components for steel structure, if any, with the fireproof
coating or other fireproof materials (for example, aluminum silicate fiber), then start the overall painting.
1.6 Protective measures shall be adopted for the part without need of fire protection, like piping, wall, door,
window, equipment, etc to prevent them from being polluted. The coating applied on the same accidentally
shall be removed immediately.
1.7 The temperature is preferred to fall between 5 and 38℃, the relative humidity shall not be higher than 90%
with good ventilation. Painting is not allowed when the temperature is too low, the humidity is too high or
the wind speed is higher than 5m/s (class 4).
1.8 The surface temperature of the steel structure shall be 3℃ higher than the dew point.
1.9 The coat with design thickness will express its integrated performance after being maintained for 15
days.
2. Painting process
2.1 Surface treatment
2.1.1 Exposed steel structure
Rust, dust, oil stain on the surface of steel structure shall be removed, and the treatment and cleanness
grade shall comply with the standard applicable to the selected primer.
2.1.2 Steel structure painted with antirust primer
Dust, oil stain and other impurities on the surface of antirust paint shall be removed. The relatively
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 35 of 61
GE-0001

smooth part of the primer shall be roughened to have certain roughness and increase the adhesion between
the fireproof coat and the primer.
Treatments for Different Painting Intervals Between Antirust Primer and Fireproof Coating

Condition Treatment

Painting interval ≤1 month Directly paint the fireproof coating

Painting interval >1 month Roughen the surface gently with abrasive paper,
then paint the fireproof coating
2.2 Painting
2.2.1 Painting of antirust primer
The painting shall comply with the regulations related to the selected antirust primer.
2.2.2 Painting of fireproof coating
2.2.2.1 Preparations: The coating already prepared before delivery, whether topcoat or primer, shall be
stirred to be uniform. Generally, portable electrical stirrer is used on the site. The consistency after
preparation and stirring shall be proper, with the proper consistency, the coating will not flow, bounce or be
absorbed. Dilute with proper amount of tap water if it is too thick.
2.2.2.2 Operation
① It is preferred to use gravity (jet) spray gun (with air compressor of automatic pressure regulation
0.6~0.9m3/min, nozzle diameter 4-6mm, air pressure 0.4~0.6Mpa) to paint this coating. For partial repair or
painting in small area where conditions for spray painting are not satisfied, you can paint manually with
tools like plastering knife. The topcoat can be painted by brush painting, roller painting, spray painting or
combination of above modes. The spray gun used to paint the primer can also be used to paint the topcoat
when the nozzle is adjustable within the range of 1-3mm.
② The thickness of each layer shall not exceed 2.0mm, when it is sunny, paint by spraying every 8-24
hours. You can start to paint next layer only when the previous layer is basically dried.
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 36 of 61
GE-0001

③Topcoat can be painted upon request of ornament, but it is compulsory for outdoor use. Generally, the
topcoat is painted by spraying once or twice, make sure the color at the split joint is uniform and the primer
is completely covered. The topcoat shall be smooth rather than rough. The theoretic consumption of the
topcoat is 0.3kg/m2.
④ The thicknesses of the coats are identified according to the requirements on fire resistance time of the
coated steel structure.
Fire resistance time VS Theoretic consumption
Theoretic
Item Thickness of dry film Actual consumption
consumption
Time (mm) (㎏/㎡)
(㎏/㎡)
As appropriate, the consumption varies
1.5h 3.1 2.95
with actual thickness of film, painting
2.0h 3.3 3.15 loss, painting mode, shape and size of
component, ambient environment,
2.5h 3.8 3.60 coating distribution and otherwise,
generally, it is 1.2-1.5 times larger than
3.0h 4.9 4.60 the theoretic consumption.

2.2.2.3 Deposit may occur for the specific weights of different ingredients in the coating vary, make sure to
stir all the coating and deposits in the barrel to be uniform before painting.
2.2.2.4 If the steel structure is exposed outdoor, measures shall be adopted to prevent the steel structure from
being exposed in the rain during painting.

~ THE END ~
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 37 of 61
GE-0001
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 38 of 61
GE-0001

TEST REPORT
No. Gn201303927

Subject: Jiangsu Lanling Polymer Material Co., Ltd.

Product name: Thin fireproof coating for steel structure for outdoor use

Test type: By commission

Test Center of Tianjin Fire Research Institute of MPS


China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 39 of 61
GE-0001

Test Report

Test Center of Tianjin Fire Research Institute of MPS

No. Gn201303927
Product name Thin fireproof coating for steel structure for outdoor use
Specification and model WB (SC-2)
Applicant Jiangsu Lanling Polymer Material Co., Ltd.
Producer Jiangsu Lanling Polymer Material Co., Ltd.
Sender Jiangsu Lanling Polymer Material Co., Ltd.
Sample No. 201303927
Sampler Blank
Sampling base Blank
Sampling place Blank
Sampling date Blank
Sample quantity 100kg
Arrival date 2013-05-14
Test type By commission
Test class Blank
Test date 2013-05-14 ~ 2013-09-10
Test place Quality Inspection Center
Test basis Test outline
Test item Fire resistance
The WB (SC-2) thin fireproof coating for steel structure for outdoor use is

tested in accordance with Test Outline under the commission of Jiangsu

Lanling Polymer Material Co., Ltd. and the results are listed in the summary.

Conclusion (The following is left blank intentionally)

(Seal special for test)


Issued on: September 12, 2013
Seal special for test, Test Center of Tianjin Fire Research Institute of MPS
(Seal)
Remarks This column is left in blank intentionally.

Approved by: (Signature) Reviewed by: (Signature) Prepared by: (Signature) 1 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 40 of 61
GE-0001

Summary of Test Results No. Gn201303927


No. Test item Test basis Test result Remarks
Actual coat thickness: 4.6mm, span of steel
beam: 5400mm. When the fire resistance test Coat thickness
Fire lasts for 120min, the max flexivity of the steel includes the
1 Test Outline
resistance beam is 119mm and the beam does not loose thickness of
carrying capacity. antirust paint
Fire resistance rating higher than 2.0h.
The following is left
blank intentionally

2 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 41 of 61
GE-0001

Photo page No. Gn201303927

3 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 42 of 61
GE-0001

201303927
Fire Resistance Test Outline of WB (SC-2) Thin Fireproof Coating for Steel Structure for Outdoor Use
(According to Hydrocarbon Time vs. Temperature Rise Curve)

Jiangsu Lanling Polymer Material Co., Ltd. entrusts China National Center for Quality Supervision and Test of Fixed
Fire-Fighting Systems and Fire-resisting Building Components to test the fire resistance of WB (SC-2) thin fireproof
coating for steel structure for outdoor use produced by this company.
1. Target: Test the fire resistance of WB (SC-2) thin fireproof coating for steel structure for outdoor use produced by
this company (according to hydrocarbon time vs. temperature rise), and the fire resistance rating shall be equal to
or higher than 2.0h.
2. Test equipment: As specified in Section 6.5.1 of GB14907-2002.
3. Size and production of specimen: Define the size of the specimen for fire resistance test and produce the same,
steel beam 6m×36B I-shaped steel, thickness of fireproof coat: 4mm.
4. Installation and loading of specimen: Subject to Section 6.5.5 of GB14907-2002.
5. Test condition:
The temperature rise curve and requirement for fire resistance test shall be subject to HC temperature rise curve of
tunnel fire resistance test in Section 5.1.2 of GA/T714-2007, the test lasts for 2h;
6. Assessment: The fire resistance of the fireproof coating for steel structure is assessed according to Section 6.5.6 in
GB14907-2002.

Jiangsu Lanling Polymer Material Co., Ltd.


May 12, 2013
Jiangsu Lanling Polymer Material Co., Ltd. (seal)

4 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 43 of 61
GE-0001

Description of sample No. Gn201303927

Photo of sample:

5 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 44 of 61
GE-0001

TEST REPORT

No. 2011-2388

Subject: Jiangsu Lanling Polymer Material Co., Ltd.

Product name: Thin fireproof coating for steel structure for outdoor use

Test type: Type test

China National Center for Quality Supervision and Test of Fixed Fire-Fighting Systems and
Fire-resisting Building Components
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 45 of 61
GE-0001

Test Report
China National Center for Quality Supervision and Test of Fixed Fire-Fighting Systems and
Fire-resisting Building Components
No. 2011-2388
Product name Thin fireproof coating for steel structure for outdoor use
Specification and model WB (SC-2)
Brand Lanling
Applicant Conformity assessment center of fire-fighting products of MPS
Producer Jiangsu Lanling Polymer Material Co., Ltd.
Subject Jiangsu Lanling Polymer Material Co., Ltd.
Sampler Plant condition inspection team
Sampling place Production workshop
Sampling base 400kg
Sampling date 2011-03-12
Sample sent by Liu Yeqing
Sending date 2011-04-11
Sample quantity 200kg
Sample No. 2011-2388
Test type Type test
Test basis GB14907-2002
Test class Blank
Test item All
Test date 2011-04-20 ~ 2011-11-03
Test place In this center
The WB (SC-2) thin fireproof coating for steel structure for outdoor use
(thickness of coat: 4.8mm, fire resistance test duration: 3.0h, fire resistance
acceptable) sent by Jiangsu Lanling Polymer Material Co., Ltd. is tested in
accordance with GB14907-2002 Fireproof Coating for Steel Structure and is
determined as acceptable.
Conclusion (The following is left blank intentionally)
(Seal special for test)
Issued on: November 7, 2011
Seal special for test, China National Center for Quality Supervision and Test
of Fixed Fire-Fighting Systems and Fire-resisting Building Components
(Seal)
Fire resistance test: Put the I36b steel beam protected by 4.8mm thick WB
Remarks (SC-2) coating on the test furnace, distribute the load 128kN uniformly, and
do the test according to GB14907-2002.

Approved by: (Signature) Reviewed by: (Signature) Prepared by: (Signature) 1 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 46 of 61
GE-0001

Summary of Test Results No. 2011-2388


No. Test item Standard req. and section number Test result Conclusion Remarks
State in the Even liquid or thick fluid after Even liquid after stirring,
1 Acceptable
container stirring, without caking (5.2.2) without caking
Drying time
2 ≤12h (5.2.2) 4h Acceptable
(surface drying)
No obvious difference with
Appearance and No obvious difference with
3 sample after the coat is dried Acceptable
color sample
(5.2.2)
Initial dry crack 1-3 cracks allowable, width≤
4 No crack Acceptable
resistance 0.5mm (5.2.2)
Bonding
5 ≥0.15MPa (5.2.2) 1.10MPa Acceptable
strength
720h, the coat does not
≥720h, the coat does not
wrinkle, shed, form hollow
Heat exposure wrinkle, shed, form hollow or
6 or crack. Meet the additional Acceptable
resistance crack. Additional requirements
requirements for fire
for fire resistance. (5.2.2)
resistance.
≥504h, the coat does not wrinkle 504h, the coat does not
Damp heat or shed. Additional requirements wrinkle or shed. Meet the
7 Acceptable
resistance for fire resistance shall be additional requirements for
satisfied. (5.2.2) fire resistance.
≥15 times, the coat does not 15 times, the coat does not
Hot & cold crack, shed or form bubble. crack, shed or form bubble.
8 circulation Additional requirements for fire Meet the additional Acceptable
resistance resistance shall be satisfied. requirements for fire
(5.2.2) resistance.
≥360h, the coat does not 360h, the coat does not
wrinkle, shed or crack. Additional wrinkle, shed or crack. Meet
9 Acid resistance Acceptable
requirements for fire resistance the additional requirements
shall be satisfied. (5.2.2) for fire resistance.
≥360h, the coat does not 360h, the coat does not
Alkali wrinkle, shed or crack. Additional wrinkle, shed or crack. Meet
10 Acceptable
resistance requirements for fire resistance the additional requirements
shall be satisfied. (5.2.2) for fire resistance.

2 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 47 of 61
GE-0001

Summary of Test Results No. 2011-2388


No. Test item Standard req. and section number Test result Conclusion Remarks
≥30 times, the coat does not 30 times, the coat does not
form bubble, and has no obvious form bubble, and has no
Salt mist deterioration or softening. obvious deterioration or
11 Acceptable
resistance Additional requirements for fire softening. Meet the
resistance shall be satisfied. additional requirements for
(5.2.2) fire resistance.
When the coat thickness is Actual coat thickness:
5.0mm ± 0.5mm, the fire 4.8mm, span of steel beam: Coat
resistance rating shall ≥ 1.0h. 5400mm. When the fire thickness
(5.2.2) resistance test lasts for includes
Determination of fire resistance 180min, max flexivity of the
12 Fire resistance Acceptable
rating: steel beam is 16mm and the thickness
Lose load bearing capacity - beam does not loose carry of
Max flexivity of the steel beam capacity. antirust
reaches L0/20 (L0 is span of steel Fire resistance rating higher paint
beam, mm). (6.5.6) than 3.0h.
(The following is left blank
intentionally)

3 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 48 of 61
GE-0001

Photo page No. 2011-2388

4 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 49 of 61
GE-0001

Description of sample No. 2011-2388

Photo of sample:

Description of product (sample):


I. Nameplate: Product name: Thin fireproof coating for steel structure for outdoor use
Model and specification: WB (SC-2)
Standard: GB14907-2002
Manufacture: Jiangsu Lanling Polymer Material Co., Ltd.
Facility: Jiangsu Lanling Polymer Material Co., Ltd.
Date of delivery: 2011.3
Identification of fire-fighting product: Not any
II. Key raw materials
1. Styrene-acrylic emulsion: Jiangyan Dongfang Special Chemical Works
2. Ammonium Polyphosphate: Jiangsu Rongtai Chemical Co., Ltd.
3. Melamine: Henan Zhongyuan Dahua Group Co., Ltd.
4. Pentaerythritol: Hubei Yihua Limited
III. Properties and parameters
1. Appearance and color: White fluid.
2. State in the container: Thick fluid after stirring.
(The following is left blank intentionally)

5 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 50 of 61
GE-0001

WCB (SF) Ultra-thin fireproof coating for steel structure for outdoor use

Example: Beijing Benz Automobile

PAINTING
A. Antirust paint shall be applied on the surface of the steel structure, or dirt and dust shall be removed from the surface
coated with antirust paint.
B. Stir completely to be uniform before painting, add proper amount of diluter (not larger than 5%) to facilitate the
painting if the coating is too thick.
C. The fireproof coating shall be painted by layer. The thickness of the dry film of the first layer shall not exceed 200μm,
and the thickness of the dry film of the subsequent layers shall not exceed 300μm. The interval of each layer shall be 24
hours (23±2℃) (refer to painting instructions for detail).
D. Preferred ambient environment: temperature 0-35℃, relative humidity≤85%.
E. The thickness of the dry film of the topcoat for steel structure is about 40μm, and generally two layers of the topcoat are
required for the steel structure for outdoor use.

KEY POINTS
This product belongs to solvent-type coating and ordinary dangerous product, it shall be transported according to
regulations related to ordinary dangerous products. This product shall be stored in the room at 5-35℃, the validity period
for storage is six months, but the product can also be used beyond the period where the test reveals that it meets related
requirements.

RECOMMENDED USE
Fire resistance time (h) Thickness of dry film (mm) Theoretic consumption (kg/m2)
1.0 0.99 1.66
1.5 1.64 2.75
2.0 2.11 3.6
1.5 (Aromatic
2.33 3.97
hydrocarbon)
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 51 of 61
GE-0001

SF Ultra-thin Fireproof Coating for Steel


Structure for Outdoor Use

Painting
Instructions

Jiangsu Lanling Painting Engineering Co., Ltd.

Add: Hengshan Bridge Town, East Suburb, Changzhou, Jiangsu

Tel: 0519-88601616
Fax: 0519-88604887
E-mail: Lanlingpai@163.com
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 52 of 61
GE-0001

Lanling Group Painting Instructions


1. General
1.1 This manual covers the fire protection engineering for load bearing steel structure in industrial and civil
buildings. Stir SF ultra-thin expansive fireproof coating for steel structure to be uniform, then apply it on the
steel structure by brush painting, roller painting, spray painting or combination of above modes to form
fireproof protective layer, thus the fire resistance rating of the steel structure is increased.
1.2 The thickness of fireproof coat of the SF fireproof coating for steel structure (thickness of dry film) shall
comply with the design requirement for fire resistance rating.
1.3 The painting engineering is preferred to be started after all the steel structures are installed.
1.4 Rust, dust, oil stain on the surface of steel structure shall be removed, and antirust primer (antirust epoxy
paint) shall be painted.
1.5 Fill in the seams at the connections of the components for the steel structure, if any, with the fireproof
coating or other fireproof materials (for example aluminum silicate fiber), and then start the overall painting.
1.6 Protective measures shall be adopted for the part without need of fire protection, like piping, wall, door,
window, equipment, etc to prevent them from being polluted. The coating applied on the same accidentally
shall be removed immediately.
1.7 The temperature is preferred to fall between 0 and 35℃, the relative humidity shall not be higher than 85%
with good ventilation. No open flame is allowed.
1.8 The surface temperature of the steel structure shall be 3℃ higher than the dew point.
1.9 The coating will express optimal performance after maintenance period if used together with primer,
main material and topcoat.
2. Painting process
2.1 Surface treatment
2.1.1 Exposed steel structure
Rust, dust, oil stain on the surface of the steel structure shall be removed, and the treatment and cleanness
grade shall comply with the standard applicable to the selected primer.
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 53 of 61
GE-0001

Lanling Group Painting Instructions

2.1.2 Steel structure painted with antirust primer


Dust, oil stain and other impurities on the surface of the antirust paint shall be removed. The relatively
smooth part of the primer shall be roughened to have certain roughness and increase the adhesion between
the fireproof coating layer and the primer.
Matching program for the antirust primer and the fireproof coating is as follows:
Type of
Condition Treatment
primer
Painting interval ≤1
Directly paint the fireproof coating
month
Epoxy Roughen the surface gently with abrasive paper or take antirust
Painting interval >1
epoxy micaceous iron paint as intermediate, then paint the
month
fireproof coating

Matched Directly paint the fireproof coating

Non-epoxy Take antirust epoxy micaceous iron paint as intermediate, then


Unmatched
paint the fireproof coating
2.2 Painting
2.2.1 Painting of antirust primer
The painting shall comply with the regulations related to the selected antirust primer.
2.2.2 Painting of fireproof coating
2.2.2.1 Painting mode: brush painting, roller painting, spray painting or combination of above modes.
2.2.2.2 The fireproof coating shall be painted by layer. The thickness of the first layer shall not exceed
200μm (thickness of dry film), wet film 330μm. The thickness of the dry film of the subsequent layers shall
not exceed 300μm, and wet film 480μm. The painting interval of each layer shall be 24 hours (23±2℃).
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 54 of 61
GE-0001

Lanling Group Painting Instructions


Sheet 1 Temperature VS Painting Interval

Painting interval (h) 24 8~12 4~8

Temperature (℃) ≤20 25~30 30~35

Sheet 2 Fire resistance period VS Theoretic consumption


Thickness of Theoretic
Item Actual consumption
dry film consumption
Period (㎏/㎡)
(mm) (㎏/㎡)
Actual consumption varies with steel
1.5h outdoor 1.64 2.75
structure and painting conditions, for
2.0h outdoor 2.11 3.66 brush painting, loss coefficient:
1.2-1.5, for high-pressure airless
Hydrocarbon spray painting, loss coefficient: 2.2,
2.33 3.97
1.5h outdoor diluter 20%

2.2.2.3 If viscosity is too high and painting is affected, diluter less than 5% of the total amount can be added;
for high-pressure airless spray painting, the diluter shall be lower than 15% of the total amount.
2.2.2.4 If the steel structure is exposed outdoor, measures shall be adopted to prevent the steel structure from
being exposed in the rain during painting.
2.2.3 Painting of topcoat
After main fireproof material reaches the required thickness, polish the rough position on the coat to ensure
its ornament, and then start painting the topcoat. The painting interval between the protective topcoat and the
fireproof coating layer is 24 hours (23±2℃) and can be adjusted in accordance with ambient environment
(temperature and humidity) and drying status of main material. The painting parameters of the topcoat are as
follows:
Ambient Thickness of dry
Painting mode Painting layer(s)
environment film (μm)
Brush painting, roller
Outdoor 2 80~100
painting, spray painting
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 55 of 61
GE-0001

CERTIFICATE FOR CHINA COMPULSORY PRODUCT CERTIFICATION


S/N: 2015081809000602
Applicant: Jiangsu Lanling Polymer Material Co., Ltd.
Add: Wuyi Village, Hengshan Bridge Town, Wujin District, Changzhou, Jiangsu
Manufacturer: Jiangsu Lanling Polymer Material Co., Ltd. (H002793)
Add: Wuyi Village, Hengshan Bridge Town, Wujin District, Changzhou, Jiangsu
Facility: Jiangsu Lanling Polymer Material Co., Ltd.
Add: Wuyi Village, Hengshan Bridge Town, Wujin District, Changzhou, Jiangsu
Product name: Ultra-thin fireproof coating for steel structure for outdoor use
Certification unit: WCB (SF)
Including: WCB (SF) (coat thickness: 2.11mm, fire resistance test duration: 120min) (main type)
Implementation rules for certification: CNCA-C18-02:2014
Detailed implementation rules for certification: CCCF-HZFH-01
Basic mode of certification: Conformity check of quality assurance capacity of enterprise and product + type
test + sampling test or check in the application after acquiring the certificate
Product standard: GB 14907-2002
This certificate is hereby issued to certify that the aforesaid product meets the requirements in
Implementation Rules for Compulsory Product Certification CNCA-C18-02:2014 and Detailed
Implementation Rules for Compulsory Product Certification CCCF-HZFH-01.
Date of first issue: 2015-07-07
Reissue (renewal) date: 2015-07-07 Expiry date: 2020-07-06

The validity of this certificate is subject to periodic surveillance


Visit the website of Certification and Accreditation Administration of the People’s Republic of China
www.cnca.gov.cn and the website of China Fireproof Product Information Platform www.cccf.com.cn to get
the information about this certificate.
Issued by (affix the seal here)
Conformity Assessment Center for Firefighting Products of MPS (seal)

Conformity Assessment Center for Firefighting Products of MPS


108, A, Xi Ge Xin Lane, Yongwai Sub-district, Dongcheng District, Beijing, China 100077
http://www.cccf.net.cn
A 0020104
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 56 of 61
GE-0001

TEST REPORT

No. 2011-2389

Subject: Jiangsu Lanling Polymer Material Co., Ltd.

Product name: Ultra-thin fireproof coating for steel structure for outdoor use

Test type: Type test

China National Center for Quality Supervision and Test of Fixed Fire-Fighting Systems and
Fire-resisting Building Components
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 57 of 61
GE-0001

Test Report
China National Center for Quality Supervision and Test of Fixed Fire-Fighting Systems and
Fire-resisting Building Components
No. 2011-2389
Product name Ultra-thin fireproof coating for steel structure for outdoor use
Specification and model WCB (SF)
Brand Lanling
Applicant Conformity assessment center of firefighting products of MPS
Producer Jiangsu Lanling Polymer Material Co., Ltd.
Subject Jiangsu Lanling Polymer Material Co., Ltd.
Sampler Plant condition inspection team
Sampling place Production workshop
Sampling base 400kg
Sampling date 2011-03-12
Sample sent by Liu Yeqing
Sending date 2011-04-11
Sample quantity 100kg
Type No. 2011-2389
Test type Type test
Test basis GB14907-2002
Test class Blank
Test item All
Test date 2011-04-20 ~ 2011-11-03
Test place In this center
The WCB (SF) ultra-thin fireproof coating for steel structure for outdoor use
(thickness of coat: 2.11mm, fire resistance test duration: 2.0h, fire resistance
acceptable) sent by Jiangsu Lanling Polymer Material Co., Ltd. is tested in
accordance with GB14907-2002 Fireproof Coating for Steel Structure and is
determined as acceptable.
Conclusion (The following is left blank intentionally)
(Seal special for test)
Issued on: November 7, 2011
Seal special for test, China National Center for Quality Supervision and Test
of Fixed Fire-Fighting Systems and Fire-resisting Building Components
(Seal)
Fire resistance test: Put the I36b steel beam protected by 2.11mm thick WCB
Remarks (SF) coating on the test furnace, distribute the load 128kN uniformly, and do
the test according to GB14907-2002.

Approved by: (Signature) Reviewed by: (Signature) Prepared by: (Signature) 1 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 58 of 61
GE-0001

Summary of Test Results No. 2011-2389


No. Test item Standard req. and section number Test result Conclusion Remarks
State in the Even after stirring, without Even after stirring, without
1 Acceptable
container caking (5.2.2) caking
Drying time
2 ≤8h (5.2.2) 2h Acceptable
(surface drying)
No obvious difference with
Appearance and No obvious difference with
3 sample after the coat is dried Acceptable
color sample
(5.2.2)
Initial dry crack
4 No crack allowable (5.2.2) No crack Acceptable
resistance
Bonding
5 ≥0.20MPa (5.2.2) 1.20MPa Acceptable
strength
720h, the coat does not
≥720h, the coat does not
wrinkle, shed, form hollow
Heat exposure wrinkle, shed, form hollow or
6 or crack. Meet the additional Acceptable
resistance crack. Additional requirements
requirements for fire
for fire resistance. (5.2.2)
resistance.
≥504h, the coat does not wrinkle 504h, the coat does not
Damp heat or shed. Additional requirements wrinkle or shed. Meet the
7 Acceptable
resistance for fire resistance shall be additional requirements for
satisfied. (5.2.2) fire resistance.
≥15 times, the coat does not 15 times, the coat does not
Hot & cold crack, form bubble or shed. crack, form bubble or shed.
8 circulation Additional requirements for fire Meet the additional Acceptable
resistance resistance shall be satisfied. requirements for fire
(5.2.2) resistance.
≥360h, the coat does not 360h, the coat does not
wrinkle, shed or crack. Additional wrinkle, shed or crack. Meet
9 Acid resistance Acceptable
requirements for fire resistance the additional requirements
shall be satisfied. (5.2.2) for fire resistance.
≥360h, the coat does not 360h, the coat does not
Alkali wrinkle, shed or crack. Additional wrinkle, shed or crack. Meet
10 Acceptable
resistance requirements for fire resistance the additional requirements
shall be satisfied. (5.2.2) for fire resistance.

2 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 59 of 61
GE-0001

Summary of Test Results No. 2011-2389


No. Test item Standard req. and section number Technical index Conclusion Remarks
≥30 times, the coat does not 30 times, the coat does not
form bubble, and has no obvious form bubble, and has no
Salt mist deterioration or softening. obvious deterioration or
11 Acceptable
resistance Additional requirements for fire softening. Meet the
resistance shall be satisfied. additional requirements for
(5.2.2) fire resistance.
When the coat thickness is Actual coat thickness:
2.00mm ± 0.20mm, the fire 2.11mm, span of steel beam: Coat
resistance rating shall ≥ 1.0h. 5400mm. When the fire thickness
(5.2.2) resistance test lasts for includes
Determination of fire resistance 120min, max flexivity of the
12 Fire resistance Acceptable
rating: steel beam is 16mm and the thickness
Lose load bearing capacity - beam does not loose carry of
Max flexivity of the steel beam capacity. antirust
reaches L0/20 (L0 is span of steel Fire resistance rating higher paint
beam, mm). (6.5.6) than 2.0h.
(The following is left blank
intentionally)

3 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 60 of 61
GE-0001

Photo page No. 2011-2389

4 of 5 pages
China Petroleum Engineering Co. Ltd

Naimat LPG Upgrade Project

Document No. Rev. Document Title Stage Page


NLU-023-JTL-H99-
1Z Fire proofing Procedure DD 61 of 61
GE-0001

Description of sample No. 2011-2389

Photo of sample:

Description of product (sample):


I. Nameplate: Product name: Ultra-thin fireproof coating for steel structure for outdoor use
Model and specification: WCB (SF)
Standard: GB14907-2002
Manufacture: Jiangsu Lanling Polymer Material Co., Ltd.
Facility: Jiangsu Lanling Polymer Material Co., Ltd.
Date of delivery: 2011.3
Identification of fire-fighting product: Not any
II. Key raw materials
1. SF specific resin: Zhejiang Fenghua Longyu Chemical New Material Works
2. Ammonium Polyphosphate: Jiangsu Rongtai Chemical Co., Ltd.
3. Melamine: Henan Zhongyuan Dahua Group Co., Ltd.
4. Pentaerythritol: Hubei Yihua Limited
III. Properties and parameters
1. Appearance and color: White fluid.
2. State in the container: Even fluid after stirring.
(The following is left blank intentionally)

5 of 5 pages