Professional Documents
Culture Documents
Section B 2. Now Do This Exercise Based On The Tape
Section B 2. Now Do This Exercise Based On The Tape
2.1 Would we be right in saying that a conductor pipe connects a borehole to a floating rig,
whereas a riser connects a borehole to a fixed rig? If not, why not?
It is wrong. Because conductor pipe connects a borehole to a fixed rig and riser pipe
connects a borehole to a floating rig.
2.2 Would we be right in saying that the wellhead and BOP stack are connected to the top of
the riser?
No, you would be wrong, the wellhead and BOP stack are connected to the top of the
borehole, in other words, the riser goes on top of the wellhead and BOP stack.
2.3 What´s the basic difference between drilling a well onshore and drilling on offshore?
The basic difference is the way to connect to the rig.
2.4 Choose the right expression: Put Mr. Washington through means
Connect his call to my phone
2.5 What is the BBC preparing? What is not Keith sure about?
The BBC is preparing a broadcast.
He is not sure about some information on a offshore drilling.
Section C
3. Structure Practice
1. Passive voice