Inspection and Test Plan - Mechanical Works (Qcitp) : Document Review
Inspection and Test Plan - Mechanical Works (Qcitp) : Document Review
1 DOCUMENT REVIEW
Review technical submittal related to General Specification for Mechanical Mateial and Manufacturer Materials Inspection
1.1 R R R R H
Condensate pipes & fittings System. Technical submittal Report
2 MATERIAL RECEIVING
Equipement/Material Receiving
inspection for HVAC equipement, duct ASRAE Standard 90.1, Materials Inspection
and accessories, hanger/supports, Design dwg., Manufacturer Instruction Material Submittal Report with Approve
2.2 Insullation, air terminal devices, and General Specification for Approval and Relevant Materials R R R R H
Flexible Connection, volume/fire Mechanical System. applicable Industrial Documents/Certificate/Su
dampers, Electrical Instrument Codes and standard bmittal
materials.
Storage, handling & Preservation General Specification for Mechanical Mechanical Consultancy Approve Material Storage
2.3 Above material/Equipement for HVAC System and Manufacturer Instruction/Recommendat area and Handling R R R S H
System Recommendation. ion Methodology
3 INSTALLATION
Duct Material conforming to General Specification Notes, Mechanical Consultancy Material Inspection
3.5 R R S S
specification ANSI/SMACNA 006-2006 material approval Report
Check accessories and duct free from General Specifications Notes for
4.2 As per FCD Inspection Report I/H R S S
damage Mechanical works
5 Testing
SUT1-Z05-Q 00-4-023-
1.2 Receipt inspection of welding consumables
Site Receiving Inspection
Procedure
SUT1-Z05-Q00-4-005 WPS(AWS
2.1 Confirmed Welding Procedure Specification
D1.1 Prequalified)
SUT1-Z05-Q00-4-005 WPS(AWS
2.1 Confirmed Welding Procedure Specification
D1.1 Prequalified)
SUT1-Z05-Q00-4-030 Welder &
Welding
Operator qualificationProcedure
2.2 Cofirmed Welders(Welders Qualification Test & Contro)
SUT1-Z05-Q00-4-021 General
Welding Procedure
3 Foundation Preparation
Approved Construction
3.1 Confirmation acceptance of foundation
Drawing - (IFC)
Approved Construction
3.2 Control foundation level pad elevation & location Drawing - (IFC)
5.3 Confirm handrails, gratings, & stairways are correctly installed SUTO-ALL-C08-4-004
6 Bolting
6.1 Confirm all nuts, bolts & washers have been fitted. SUTO-ALL-C08-4-004
SUT1-Z05-Q00-4-006 -WPS & PQR
Non Destructive Testing (NDT) of welding works
7.3 Procedure
8 Grouting
9 Final Inspection
9.1 Carry out Final inspection of the structure Approved Construction Drawings
SUT1-Z05-Q00-4-005 WPS(AWS
10.2 Marking & Cutting
D1.1 Prequalified)
11 NDE
RT or UT - Full penetration Butt Welds 50 % and Magnetic(MT) or Dye
penetrant testing (PT) 50% (for site welds the above will be 100%)
11.1 UT or M/ PT - Partial penetration Butt Welds Min.25% & MT/PT 25% (for SUTO-ALL-C08-4-004
site welds the above will be 50%)
MT or PT - Fillet Welds Min 20% (for site welds the above will be 50%)
LEGEND: ITL: Independent Testing Laboratory I: Execution of Inspection and Test R: Review S: Surveillance
11.0 Attachments
Subcon CONTR.
I R
ITR-QCI-016- Steel Structure I R
Fabrication
Signed “Release Form” from Concrete casting subcontractor/contractor QGI-002 Release Note I R
Approved Construction Drawing – Issued for Construction (IFC)AWS ITR-QCI-0011- Structural Steel
I W
D1.1/ D1.1M Checklist- para. 2 & 4)
Approved Construction Drawing – Issued for Construction (IFC)AWS ITR-QCI-0011 Structural Steel
I W
D1.1/ D1.1M Checklist- para. 2 & 4)
ITR-QCI-0018 Installation
Approved Construction Drawing – Issued for Construction (IFC) I W/R
Record For Structural Steel
ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S
Steel Checklist(para. 5)
ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S
Steel Checklist(para. 5)
ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S/W
Steel Checklist(para. 3)
ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S/R
Steel Checklist(para. 3)
ITR-QCI-0019 Welding
Approved Construction Drawing – Issued for Construction (IFC) I W/R
Inspection Record
ITR-QCI-025- Final inspection
Approved Construction Drawing – Issued for Construction (IFC) I W
for Structure Steel
Approved Construction Drawing – Issued for Construction (IFC) & Mill
ITR-QMI-001- Receiving
Certificates & Factory Production Control Certificates (FPC), No I W/R
Inspection Report
physical defects, Safeguards against adverse environment
Approved Construction Drawing – Issued for Construction (IFC), ITR-QCI-016- Steel Structure
I W
Approved tolerance – ASCI specification for Structural Steel Buildings Fabrication
ification (Request) for Inspection
Release Note
W/R S
S S
R R
R R
W R
R R
W/R R
R S
S S
W/R S
S S
S S
S S
S/R S
W/R R
S/R S
W/R S
W/R S/R
S S
R S
R W
W/R S
S S
S S
S S
W/R S
W/R S
S/R S/R
W/R S