DUCTILITY TEST(After TFOT)

(As per IS: 1208)

Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORK SERVICES AT AF STATION JAMNAGAR GUJARAT
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC Buildcon Pvt Ltd
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source:…………….. Date of Sampling: ...……….....
Make/Brand ……………. Date of Testing: ………..……

_____________________________________________________________________________
Room Temperature : .……ºC

Period of Cooling at Room Temperature : …..…min (30min- 40min)

Period of Cooling in Water Bath (before Trimming) : ……..min (Minimum 30 min)

Period of Cooling in Water Bath (After Trimming) : ……..min (85 min - 95 min)

Actual Test Temperature : 27ºC

Rate of Pull : ……..mm/min

OBSERVATION TABLE

SL. Description Test Mould No. Average Permissible Limit


NO. Value (cm)
Obtained
1 2 3 (cm)

1 Ductility
(in cm)

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SOFTENING POINT TEST


(As per IS: 1205)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Client : Military Engineer Services

Type of Sample: PMB-40…………….… Test No…01.……


Location/Source: SITE LAB…………….. Date of Sampling: ..09.04.2018
Make/Brand …MARUTI BITUMEN.…………. Date of Testing: 09.04.2018

OBSERVATION TABLE

Sample Description Temperature at which the Average Value of Permissible Limit


No. ball touches the bottom Softening Point of Softening
plate (ºC) (ºC)
(ºC)
MIN-75
1 Ball No.-1 83.2 83.6

2 Ball No.- 2 84.1

Remarks: ……………………………………………………………………………………………………..

Rep of Maruti Bitumen J.E.(Civ) ENGR-IN-CHARGE

SOFTENING POINT TEST


(TFOT Test on Residue As per IS: 15462-2004)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Make/Brand ……………. Date of Testing: ………..………

OBSERVATION TABLE

Sample Description Temperature at which the Average Value of Permissible Limit


No. ball touches the bottom Softening Point of Softening
plate (ºC) (ºC)
(ºC)

1 Ball No.-1

2 Ball No.- 2

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civil) ENGR-IN-CHARGE

FLASH & FIRE POINT TEST


(As per IS: 1209)

Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STATION JAMNAGAR
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : M/S. KCC BUILDCON PVT LTD
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Make/Brand ……………. Date of Testing: ………..……

OBSERVATION TABLE

Description Trial -1 Trial-2 Average Value Permissible Limit


(º C) (º C)

FLASH POINT
(º C)

FIRE POINT
(º C)

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


PENETRATION TEST FOR BITUMEN/PMB
(As per IS: 1203)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Client : Military Engineer Services

Type of Sample: PMB-40……………… Test No…01.……


Location/Source: SITE LAB…………….. Date of Sampling:09.04.2018 .
Make/Brand -MARUTI BITUMEN……………. Date of Testing: 09.04.2018

OBSERVATION TABLE

Penetration (1/10mm) Permissible


Trial No. Limits

Specimen I Specimen II

46 30-50
1.

2. 43

44
3.

44.3
Average Penetration

Remarks: …………………………………………………………………………………………………….

Rep. of Maruti Bitumen J.E.(Civ) ENGR-IN-CHARGE

GE(P)AF CHAKERI

PENETRATION TEST FOR BITUMEN/PMB


(TFOT Test on Residue As per IS: 15462-2004)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Make/Brand ……………. Date of Testing: ………..……

OBSERVATION TABLE

Penetration (1/10mm) Permissible


Trial No. Limits

Specimen I Specimen II

1.

2.

3.

Reduction
Average Penetration र
35% MAX.
AT 25 oC

Remarks: …………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

DETERMINATION OF SOFTENING POINT FOR BITUMEN/PMB


(As per IS: 1205)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source…………….. Date of Sampling: ...……….....
Make/Brand ……………. Date of Testing: ………..……

OBSERVATION SHEET

Description Temperature at which Ball-I Temperature at which Ball- Min. Permissible


touches the bottom plate II touches the bottom plate Limit
(oC) (oC) (oC)

Softening point, oC

Average

Remarks: …………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

DETERMINATION OF SOFTENING POINT FOR BITUMEN/PMB


(As per IS: 1205)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Make/Brand ……………. Date of Testing: ………..……
OBSERVATION TABLE
Description Temperature at which Ball-I Temperature at which Ball- Min. Permissible
touches the bottom plate II touches the bottom plate Limit
(oC) (oC) (oC)

Softening point, oC

Average

Elapsed Ball I Ball II


time, Temperature, Temperature,
o o
minutes C C

Remarks: …………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

DETERMINATION OF SPECIFIC GRAVITY OF BITUMEN/PMB


(As per IS: 1202)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Make/Brand ……………. Date of Testing: ………..……
OBSERVATION TABLE

S.
No.
Description Specimen-I Specimen-II
1. Mass of Specific gravity Bottle (a),gm

2. Mass of specific gravity with Water (b),gm

3. Mass of Specific gravity bottle about half


filled with Bitumen (c),gm

4. Mass of specific gravity bottle about half


filled with the material and rest with water
(d),gm

5. Specific gravity of Bitumen= (c-a)/(b-a)-(d-c)

6. Average Specific Gravity

Remarks: …………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

DETERMINATION OF GLASS FIBER IN GLASS GRID

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Make/Brand ……………. Date of Testing: ………..……
OBSERVATION TABLE

S.
No.
Description Specimen-I Specimen-II

1. Mass of glass grid of 1 sqf piece (a),g


2. Mass of glass grid of quarter of 1 sqf piece
(b),g

Test : Piece of glass grid is put to flame till all organic content burnt.

Result : White shiney colour glass fiber observed.

Remarks: …………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

Re-surfacing / Strengthening of Runway at AF Station Chakeri, Kanpur


Re-surfacing / Strengthening of Runway at AF Station Chakeri, Kanpur
ELASTIC RECOVERY TEST FOR PMB
(As per IS : 15462-2004)

Type of Sample: PMB-40 Test No: 1


Location/Source: SITE LAB Date of Sampling: 09.04.2018
Make/Brand: MARUTI BITUMEN Date of Testing: 09.04.2018

OBSERVATION TABLE

Specimen Length of Thread (cm) Difference % Average Min.


No. Recovery % Recovery Permissible
Limit
(%)

Before Cut After Cut


10 1.0 9.0 90
I

10 0.1 9.1 91 85% Min.


90.66 at 15 oC
II
10 0.1 9.1 91
III

Remarks: …………………………………………………………………………………………

Rep. of Maruti J.E.(Civ) Engr-in-charge

ELASTIC RECOVERY TEST FOR PMB


(TFOT Test on Residue As per IS : 15462-2004)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Make/Brand ……………. Date of Testing: ………..……
OBSERVATION TABLE

Specimen Length of Thread (cm) Difference Recovery Average Min.


No. (cm) % Recovery Permissible
Limit
% (%)

Before Cut After Cut

II 50% MIN.
AT 25 oC

III

Remarks: …………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SEPARATION TEST FOR PMB


(As per IS:15462)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Make/Brand ……………. Date of Testing: ………..……

OBSERVATION TABLE

Description Temp. in oC, Ball-I Temp. in oC, Ball-II Max. Permissible


(Top of the tube) (Bottom of the tube) Limit
(oC)
Softening point, oC

Difference/ Separation, oC
3 ºC MAX

Remarks: …………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SEPARATION TEST FOR PMB


(As per IRC: SP: 23)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Date of Testing: ………..……

OBSERVATION SHEET

Description Temp. in oC, Ball-I Temp. in oC, Ball-II Max.


(Top of the tube) (Bottom of the tube) Permissible
Limit
(oC)

Softening point, oC

Difference/ Separation, oC
Elapsed time, Ball I Ball II
(minutes) Temperature, Temperature,
o o
C C

Remarks: …………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

BINDER CONTENT & GRADATION AFTER EXTRACTION OF BITUMINOUS MIX

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI , KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Date of Testing: ………..……

Binder Content:

1. Weight of bowl M1 (g) 7. Wt. of Fine material ,Recovered


from the extract (W3) (g)
2. Initial weight of filter paper (m1) 8. Wt. of Filter Paper after
(g) extraction m2 (g)

3 Weight of bowl + Mix sample 9. Increase in Wt. of filter paper


M2 (g) After extract. W4 = m2-m1 (g)

4. Weight of Mix sample W1 10. Bitumen Content (%) =


= M2-M1 (g) W1-(W2+W3+W4)/W1*100

5. Weight of bowl + Aggregate 11. Permissible limit (%)


After extraction M3 (g)
6. Weight of Agg. After extraction
W2 = M3-M1 (g)

Sieve Analysis: Wt. of sample: ………….

Sieve Size Wt. Retained Cumulative Wt. Percentage Percentage Permissible Limits
(mm) (gm) Retained (gm) Retaining (%) Passing (%)
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

BITUMEN EXTRACTION TEST


Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Date of Testing: ………..……

OBSERVATION
SL
No. Description Unit Observation

1 Weight of Empty Mould ( M1 ) g

2 Weight of Mould + Sample (M2) g

3 Weight of Sample (W1) = M2-M1 g

4 Initial Weight of Filter Paper ( m1) g

5 Weight of Mould + Dry Sample ( M3) g

6 Weight of Sample After Extraction (W2) = M3-M1 g

7 Final Weight of Filter Paper after Extraction ( m2) g

8 Increase in Weight of Filter Paper ( W3)=m2-m1 g

9 Bitumen % = W1-(W2+W3)/W1x100 %

11 Average of Bitumen %

12 Permissible limit %
Remarks: ……………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


DETERMINATION OF LOSS IN MASS FOR BITUMEN/PMB
(As per IS: 1212)

Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORK SERVICES AT AF STATION JAMNAGAR
GUJARAT
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC Buildcon Pvt Ltd
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source:……………….. Date of Sampling: ...……….....
Maintain Temp/Specified Temp.……..… /(163±5 oC) Date of Testing: ………..……
S. No. Description Unit Trial 1 Trial 2 LIMIT
%
1 Mass of Empty Container (W1) g

2 Mass of Sample + Container (W2) g

3 Wt. of Sample W= W2-W1 g

4 Wt. of Sample + Container after 5 hours (W3) g

5 Percentage Loss on Heating %


(W2 – W3)/W *100
6 Average Percentage Loss in Mass %
1.0% MAX.

OBSERVATION TABLE

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


Curing Compound Spraying Test
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Source /Location:…………….. Layer No………………..
Date of Testing: ………..……

OBSERVATION TABLE

S.No. DESCRIPTION UNIT TRIAL-1 TRIAL-2

1 Initial weight of Plate W1 Kg

2 Area of Plate A m2

3 Weight of Plate after spread of Kg


curing compound W2
4 Weight of Spreaded curing Kg
compound W3 =W2-W1
5 Rate of Spray W3/A Kg/m2

6 Average of Spray Kg/m2

7 Permissible Limit Kg/m2 0.200 Kg/m²

Remarks: …………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

Prime / Tack Coat Test


Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Client : Military Engineer Services
Type of Sample: …PMB-40…………… Test No…01.
Source /Location: TRAILBAY AT ATC TOWER Date of Sampling: 09.05.18
Date of Testing: …09.05.18

OBSERVATION TABLE

S.No. DESCRIPTION UNIT TRIAL-1 TRIAL-2

1 Initial weight of Plate W1 Kg 2.390 2.819

2 Area of Plate A m2 0.305 0.305

3 Weight of Plate after Prime / Tack Kg 2.819 3.251


coat W2
4 Weight of Prime / Tack coat Kg 0.429 0.432
W3=W2-W1

5 Prime / Tack coat W3/A Kg/m2 1.407 1.416

6 Average of Prime / Tack coat Kg/m2 1.4115

7 Permissible Limit Kg/m2 1.40

Remarks: …SAMPLE PASSED

Rep.OF MARUTI BITUMEN J.E.(Civ) ENGR-IN-CHARGE

MAXIMUM THEORETICAL SPECIFIC GRAVITY OF MIX


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: . Test No….


Location/Source: . Date of Sampling: .
Tested by……… Date of Testing: .

OBSERVATION TABLE

S.NO. Description Unit Trial

1 Weight of empty flask with cover w1 g


2 Weight of cover plate and flask filled g
with water D
3 Weight of flask with dry sample w2 g
4 Weight of dry sample in air g
A =w2-w1
5 Weight of flask ,cover plate, g
sample and water E
6 Maximum theoretical specific gravity of -
mix Gmm =A/[A+D-E]

Remarks: ………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GE(P)AF CHAKERI CWE AF CHAKERI JP SINGH JAHEER ABBAS


Wg. Cdr. LT. COL.
J D. RRMT Dir(SO1)
E in C’s Br

MAXIMUM THEORETICAL SPECIFIC GRAVITY OF MIX


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Source /Location:…………….. Date of Sampling: ...……….....
Date of Testing: ………..……

OBSERVATION TABLE

S.NO. Description Unit Trial

1 Weight of empty flask with cover w1 g

2 Weight of cover plate and flask filled with water D g

3 Weight of flask with dry sample w2 g

4 Weight of dry sample in air g


A =w2-w1
5 Weight of flask ,cover plate, sample and water E g

6 Maximum theoretical specific gravity of mix Gmm -


=A/[A+D-E]
Remarks: …………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

AGGREGATE STRIPPING VALUE TEST


(As per IS: 6241)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services
Type of Sample: …………….… Test No….……
Location/Source: …………….. Date of Sampling: ...………....
Date of Testing: ………..……

OBSERVATION TABLE

S.
No. Test No. 1 2 Permissible
Limit

1 Weight of Aggregate Passing 20 mm IS Sieve and


Retained on 12.5 mm IS Sieve (gm)

2 Weight of Bitumen (5%) of weight of Aggregate


(gm)

3 Stripping Value ( After Immersing the mix in water


and keeping in water bath at 40 ºC for 24 hour) (%)

4 Retained CoatingValue (%)

5 Average of Retained Coating Value (%) 95% MIN.

Remarks: ……………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

Test of Clay Lumps


(As per IS: 2386 Part-II)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Source /Location:…………….. Date of Sampling: ...……….....
Date of Testing: ………..……

Size of Particles making Weight of Sample Size of sieve for sieving


Up the Samples(mm) Min. Residue of Clay Lumps

F.Agg. retaind on 1.18 mm 100 g Min. 850 micron


Over 4.75 mm to 10mm 1000g 2.36mm
,, 10mm to 20mm 2000g 4.75mm
,, 20mm to 40mm 3000g 4.75mm
,, 40mm 5000g 4.75mm

OBSERVATION TABLE

S.No. DESCRIPTION UNIT DETAIL

1 Weight of sample Material W1 g

2 Weight of Retained Material W2 g

3 Clay Lumps L= (W1-W2/W1)*100 %

Permissible Limit : 1%Max. (For


& RCC As per IS:383)
. 4%Max.(For DLC As per CA)

Remarks: …………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

Deleterious Content Test


(As per IS: 2386 Part-II)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Source /Location:…………….. Date of Sampling: ...……….....
Date of Testing: ………..……
OBSERVATION TABLE

S.No. DESCRIPTION UNIT DETAIL

1 Weight of sample Material W1 Kg

Weight of dried sample Material after wash


with 75 micron IS Sieve W2
2 Weight of deleterious Material W3 = W2 –W1 Kg

3 Deleterious MaterialValue (W3/W1)*100 %

4 Permissible Limit % 5% Max. for C. Agg.


& F. Agg.

Remarks: …………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

Deleterious Value Test


(As per IS: 2386 Part-II)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Source /Location:…………….. Date of Sampling: ...……….....
Date of Testing: ………..……

OBSERVATION TABLE
S.No. DESCRIPTION UNIT DETAIL

1 Weight of sample Material W1 g

2 Weight of dried sample Material after wash g


with 75 micron IS Sieve W2

3 Weight of deleterious Material W3 = W1 –W2 g

4 Deleterious Material Value = (W3/W1)*100 %

5 Permissible Limit %

Remarks: …………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

BULK DENSITY OF AGGREGATE


(As per IS: 2386 Part-III)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source:……………….. Date of Sampling: ...……….....
S. No. Details Unit Trial 1 Trial 2 Average
Bulk Density
(Kg/l)
1 Wt. of Empty density measure(W1) Kg
2 Wt. of material + density measure (W2) Kg

3 Wt. of material W= W2-W1 Kg

4 Volume of density measure (V) lit

5 Bulk density W/ V Kg / lit

Date of Testing: ………..……


OBSERVATION TABLE

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

MOISTURE CONTENT
(As per IS: 2720 Part-II)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source:……………….. Date of Sampling: ...……….....
Date of Testing: ………..……
S.
No. Description Unit Trial 1 Trial 2 Average
1 Mass of Empty container with lid (W1)
g
2 Mass of container with lid + Sample material (W2)
g
3 Mass of container with lid + Dry Sample material
(W3) g
4 Weight of water (W2-W3)
g
5 Weight of Sample material (W3-W1)
g
6 Natural Moisture Content =
(W2-W3)/ (W3-W1)*100 %

OBSERVATION TABLE

Remarks: ………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

FLAKINESS INDEX AND ELONGATION INDEX


(As per IS: 2386 Part-I)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample……………… Test No……………….


Location/Source: …………….. Date of Sampling:…………….
Date of Testing: ………..……
OBSERVATION TABLE
SIZE OF SIEVE WEIGHT OF WEIGHT OF WEIGHT OF WEIGHT OF
SL. FRACTION AGG. IN AGG. IN EACH AGG.IN
NO. PASSING RETAINED CONSISTING EACH FRACTION EACH
THROUGH ON SIEVE OF ATLEAST FRACTION RETAINED ON FRACTION
SIEVE (mm) (mm) 200 RETAINED PASSING THICKNESS RETAINED
PIECES THICKNESS GAUGE ON LENGTH
(gm) GAUGE (gm) GAUGE
(gm) (gm)
A B C D E F
1 63 50
2 50 40
3 40 31.5
4 31.5 25
5 25 20
6 20 16

7 16 12.5
8 12.5 10
9 10 6.3

TOTAL

(A) FLAKINESS INDEX (F.I ) = Total wt.of flaky material x 100 = ……………...….%
Total wt. Sample

(B) ELONGATION INDEX (E.I) = Total wt.of Elongation material x 100 = …..………...…. %
Total wt.ofnon flaky material

(C) COMBINED F.I & E.I = (A) + (B) =………………...…%

PERMISSIBLE LIMIT = ……….. %…( Flakiness)&………..% (Combined)

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SIEVE ANALYSIS FOR 40MM AGGREGATE


(As per IS: 383)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of sampling……………
Wt. of sample……………….. Date of Testing: ………..……
OBSERVATION TABLE

S.No. Sieve Wt.retained Cumulative Percentage Percentage Permissible


Size(mm) (gm) wt.retained Cumulative wt. passing Limits
(gm) wt.retained (%) (%)
(%)

1 63 100

2 40 85-100

3 20 0-20

4 10 0-5
Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SIEVE ANALYSIS FOR 20MM AGGREGATE


(As per IS: 383)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of sampling……………
Wt. of sample……………….. Date of Testing: ………..……
OBSERVATION TABLE

S.No. Sieve Wt.retained Cumulative Percentage Percentage Permissible


Size(mm) (gm) wt.retained Cumulative wt. passing Limits
(gm) wt.retained (%) (%)
(%)

1 40 100

2 20 85-100

3 10 0-20

4 4.75 0-5

Remarks: ……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SIEVE ANALYSIS FOR 12.5MM AGGREGATE


(AS per IS 383 Table No. IV)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: ……………. Date of Sampling: ...……….....
Weight of Sample…………….. Date of Testing: ………..……

OBSERVATION TABLE

Sieve Size Wt. Retained Cumulative Wt. % of % Passing Permissible


(mm) (gm) Retained (gm) Cumulative Limits
Wt. Retained

16 100

12.5 85-100

10 0-45

4.75 0-10

Remarks: ……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SIEVE ANALYSIS FOR 10MM AGGREGATE


(As per IS: 383)

Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STATION JAMNAGAR
GUJARAT
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC BUILDCON PVT LTD
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Wt. of sample……………. Date of Testing: ………..……

OBSERVATION TABLE

Sr.N Sieve Wt.retained Cumulative Percentage Percentage Permissible


o. Size(mm) (gm) wt.retained Cumulative wt. passing Limits
(gm) wt.retained (%) (%)
(%)

1 12.5 100

2 10 85-100

3 4.75 0-20

4 2.36 0-5

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


SIEVE ANALYSIS FOR 26.5 MM AGGREGATE
(As per IS: 383)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No………..


Location/Source: …………….. Date of Sampling: ...……….....
Wt. of sample……………. Date of Testing: ………..……

OBSERVATION TABLE

Sr. Wt. Cumulative Percentage Percentage Permissible


No. retained (gm) wt. retained Cumulative wt. passing Limits
(gm) wt. retained (%) (%)
(%)

1 31.5 100

2 26.5 85-100

3 20 0-30

4 10 0-5

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


SIEVE ANALYSIS OF SAND
(As per IS: 383)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: ……………. Date of Sampling: ...………......
Weight of Sample……………… Date of Testing: ………..……

OBSERVATION TABLE

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (Zone –II)
(%)
1. 10 100

2. 4.75 90-100

3. 2.36 75-100

4. 1.18 55-90

5. 0.600 35-59

6. 0.300 8-30

7. 0.150 0-10

Remarks: ………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SIEVE ANALYSIS OF STONE DUST


(As per IS: 383)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: ……………. Date of Sampling: ...………......
Weight of Sample……………… Date of Testing: ………..……

OBSERVATION TABLE

Sieve Wt. Cumulative Percentage Percentage Permissible Limits (%)


size Retained Wt. Retained Retained Passing
(mm) (gm) (gm) (%) (%)
Zone –II Zone –III Zone –IV

10 100 100 100

4.75 90-100 90-100 95-100

2.36 75-100 85-100 95-100

1.18 55-90 75-100 90-100

0.600 35-59 60-79 80-79

0.300 8-30 12-40 15-50

0.150 0-20 0-20 0-20

Remarks: ………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SILT CONTENT OF FINE SAND (GANGA SAND)


(As per IS: 2386 Part-II)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services
Type of Sample: …………….… Test No….……
Location/Source: ……………. Date of Sampling: ...………......
vehicle no ………..…… Date of testing………..
Qty. :-………………………..
OBSERVATION TABLE

Sr. Initial reading Volume of settled sample % age of Silt - Max. limit
No. After 3hrs (L2/L1) X 100 (%)

Total volume of Volume of silt Volume of sand


sand & silt in ml in ml(L2) in ml(L1)

1 100

2 100

3 Average of Silt Content % MAX.

Remarks: ……………………………………………………………………………………………………..

Lab. Tech. Lab Incharge Contractor’s Rep.

SAND EQUIVALENT VALUE


(As per IS: 2720 Part XXXVII)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Date of Testing: ………..……

OBSERVATION TABLE
Description Trial 1 Trial 2

Sand reading, A

Clay reading, B

Sand Equivalent Value (A/B) x 100

Average Sand Equivalent Value

Permissible Limit

Remarks: …………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GRADATION WITHOUT PULVERISATION


(As per MORTH Table 400-4)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Weight of Sample……………. Date of Testing: ………..……
OBSERVATION TABLE

Sieve Size Wt. Cumulative Percentage Percentage Permissible


(mm) Retained Wt. Retained Retained Passing Limits
(gm) (gm) (%) (%)

53.0 100
37.5 95-100

19.0 45-100

9.50 35-100

4.75 25-100

0.600 8-65

0.300 5-40

0.075 0-10

Remarks: ……………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

COMBINED GRADATION OF AGG. FOR WET MIX MACADAM


(As per MORTH Table 400-11)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Weight of Sample…………….. Date of Testing: ………..……
OBSERVATION TABLE
Sieve Size Wt. Retained (g) Cumulative Wt. Percentage Percentage Permissible
(mm) Retained (g) Retained Passing Limits as per
(%) (%) CA

53 100

45 95-100

22.4 60-80

11.2 40-60
4.75 25-40

2.36 15-30

0.6 8-22
.
0.075 0-8

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SIEVE ANALYSIS OF MOORUM


(As per SSR-2009 Part I Cl.20.A.15B.4A )

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of sampling……………….
Wt. of Sample………………. Date of Testing……………….

OBSERVATION TABLE
Sieve Size Wt. Retained Cumulative Wt. Percentage Percentage Permissible
(mm) (gm) Retained (gm) Retained Passing Limits
(%) (%)

53.0 100

37.5 95-100

19.0 45-100

9.5 35-100

4.75 25-100

0.600 08-65
0.300 05-40

0.075 0-10

GRAVEL=………………% SAND=………………..% SILT=…………………%

Remarks: ………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

WATER ABSORPTION OF COARSE & FINE AGGREGATE


(As per IS: 2386 Part-III)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………… Test No….……


Location/Source: …………… Date of Sampling:………..
Date of Testing: ………….
…… MM AGGREGATE

Sl. No. SSD wt of Sample (A) Oven Dry wt of Sample Water Absorption Average Permissible
(B) (A-B)/B x100 Limits

1 Max. %
2

……MM AGGREGATE

Sl. No. SSD wt of Sample (A) Oven Dry wt of Sample Water Absorption Average Permissible
(B) (A-B)/B x100 Limits

1 Max. %
2

……MM AGGREGATE

Sl. No. SSD wt of Sample (A) Oven Dry wt of Sample Water Absorption Average Permissible
(B) (A-B)/B x100 Limits

1 Max. %
2
STONE DUST

Sl. No. SSD wt of Sample (A) Oven Dry wt of Sample Water Absorption Average Permissible
(B) (A-B)/B x100 Limits

1 Max. %
2

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

MOISTURE CONTENT OF COARSE& FINE AGGREGATE


(As per IS: 2720 Part-II)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …DLC Test No….……


Location/Source: ……………. Date of Sampling: ...………...
Date of Testing: ………..……
20.00 MM AGGREGATE

Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits

1 Max. %
2

10.00MM AGGREGATE

Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits

1 Max. %
2

6.00MM AGGREGATE

Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits

1 Max. %
2

SAND

Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits
1 Max. %
2

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

COMBINED GRADATION OF AGG. FOR DBM (Grade 1st)


(As per IRC : 111-2009)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Weight of Sample………………g Date of Testing: ………..……

OBSERVATION TABLE

Sl. Sieve size Wt. Retained Cumulative Percentage Percentage Permissible


No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%) (%) (%)

1 45 100

2 37.5 95-100

3 26.5 63-93

4 13.2 55-75

5 4.75 38-54

6 2.36 28-42

7 0.300 7-21

8 0.075 2-8

Remarks: ……………………………………………………………………………………
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

COMBINED GRADATION OF AGG. FOR DBM (Grade 2nd)


(As per IRC : 111-2009)
Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORK SERVICES AT AF STATION JAMNAGAR GUJARAT
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC Buildcon Pvt Ltd
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Weight of Sample………………g Date of Testing: ………..……
OBSERVATION TABLE

Sl. Sieve size Wt. Retained Cumulative Percentage Percentage Permissible


No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%) (%) (%)

1 37.5 100

2 26.5 90-100

3 19.0 71-95

4 13.2 56-80

5 4.75 38-54

6 2.36 28-42

7 0.300 7-21

8 0.075 2-8

Remarks: ……………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

COMBINED AGGREGATE GRADING FOR DAC(Grade 1st )


(As per IRC : 111-2009)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services
Type of Sample: …. Test No…
Location/Source: … Date of Sampling:
Weight of Sample…………….g Date of Testing :
OBSERVATION TABLE

Sieve Wt. Cumulative Percentage Percentage Permissible Limits


Size Retained Wt. Retained Retained Passing (%)
(mm) (gm) (gm) (%) (%)

26.5
100
19.0
90 - 100
13.2
59 - 79

9.5
52 - 72
4.75
35 - 55
2.36
28 - 44
1.18
20 - 34
0.600
15 - 27
0.300
10 - 20
0.150
5 - 13
0.075
2-8

Remarks: …………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

COMBINED AGGREGATE GRADING FOR DAC(Grade IInd)


(As per IRC : 111-2009)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Client : Military Engineer Services

Type of Sample:………. Test No:


Location/Source: ……… Date of Sampling: …………..
Weight of Sample……………g Date of Testing : …………..
OBSERVATION TABLE

Sieve Wt. Cumulative Percentage Percentage Permissible Limits


Size Retained Wt. Retained Retained Passing (%)
(mm) (gm) (gm) (%) (%)
19 100

13.2 90 - 100

9.5 70 - 88

4.75 53 - 71

2.36 42 - 58

1.18 34 - 48

0.600 26 - 38

0.300 18 - 28

0.150 12 - 20

0.075 4 -10

Remarks: …………………………………………………………………………………

Maruti Bitumen J.E.(Civ) ENGR-IN-CHARGE

COMBINED AGGREGATE GRADING FOR BM (Grade 2nd)


(As per MORT&H Table 500-7)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Weight of Sample………………g Date of Testing: ………..……
OBSERVATION TABLE

Sl. Sieve size Wt. Retained Cumulative Percentage Percentage Permissible


No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%) (%) (%)

1 26.5 100

2 19.0 90-100

3 13.2 56-88

4 4.75 16-36

5 2.36 4-19

6 0.300 2-10

7 0.075 0-8

Remarks: ……………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

COMBINED AGGREGATE GRADING FOR SDAC (Grade 2nd)


(As per IRC : 111-2009)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample:………. Test No:


Location/Source: ……… Date of Sampling: …………..
Weight of Sample……………g Date of Testing : …………..

OBSERVATION TABLE

Sieve Wt. Retained Cumulative Percentage Percentage Permissible Limits


Size (gm) Wt. Retained Retained Passing (%)
(mm) (gm) (%) (%)
13.2 100

9.5 90 - 100

4.75 35 - 51

2.36 24 - 39

1.18 15 - 30

0.300 9 - 19

0.075 3-8

Remarks: …………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

AGGREGATE IMPACT VALUE TEST


(As per IS: 2386 Part-IV)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Date of Testing: ………..……
OBSERVATION TABLE

S.
No. Test No. 1 2 Permissible
Limit
(%)
1 Mass of Aggregate(Oven Dry) Passing 12.5 mm IS Sieve
and Retained on 10 mm IS Sieve (Wa) (gm)

2 Mass of Fraction Retained on 2.36 mm IS Sieve(Wb)


(gm)

3 Mass of Fraction Passing 2.36 mm IS Sieve (Wc) (gm)

4 Aggregate Impact Value = Wc/Wa x 100 %

5 Average Aggregate Impact Value (%)


. …...% MAX

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GE(P) AF Chakeri CWE Chakeri CE Nagpur E-IN-C

LOS ANGELES ABRASION TEST


(As per IS: 2386 Part IV)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type /Grade of Sample: ……………… Test No….……


Location/Source: …………….. Weight of charges…………….
No .of charges……………. Date of Sampling: ...……….....
No. of Revolutions -……… 500 /1000 Date of Testing: ………..……

OBSERVATION TABLE

Description Trial 1 Trial 2

Weight of Sample, W1 gm

Wt. of fraction retained 1.70mm IS Sieve (W2) gm

Weight of fraction passing 1.70 mm I.S. Sieve,


W3= W1-W2

Los Angeles Abrasion Value, W3/W1 x 100 %

Average Los Angeles Abrasion Value %

LIMITS:

Specified WMM DLC M-25 PQC DBM DAC


Limit
% 35 35 35 35 30

Remarks: ……………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

DETERMINATION OF TEN PERCENT FINES VALUE


(As per BS 812 Part III)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Date of Testing: ………..……
Estimated Force required to produce 10% fines =

OBSERVATION TABLE

Sample No. Force Applied in KN Total wt. of dry Material passing % Fines
(X) Sample 2.36 mm sieve
Average % fines (Y)

Force equivalent to produce 10% fines = 14x =


Y+4

10 % fines value = …………KN

Permissible Limit = ………..KN

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

(As per IS: 2386 Part-IV)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Date of Testing: ………..……
OBSERVATION TABLE
S. No. Particulars Sample No.1 Sample No. 2

1 12.50mm Passing 10.00mm Retained dry wt. of sample


(W1) gm

2 Wt. Of Aggregate retained 2.36 mm IS Sieve


(W2) gm

3 Wt. of Aggregate Passing 2.36 mm IS Sieve after test


(W3) = (W1-W2) gm
4 Crushing Value = (W3/W1)x100 ( %)

5 Average Crushing Value (%)

PERMISSIBLE LIMIT -………….% Maximum

Remarks: ………………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SPECIFIC GRAVITY&WATER ABSORPTION OF FINE AGGREGATES


(As per IS 2386 Part-III)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Date of Testing: ………..……
OBSERVATION TABLE
S. No. Details Unit Trial 1 Trial 2 Average

1 Wt. of saturated surface dry fine gm


Aggregate in air (A)

2 Wt. of Pycnometer filled with water + gm


material (B)

3 Wt. of Pycnometer filled with water gm


only (C)

4 Wt. of oven dried Fine Aggregate in gm


air (D)

5 Specific Gravity = D/[A-(B-C)]

6 Apparent Specific Gravity =


D/[D-(B-C)]

6 Water Absorption = (A-D/D)x100 %

Remarks: ………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SPECIFIC GRAVITY&WATER ABSORPTION OF COARSE AGGREGATES


(As per IS 2386 Part-III)

Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STATION JAMNAGAR
GUJARAT
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC BUILDCON PVT LTD
Client : Military Engineer Services
Type of Sample: …………….… Test No………..
Location/Source: …………….. Date of Sampling: ...………....
Date of Testing: ………..……
OBSERVATION TABLE
S. No. Details Unit Trial 1 Trial 2 Average

1 Sample in water(W1) gm

2 Wt. of saturated surface dry sample(W2) gm

3 Wt. of oven dried sample(W3) gm

4 Specific Gravity on SSD Bias


W2 / W2- W1
5 Specific Gravity on Oven Dry Bias
W3 / W2- W1
6 Apparent specific gravity
W3 / W3- W1
7 Water Absorption %
(W2- W3 / W3 )*100

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

COMPACTION FACTOR TEST OF PQC


(As per IS: 1199)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………. Test No….……


Location/Source …………….. Date of Sampling: ...………......
Date of Testing: ………..……
OBSERVATION TABLE
S. Description Unit Trial-1 Trial-2 Trial -3 Trial-4 Trial -5
No.

1 Wt. of Empty mould g

2 Wt. of mould + concrete before g


compaction

3 Wt. of partially compacted g


concrete W1 = (2) - (1)

4 Weight of mould + concrete after g


compaction

5 Weight of fully compacted g


concrete W2 = (4)-(1)

6 Compaction Factor = W1/W2

7 Average

8 Permissible limit

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GE (P) Chakeri

SLUMP TEST OF CONCRETE


(As per IS: 1199)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample…………… Test No….……


Location/Source…………. Date of Sampling……………
Date of Testing……………
OBSERVATION TABLE

S. No. Date of Location Type of sample Slump Permissible Limit


Testing (mm) (mm)
Remarks: …………………………………………………………………………………………………….
.

Lab Engineer Contractor’s Rep. J.E.(Civil) ENGR-IN-CHARGE

GE (P) Chakeri

CORE CUTTING DENSITY DETERMINATION FOR DAC - I


Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Layer No.: ……………. Date of Sampling: ...……….....
Lab Density :……………g/cc Date of Testing: ………..……
OBSERVATION SHEET
S. Chainag Height Wt. of Wt. of Wt. of Volume Density Compaction
No. e of core sample Sample in S.S.D (cc) (g/cc) %
(mm) in Air Water Sample(gm)
(gm) (gm)
1
2

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

DETERMINATION OF DENSITY (CONCRETE CORE )


Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Layer .: ……………. Date of Sampling: ...……….....
Date of Testing: ………..……
OBSERVATION SHEET
S. No. Chainage Height Dia of Volume Wt. of Core Density
of core core(cm) (cc) Sample(gm) (g/cc)
(cm)

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

ATTERBERG LIMITS
(As per IS: 2720 Part-V)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Date of Testing: ………..…….
OBSERVATION TABLE
LIQUID LIMIT
Particulars Sample 1 Sample 2 Sample 3 Sample 4
Number of Blows/Penetration
Container No.
Wt. of Container= W1, g
Wt. of Wet soil +container =W2,g
Wt. of oven dry soil +container = W3,gm
Wt. of Water Ww= W2-W3, g
Wt. of dry soil Ws=W3-W1, g
Water Content(%) = Ww/Ws X 100
Average Liquid Limit(%)
PLASTIC LIMIT
Particulars Sample 1 Sample 2 Sample 3 Sample 4
Container No.
Wt. of Container= W1, g
Wt. of Wet soil +container =W2,g
Wt. of oven dry soil +container = W3,gm
Wt. of Water Ww= W2-W3, g

Wt. of dry soil Ws=W3-W1, g


Water Content % = Ww/Ws X 100
Average Plastic Limit(%)

RESULT: Liquid Limit =…..…….%, Plastic Limit =…….……%, Plasticity Index =…….………%

Remarks: ………………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

MODIFIED PROCTOR DENSITY TEST


(As per IS: 2720 Part-VIII)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………... Test No….……


Location/Source: …………….. Date of Sampling: ...………....
3
Volume of mould (V): …….....…cm Date of Testing: ...……..…….

Description 1 2 3 4 5 6
Water Added (%)

Wt. of Mould = M1
Wt. of Mould + Compacted Material(M2gm)
Wt. of Compacted sample (M= M2- M1gm)
Volume of sample = V
Bulk Density of material γ= M/V gm/cc
Container No.
Wt. of Container= W1gm
Wt. of Wet material + container = W2 gm
Wt. of Oven Dry material + cont. = W3 gm
Wt. of water W4= W2-W3 gm
Wt. of Dry material W5= W3-W1gm

Water Content, wc % = W4/W5 *100


Dry density γd = γ X 100/(wc+100)gm/ cc

Dia of Weight of Height of Fall No. of blows No.of layers OMC(%) MDD(g/cc)
Mould(cm.) Rammer (kg.) (cm.)
15 / 10 4.89 45 55 / 25 5

Remarks: …………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GRAIN SIZE ANALYSIS OF SOIL


(As per IS: 2720 Part IV)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Weight of Sample……………. Date of Testing: ………..……
OBSERVATION TABLE
Sieve Size Weight Retained Cumulative Weight Cumulative Weight Passing
Retained Retained
mm (g) (%)
(g) (%)

75

19

4.75
2.00

0.425

0.075

Gravel = ……………..%, Sand = …………….%, Silt & Clay = …………….%

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


C.B.R TEST
(As per IS: 2720 Part XVI)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Volume of Mould (V): ……………
Correction factor……… Soaking Period: ..………… Date of Casting: ...……….....
M.D.D: ……………. O.M.C: …………. Date of Testing: ………..……

Mould No. Mould No. Mould No.


Description Before After Before After Before After
soaking soaking soaking soaking soaking soaking
Wt. of Mould + Wet Soil = W1 gm
Wt. of Mould = W2 gm
Wet of Wet Soil, W3 = W1 – W2
Bulk Density of Soil(γ) = W3/V gm/cc
Container No.
Weight of Container = w1 gm
Wt. of wet soil + Container = w2 gm
Wt. of Oven dry soil + Container = w3 gm
Wt. of Water w1 = w2 –w3 gm
Wt. of Dry soil w = w3 –w1 gm

Water Content % = w1/w x 100


Dry Density = γX 100 / (mc +100)gm/cc
Load Test: CBR = Pt / Ps X 100(Ps=1370kg at 2.5mm , Ps = 2055 kg at 5mm)
Mould No. Mould No.
(mm)Penetration
Mould No.

sReading

kgLoad

CBR%
sReading

kgLoad

sReading

kgLoad
CBR%

CBR%

CBR%

Avg.
0.0
0.5
1.0
1.5
2.0
2.5
3.0
4.0
5.0
7.5
10.0
12.5
Remark…......................................................................................CBR Value (%) = …………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

FREE SWELL INDEX OF SOIL


(As per IS: 2720 Part XXXX)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Date of Testing: ………..……

OBSERVATION SHEET

Sample No.
S. No. Description
1 2

1 Volume of Specimen in Kerosene Oil in Graduated


Cylinder after 24 hours = Vk

2 Volume of Specimen in Distilled Water in


Graduated Cylinder after 24 hours Vw

3 Difference in volume (Vw-Vk)


4 Free Swell Index = (Vw –Vk)/VkX100(%)

5 Average Free Swell Index %

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

CEMENT
(As per IS: 4031 Part I)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Brand /Make of Cement: …………… Date of Testing: ………..……
Week No. of Cement :……………

OBSERVATION TABLE

Description Trial 1 Trial 2 Average Permissible


Limit

Weight of cement, W1 (g)

Weight of cement retained on 90


micron IS sieve, W2 (g)

Fineness = W2/W1 x 100 %


Remarks: …………………………………………………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


CEMENT TEST

Name of work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STATION , JAMNAGAR
Contract Agreement No : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC BUILDCON Pvt Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: ……………. Date of Sampling: ...……….....
Brand/Type of Cement: …………… Date of Testing: ………..……
Week No. of cement :………….

OBSERVATION TABLE

S. Parameter Unit Results Permissible limits


No.

1 Fineness of cement % 10% Maximun


Consistency of cement 27%-35%
2 %

3 Initial setting of cement min 30 minutes minimum


4 Final setting of cement min 600 minutes maximum

5 Compressive Strength
3 days Strength N/mm2 23 N/mm2
Date (MPa)

7 days Strength N/mm2 33 N/mm2


Date (MPa)

28 days Strength N/mm2 43 N/mm2


Date (MPa)

6 Soundness of cement mm 10mm maximum

Remarks: ………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


COMPRESSIVE STRENGTH OF CEMENT
(As per IS: 4031 Part I)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Brand of Cement: …………… Date of Casting………………
Date of Testing: ………..……
OBSERVATION SHEET

S. No. Date of Age of Load (KN) Compressive Average Min. Permissible


Testing Testing Strength Compressive Limit
(N/mm2) Strength (N/mm2)
(N/mm2)
1.

2.

3.

4.

5.

6.

7.

8.

9.

Remarks: …………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civil) ENGR-IN-CHARGE


COMPRESSIVE STRENGTH OF CEMENT
(As per IS: 516)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Grade/Type of Concrete: …….…… Test No: ….……


Location/Source: …………….. Date of Casting…………..

Age of Testing…………… Date of Testing…………..

OBSERVATION SHEET
S. Wt. of Volume Density Area of Load
No. Specimen of (g/cc) specimen (KN) Compressive Avg. Permissi
(g) specimen (mm2) strength strength ble
(cc) Limit
(N/mm2) (N/mm2)
(N/mm2)

1.

2.

3.

4.

5.

6.

7.

8.

9.

Remarks: …………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

COMPRESSIVE STRENGTH OF CONCRETE


(As per IS: 516)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Grade/Type of Concrete: …….…… Test No: ….……


Location/Source: …………….. Date of Casting…………..

Age of Testing…………… Date of Testing…………..

OBSERVATION SHEET
S. Wt. of Volume Density Area of Load
No. Specimen of (g/cc) specimen (KN) Compressive Avg. Permissi
(g) specimen (mm2) strength strength ble
(cc) Limit
(N/mm2) (N/mm2)
(N/mm2)

1.

2.

3.

4.

5.

6.

7.

8.

9.

Remarks: …………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

INDIVIDUAL AGGREGATE GRADING FOR PQC


Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORK SERVICES AT AF STATION JAMNAGAR GUJARAT
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC Buildcon Pvt Ltd
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Weight of Sample……………… Date of Testing: ………..……
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)

1 37 100

90-100
2 31

3 26.5 85-95

4 19.0 68-88

5 9.5 45-65

6 4.75 30-55

7 600 micron 8-30

8 150 micron 0-10

9 75micron 0-2

Remarks: ………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


GE (P) Chakeri

COMBINED AGGREGATE GRADING FOR WMM


(As per MES Schedule P-I Cl. 20.B.2.5.4)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Weight of Sample……………… Date of Testing: ………..……

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 100

2. 45.00 95-100

3. 22.4 60-80

4. 11.2 40-60

5. 4.75 25-40

6. 2.36 15-30

7. 600 6-18
micron

8. 75 4-8
micron

Remarks: ……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

COMBINED AGGREGATE GRADING FOR DLC


(As per MORT & H Table 600-1)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Weight of Sample……………… Date of Testing: ………..……

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)

1 26.5
100

2 19.0 75-95

3 9.5 50-70

4 4.75 30-55

5 2.36 17-42

6 600 micron 8-22

7 300 micron 7-17

8 150 micron 2-12

9 0-10
75 micron

Remarks: …………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


GE (P) A/F Chakeri CWE (Chakeri) CE (Nagpur) E-IN-C

SOUNDNESS TEST FOR 20mm


(IS 2386 P-V)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….…………..


Location/Source: …………….. Date of Sampling: ...………......
Date of Testing: ………..……

OBSERVATION SHEET

Sl no. SODIUM MAGNESIUM


TEST NO. SULPHATE SULPHATE
1
Total Sample weight (W1) g

2
Weight of sample Passing Seive 20.00 mm & Retained
on 12.5 mm 67% of Sample weight (g)

3 Weight of Sample Passing Sieve 12.5 mm & Retained


on 10.00mm 33% of Sample weight (g)

4 After 5 Cycle test finished the Sample Passing sieve on


8.00mm (W2) g

5 Soundness Value = W2/W1x100 %

6 Permissible Limit % 12%MAX. 18%MAX.

Remarks: ……………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GE(P)AF CHAKERI CWE AF CHAKERI Lt Col Zaheer Abbas


SO1 (Runway)
E in C's Br
SOUNDNESS TEST FOR 40mm
(IS 2386 P-V)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Date of Testing: ………..……
OBSERVATION SHEET
SODIUM MAGNESIUM
TEST NO. SULPHATE SULPHATE
Sl no.

1
Total Sample weight (W1) (g)

2
Weight of sample Passing Seive 40.00 mm & Retained
on 25 mm 67% of Sample weight (g)

3 Weight of Sample Passing Sieve 25 mm & Retained on


20.00mm 33% of Sample weight (g)

4 After 5 Cycle test finished the Sample Passing sieve on


16.00mm (W2) g

5 Soundness Value = W2/W1x100 %

Permissible Limit %
6 12% MAX. 18% MAX.

Remarks: ……………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GE(P)AF CHAKERI CWE AF CHAKERI Lt Col Zaheer Abbas


SO1 (Runway)
E in C's Br
SOUNDNESS TEST FOR 26.5mm
(IS 2386 P-V)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Date of Testing: ………..……
OBSERVATION SHEET
Sl no. SODIUM MAGNESIUM
TEST NO. SULPHATE SULPHATE
1
Total Sample weight (W1) (g)

2
Weight of sample Passing Seive 40.00 mm &
Retained on 25 mm 67% of Sample weight (g)

3 Weight of Sample Passing Sieve 25 mm & Retained


on 20.00mm 33% of Sample weight (g)

4 After 5 Cycle test finished the Sample Passing sieve


on 16.00mm (W2) g

5 Soundness Value = W2/W1x100 %

Permissible Limit %
6 12% MAX. 18% MAX.

Remarks: ……………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GE(P)AF CHAKERI CWE AF CHAKERI Lt Col Zaheer Abbas


SO1 (Runway)
E in C's Br
SOUNDNESS TEST FOR 10mm
(IS 2386 P-V)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Date of Testing: ………..……
OBSERVATION SHEET

Sl no. SODIUM MAGNESIUM


TEST NO. SULPHATE SULPHATE
1
Total Sample weight (W1) (g)

2
Weight of sample Passing Seive 10 mm & Retained
on 4.75 mm 100% of Total Sample weight (g)

4 After 5 Cycle test finished the Sample Passing sieve


on 4.00mm (W2) gm

5 Soundness Value W2/W1x100 %

6 Permissible Limit % 12% MAX. 18% MAX.

Remarks: ……………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GE(P)AF CHAKERI CWE AF CHAKERI Lt Col Zaheer Abbas


SO1 (Runway)
E in C's Br

SOUNDNESS TEST FOR SAND


(IS 2386 P-V)
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Tested By: …………………. Date of Testing: ………..……
OBSERVATION SHEET
Sl SODIAM MAGNICIAM After 5 Cycle test finished the
no TEST NO. SULPHATE SULPHATE sample sieved as per I.S.
. sieves

Na2SO4 MgSO4
1 Weight of sample Passing Seive 10.00
mm & Retained on 4.75 mm (100gm )

2 Weight of Sample Passing Sieve 4.75


mm & Retained on 2.36mm (100g)
3 Weight of Sample Passing Sieve 2.36
mm & Retained on 1.18mm (100g)
4 Weight of Sample Passing Sieve 1.18
mm & Retained on 600 mic. (100g)
5 Weight of Sample Passing Sieve
600mic, & Retained on 300mic. (100g)
Total Weight (g)
6

7 Soundness Value W2/W1x100 %

8
Soundness of Aggregate in Sodium
Sulphate
12% Max
9
Soundness of Aggregate in Magnesium 18 % Max
Sulphate
Remark ………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GE(P)AF CHAKERI CWE AF CHAKERI Lt Col Zaheer Abbas


SO1 (Runway)

BULK DENSITY OF SAND


Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORK SERVICES AT AF STATION JAMNAGAR
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : M/S. KCC BUILDCON PVT LTD
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source:……………….. Date of Sampling: ...………......
Date of Testing: ………..……

OBSERVATION
Height of calibrating Cylinder = cm.
Diameter of calibrating Cylinder = cm.
Volume of calibrating Cylinder V =π D 2 H / 4

DETERMINATION BULK DENSITY OF SAND

S.No. Description Unit Trial-1 Trial-2 Trial-3

1 Wt. of Cylinder and Sand Before g


Pouring (W1)
2 Wt. of Cylinder and Sand After Pouring g
(W2)
3 Wt. of Sand in cone (w3) g

4 Wt. of Sand Filling Calibrating Cylinder g


W4=(W1-W2-W3)
5 Volume of Calibrating Cylinder (V) Cm3

6 Bulk Density of Sand =W4/V g/cc

7 Average Bulk density of Sand g/cc

Remark ………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

BULK DENSITY OF SAND


Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI , KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor: PNC Infratech Limited
Client : Military Engineer Services
Type of Sample: …………….… Test No….…… Location/Source:
…………….. Date of Sampling: ...………......
Date of Testing: ………..……

OBSERVATION
Height of calibrating Cylinder = cm.
Diameter of calibrating Cylinder = cm.
Volume of calibrating Cylinder V =π D ² H /4

Determination of Sand Weight in Cone


S. No. Description Unit Trial-1 Trial-2
1 Wt. of pouring Sand with Cylinder (w1) g

2 Wt. of Sand & Cylinder after Pouring of g


Sand on plane surface (w2)

3 Wt. of Sand in Cone W= (w1-w2) g

4 Average Wt. of Sand in Cone (w3) g

DETERMINATION BULK DENSITY OF SAND


S. No. Description Unit Trial-1 Trial-2
1 Wt. of pouring Sand with cylinder (w1) g

2 Wt. of Cylinder and Sand after Filling g


calibrating Cylinder(w4)
3 Wt. of Sand Filling Calibrating Cylinder and g
cone w5=(w1-w4)
4 Wt. of Sand in cone (w3) g

5 Wt. of Sand Filling Calibrating Cylinder g


W6=(w5-w3)
6 Volume of Calibrating Cylinder(V) Cm3

7 Bulk Density of Sand = W6/V g/cc

8 Average Bulk density of Sand g/cc

Remark ………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

\
SOUNDNESS TEST for 6 mm
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: ……………..Date of Sampling: ...………...... Tested
By: …………………. Date of Testing: ………..……

OBSERVATION SHEET

Sl no. SODIAM MAGNICIAM


TEST NO. SULPHATE SULPHATE REMARKS
1

Total Sample weight (W1) (g)


2
Weight of sample Passing Seive 10.00 mm
& Retained on 4.75 mm 100% of Sample
weight (g)

4 After 5 Cycle test finished the Sample


Passing sieve on 4.00mm (W2) gm

5 Soundness Value W2/W1x100 %

6.
Soundness of Aggregate in Sodium 12% Max
Sulphate

7
Soundness of Aggregate in Magnesium 18 % Max
Sulphate

Remark ………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

GRADATION FOR SOLING


Ref.: GSB - I (MORTH Table 400-1)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ….Demolition PQC below material Test No…


Location/Source: … Date of Sampling: ...02-10-2016
Weight of Sample…38720 g. Date of Testing: …02-10-2016
OBSERVATION SHEET

Sieve Wt. Cumulative Percentage Percentage Permissible


Size Retained Wt. Retained Retained Passing Limits
(mm) (gm) (gm) (%) (%) Grade-I Grade-II

75.0 00 00 00 100 100 - -

53.0 225 225 0.58 99.42 80-100 100 -

26.5 17780 18005 46.5 53.5 55-90 70-100

9.50 7205 25210 65.11 34.89 35-65 50-80

4.75 3145 28355 73.23 26.77 25-55 40-65

2.36 1785 30140 77.84 22.16 20-40 30-50

0.425 2705 32845 84.83 15.17 10-15 10-15

0.075 4615 37460 96.75 3.25 0-5 0-5

Remarks: …………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civil) Engineer-In-Charge

GRADATION FOR SOLING

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …. Demolition PQC crushed material Test No…


Location/Source: … Date of Sampling: ...19-09-2016
Weight of Sample…34750 g. Date of Testing: …19-09-2016

OBSERVATION SHEET

Sieve Wt. Retained Cumulative Wt. Percentage Percentage


Size (gm) Retained (gm) Retained Passing
(mm) (%) (%)
75.0 00 00 00 100

63 1950 1950 5.61 94.39

53 5550 7500 21.58 78.42

50 2850 10350 29.78 70.22

45 5900 16250 46.76 53.24

40 8650 24900 71.65 28.35

37.5 700 25600 73.66 26.34

31.5 7700 33300 95.82 4.18

26.5 950 34250 98.56 1.43

Remarks: …………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civil) Engineer-In-Charge

GRADATION FOR GSB


(As per IS: 2386 Part I/MORTH Table 400-1)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …. Test No…


Location/Source: … Date of Sampling: ...
Weight of Sample… g. Date of Testing: …
OBSERVATION SHEET

Sieve Wt. Cumulative Percentage Percentage Permissible


Size Retained Wt. Retained Retained Passing Limits
(mm) (gm) (gm) (%) (%) Grade-I Grade-II Grade-III

75.0 100 - -

53.0 80-100 100 100


26.5 55-90 70-100 55-75

9.50 35-65 50-80 -

4.75 25-55 40-65 10-30

2.36 20-40 30-50 -

0.425 10-15 10-15 -

0.075 <5 <5 <5

Remarks: …………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civil) Engineer-In-Charge

DESIGN MIX OF
WET MIX MACADAM
Name of work: Resurfacing of Runway and Allied Works at
AFS Panagarh

Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14

Name of the Contractor: PNC Infratech Limited


INDIVIDUAL AGGREGATE GRADING FOR WMM
(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……40mm Agg.Test No….……01


Location/Source: …PAKURDate of Sampling: ..10-04-2014 Weight of Sample… 12000 gDate of Testing: ….10-
04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100

2. 45.00 00 00 00 100 95-100

3. 22.4 9096 9096 75.8 24.2 60-80

4. 11.2 2890 11986 99.88 .12 40-60

5. 4.75 25-40

6. 2.36 15-30

7. 600 8-22
micron

8. 75 0-8
micron

Remarks: …………………………………………………………..

Lab EngineerContractor’sRep.J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR WMM


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……40mm Agg. Test No….……02Location/Source:


…PAKUR Date of Sampling: ..10-04-2014 Weight of Sample… 13148 g
Date of Testing: ….10-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100

2. 45.00 00 00 00 100 95-100

3. 22.4 9664 9664 73.48 26.51 60-80

4. 11.2 3464 13128 99.85 .15 40-60

5. 4.75 25-40

6. 2.36 15-30

7. 600 8-22
micron

8. 75 0-8
micron

Remarks: ……………………………………………………………………………………………………..

Lab EngineerContractor’s Rep. J.E.(Civil)A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR WMM


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……20mm Agg. Test No……..01 Location/Source: …PAKUR


Date of Sampling: ..10-04-2014 Weight of Sample…11514 g Date
of Testing: …10-04-2014
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100

2. 45.00 00 00 00 100 95-100

3. 22.4 48 48 .42 99.58 60-80

4. 11.2 10814 10862 94.34 5.66 40-60

5. 4.75 626 11488 99.77 .23 25-40

6. 2.36 15-30

7. 600 8-22
micron

8. 75 0-8
micron

Remarks: ……………………………………………………………………………………………………..

Lab EngineerContractor’s Rep. J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR WMM


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……20mm Agg.Test No….…… 02Location/Source: …PAKUR


Date of Sampling: ..10-04-2014 Weight of Sample…9654 g Date
of Testing: …10-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100

2. 45.00 00 00 00 100 95-100

3. 22.4 48 48 .50 99.50 60-80

4. 11.2 8910 8958 92.79 7.21 40-60

5. 4.75 642 9600 99.44 .56 25-40

6. 2.36 15-30

7. 600 8-22
micron

8. 75 0-8
micron

Remarks: ……………………………………………………………………………………………………..

Lab EngineerContractor’s Rep. J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR WMM


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….10mm Agg.Test No….…… 01 Location/Source: …PAKUR


Date of Sampling: ..10-04-2014 Weight of Sample…5020 g Date
of Testing: …10-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100

2. 45.00 00 00 00 100 95-100


3. 22.4 00 00 00 100 60-80

4. 11.2 34 34 .68 99.32 40-60

5. 4.75 4716 4750 9462 5.38 25-40

6. 2.36 214 4964 98.88 1.12 15-30

7. 600 12 4976 99.12 .88 8-22


micron

8. 75 0-8
micron

Remarks: ……………………………………………………………………………………………………..

Lab EngineerContractor’s Rep. J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR WMM


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….10mm Agg.Test No….…… 02 Location/Source: …PAKUR


Date of Sampling: ..10-04-2014 Weight of Sample…4990 g Date
of Testing: …..10-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100

2. 45.00 00 00 00 100 95-100

3. 22.4 00 00 00 100 60-80

4. 11.2 40 40 .80 99.20 40-60


5. 4.75 4670 4710 94.39 5.61 25-40

6. 2.36 180 4890 98.00 2.00 15-30

7. 600 14 4904 98.28 1.72 8-22


micron

8. 75 0-8
micron

Remarks: ……………………………………………………………………………………………………..

Lab EngineerContractor’sRep.J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR WMM


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….STONE DUSTTest No….……01Location/Source: …PAKUR


Date of Sampling: ..10-04-2014 Weight of Sample…3326g Date
of Testing: … 10-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100

2. 45.00 00 00 00 100 95-100

3. 22.4 00 00 00 100 60-80

4. 11.2 00 00 00 100 40-60

5. 4.75 328 328 9.86 90.13 25-40

6. 2.36 914 1242 37.34 62.66 15-30

7. 600 1144 2386 71.74 28.26 8-22


micron

8. 75 708 3094 93.02 6.98 0-8


micron

Remarks: ……………………………………………………………………………………………………..

Lab EngineerContractor’sRep.J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR WMM


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….STONE DUSTTest No….…… 02 Location/Source: …PAKUR


Date of Sampling: ..10-04-2014 Weight of Sample…3200 g Date
of Testing: … 10-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100

2. 45.00 00 00 00 100 95-100

3. 22.4 00 00 00 100 60-80

4. 11.2 00 00 00 100 40-60

5. 4.75 270 270 8.44 91.56 25-40

6. 2.36 874 1144 35.75 64.25 15-30

7. 600 1150 2294 71.69 28.31 8-22


micron

8. 75 652 2946 92.06 7.94 0-8


micron
Remarks: ……………………………………………………………………………………………………..

Lab EngineerContractor’s Rep. J.E.(Civil) A.G.E/Engineer-In-Charge

AVG. OF PASSING PERCENTAGE


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No. : CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….WMMTest No….…… 01Location/Source: …PAKUR Date of


Sampling: ..10-04-2014
. Date of Testing: … .. 10-04-2014

Sl. Sieve size % passing % passing % passing % passing


No. (mm) ( 40 mm) ( 20 mm) ( 10 mm) ( stone dust )

1 53.00 100 100 100 100

2 45.00 100 100 100 100

3 22.4 25.36 99.54 100 100

4 11.2 0.14 6.44 99.26 100

5 4.75 0.4 5.5 90.84

6 2.36 1.56 63.46

7 600 1.3 28.29


micron

8 75 7.46
micron

Remarks: ……………………………………………………………………………………………………..
(Lab Engineer)(Contractor’s Rep.)(J.E.(Civil) (A.G.E/Engineer-In-Charge)

JOB MIX FORMULA FOR WMM


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: …....WMM TRIAL NO.…… 01 Location/Source: …PAKUR


Date of Sampling: ..10-04-2014
Date of Testing: … 10-04-2014

Sieve
size ( 40 mm) ( 20 mm) ( 10 mm) ( stone dust ) ALL LIMIT AS
(mm) IN % PER CA
PASSI
NG
Passing 25% Passing 25% Passing 20% Passing 30%
% % % %
53.00 100 25 100 25 100 20 100 30 100 100

45.00 100 25 100 25 100 20 100 30 100 95-100

22.4 25.36 6.34 99.54 24.89 100 20 100 30 81.23 60-80

11.2 0.14 0.04 6.44 1.61 99.26 19.85 100 30 51.5 40-60

4.75 0.4 0.1 5.5 1.1 90.84 27.25 28.45 25-40

2.36 1.56 0.31 63.46 19.04 19.35 15-30

600 1.3 0.26 28.29 8.49 8.75 8-22


micron

75 7.46 2.24 2.24 0-8


micron

Remarks: …Fail in grading


Lab Engineer Contractor’s Rep.J.E.(Civil) A.G.E/Engineer-In-Charge

JOB MIX FORMULA FOR WMM


(As per CA NO.CE (AF) SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No. : CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….WMMTRIAL. NO- 02 Location/Source: …PAKUR


Date of Sampling: ..10-04-2014
Date of Testing: … 10-04-2014

( 40 mm) ( 20 mm) ( 10 mm) ( stone dust ) ALL IN % LIMIT


Sieve PASSING PER CA
size AS
Passing 30% Passing 20% Passing 20% Passing 30%
( mm) % % % %
53.00 100 30 100 20 100 20 100 30 100 100

45.00 100 30 100 20 100 20 100 30 100 95-100

22.4 25.36 7.61 99.54 19.85 100 20 100 30 77.52 60-80

11.2 0.14 0.04 6.44 1.29 99.26 19.85 100 30 51.18 40-60
2

4.75 0.4 0.08 5.5 1.1 90.84 27.25 28.43 25-40

2.36 1.56 0.31 63.46 19.04 19.35 15-30

600 1.3 0.26 28.29 8.49 8.75 8-22


micron

75 7.46 2.24 2.24 0-8


micron

Remarks: ……Pass in grading

Lab Engineer Contractor’s Rep. J.E.(Civil) A.G.E/Engineer-In-Charge


COMBINED GRADING FOR WMM
(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….WMM. TRIAL ….…… 01 Location/Source: …PAKUR


Date of Sampling: ..10-04-2014.
Date of Testing: … 10-04-2014

40 mm 25% 2500 g.
20 mm 25%2500 g.
10 mm 20% 2000 g.
Stone dust 30% 3000 g.
Total sample wt. .10000g.

Sl. Sieve size % passing % passing % passing % passing Limit as per


No. (mm) ( 40 mm) ( 20 mm) ( 10 mm) ( stone dust ) CA
1 53.00 00 00 00 100 100

2 45.00 00 00 00 100 95-100

3 22.4 1680 1680 16.8 83.2 60-80

4 11.2 3476 5156 51.56 48.44 40-60

5 4.75 1986 7142 71.42 28.58 25-40

6 2.36 868 8010 80.1 19.9 15-30

7 600 1035 9045 90.45 9.55 8-22


micron

8 75 654 9699 96.99 3.01 0-8


micron

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep.J.E.(Civil) A.G.E/Engineer-In-Charge

COMBINED GRADING FOR WMM


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work : Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No. : CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor : PNC Infratech Limited
Type of Sample: ….WMM. TRIAL….…… 02
Location/Source: …PAKUR Date of Sampling: ..10-04-2014
. Date of Testing: … 10-04-2014

40 mm 30% 3000g.
20 mm 20% 2000 g.
10 mm 20% 2000 g.
Stone dust 30% 3000 g.
Total sample wt. .10000g.

Sl. Sieve size % passing % passing % passing % passing Limit as per


No. (mm) ( 40 mm) ( 20 mm) ( 10 mm) ( stone dust ) CA
1 53.00 0 0 00 100 100

2 45.00 0 0 00 100 95-100

3 22.4 2805 2805 28.05 71.95 60-80

4 11.2 2202 5007 50.07 49.93 40-60

5 4.75 2132 7139 71.39 28.61 25-40

6 2.36 899 8038 80.38 19.62 15-30

7 600 1044 9082 90.82 9.18 8-22


micron

8 75 633 9715 97.15 2.85 0-8


micron

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E. (Civil) A.G.E/Engineer-In-Charge


FLAKINESS INDEX AND ELONGATIONINDEX
(As per IS: 2386 Part-I)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample….WMM MIXED MATERIAL Test No……………….


Location/Source: …LAB SITE Date of Sampling:…03-05-2014
Tested by…..Jointly Date of Testing: …..03-05-2014
OBSERVATION SHEET
SIZE OF SIEVE WIEGHT OF WIEGHT OF WIEGHT OF WIEGHT OF
SL. FRACTION AGG. IN AGG. IN EACH AGG.IN
NO. PASSING RETAINED CONSISTING EACH FRACTION EACH
THROUGH ON SIEVE OF ATLEAST FRACTION RETAINED ON FRACTION
SIEVE (MM) (MM) 200 retained PASSING THICKNESS RETAINED
Pieces THICKNESS GAUGE ON LENGTH
(gm) GAUGE (gm) GAUGE
(gm) (gm)
A B C D E F
1 63 50 - - - -
2 50 40 - - - -
3 40 31.5 2062 480 1582 00
4 31.5 25 3986 292 3694 -
5 25 20 4242 360 3882 616
6 20 16 2750 266 2484 404

7 16 12.5 1444 182 1262 178


8 12.5 10 1074 190 884 208
9 10 6.3 726 136 590 142
TOTAL 16284 1906 14378 1548

(A) FLAKINESS INDEX (F.I)=Totalwt.of flaky material x 100=…11.7…….%


Total wt. Sample
(B) ELONGATION INDEX (E.I) = Total wt.of Elongation material x 100 = ….10.76..…….. %
Total wt.ofnon flaky material
(C) COMBINED FLAKINESS & ELONGATION INDEX = (A) + (B)= …22.46………%

PERMISSIBLE LIMIT = ………15%…(Flakiness)…& 30% (Combined)

Remarks: ………………………………………………………………………………………

Lab Engineer Contractor’s Rep.J.E.(Civil) A.G.E/Engineer-In-Charge


LOS ANGELES ABRASION TEST
(As per IS: 2386 Part IV)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type /Grade of Sample: …WMM MIXED MATERIAL/ GTest No…01


Location/Source: ..LAB SITE Weight of charges…
No.of charges…..12 Date of Sampling: ...03-05-2014

No.of Revolutions -………….500 / 1000 Date of Testing: …03-05-2014

Description Trial 1 Trial 2

Weight of Sample, W1 gm 10000 10000

Wt. of fraction retained 1.70mm IS Sieve (W2) gm 8580 8494

Weight of fraction passing 1.70 mm I.S. Sieve, W3= W1-W2 1470 1506

Los Angeles Abrasion Value = W3/W1 x 100 % 14.70 15.06

14.88
Average of Los Angeles Abrasion Value %

LIMITS -
Specified WMM DLC M-25 PQC DBM DAC
limits
(%) 35 35 35 35 30

Remarks: …………………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civil) A.G.E/Engineer-In-Charge

MODIFIED PROCTOR DENSITY TEST


(As per IS: 2720 Part-VIII)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited
Type of Sample: ……..WMMTest No….……01
Location/Source: …….LAB Date of Sampling: ..15-04-2014
Volume of mould (V): .2250cc.Date of Testing: .....15-04-2014
Description 1 2 3 4 5 6
Water Added (%) =Wc 3% 4% 5% 6% 7% 8%

Wt. of Empty Mould =M1(gm) 6106 6106 6106 6106 6106 6106

Wt. of Mould + Compacted Material=M2(gm) 11478 11664 11844 12098 12002 11982
Wt. of Compacted sample M= M2- M1 (gm) 5372 5558 5738 5902 5896 5876
Volume of sample = V (cc) 2250 2250 2250 2250 2250 2250
Bulk Density of material γ = M/V ( gm/cc) 2.388 2.470 2.550 2.623 2.620 2.612
Container No. 19 03 20 06 21 04
Wt. of Container= W1(gm) 150.7 160.7 158.1 137.4 159.1 128.7
Wt. of Wet material + container = W2( gm) 408.7 391.7 394.4 365.6 415.6 331.6
Wt. of Oven Dry material + cont. = W3 ( gm) 398.4 381.0 381.5 351.8 399.9 317.1
Wt. of Dry material W4= W3-W1 (gm) 247.7 220.3 223.4 214.4 240.8 188.4
Wt. of water W5= W2-W3 (gm) 10.3 10.7 12.9 13.8 15.7 14.5
Water Content, W % = W5/W4 *100 4.16 4.86 5.57 6.44 6.52 7.70
Dry density yd = γ X 100/(wc+100)gm/ cc 2.293 2.356 2.415 2.464 2.460 2.425

Dia of Weight of Height of Fall No. of blows No.of layers OMC(%) MDD(g/cc)
Mould(cm.) Rammer (kg.) (cm.)
15 4.89 450 55 5 6.5 2.455

Remarks: ……………………………………………………………………………………………….……

Lab Engineer Contractor’s Rep.J.E.(Civil) A.G.E/Engineer-In-Charge

AGGREGATE CRUSHING VALUE TEST


(As per IS: 2386 Part-IV)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: …WMM MIXED MATERIALTest No…01


Location/Source: … LABDate of Sampling: ...03-05-2014
Tested by ……Jointly Date of Testing: ….03-05-2014
S. No. Particulars Sample No.1 Sample No. 2

2996 2996
1 12.50mm Passing 10.00mm Retained dry wt. of sample
(W1) gm

2504 2520
2 Wt. Of Aggregate retained 2.36 mm IS Sieve (W2) gm

492 476
3 Wt. of Aggregate Passing 2.36MM IS Sieve after test
(W3) gm = (W1-W2)

16.42 15.89
4 Crushing Value % =(W3/W1)x100

16.16
5 Average Crushing Value (%)

PERMISSIBLE LIMIT - 35% Maximum

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civil) A.G.E/Engineer-In-Charge

AGGREGATE IMPACT VALUE


(As per IS: 2386 Part-IV)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: …WMM MIXED MATERIAL Test No….01


Location/Source: …LABDate of Sampling: ...03-05-2014 Tested by …Jointly Date of Testing: …03-
05-2014

OBSERVATION SHEET
S. No.
Test No. 1 2 Permissible
Limit
(%)
1 Mass of Aggregate(Oven Dry) Passing 12.5 mm IS 356 356
Sieve and Retained on 10 mm IS Sieve (Wa) (gm)

2 Mass of Fraction Retained on 2.36 mm IS Sieve 325 323


(Wb) (gm)

3 Mass of Fraction Passing 2.36 mm IS Sieve (Wc)(gm) 31 33

4 Aggregate Impact Value = Wc/Wa x 100 8.71 9.27

5 Average Aggregate Impact Value (%) 8.99


18%

Remarks: ………………………………………………………………………………………

Lab Engineer (Contractor’s Rep.)J.E.(Civil) A.G.E/Engineer-In-Charge


WATER ABSORPTION OF COARSE& FINE AGGREGATE
(As per IS: 2386 Part-III)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: …WMMTest No….01


Location/Source: …PAKUR Date of Sampling: ...04-05-2014
Tested by…JointlyDate of Testing: …04-05-2014
40.00 MM AGGREGATE

Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits

2406 2383 0.97 0.9


1 4 Max. 2%
2 2542 2519 0.91

20.00MM AGGREGATE

Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits

2102 2083 0.91 0.9


1 1 Max. 2%
2 2210 2190 0.91

10.00MM AGGREGATE

Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits

1820 1803 0.94 0.9


1 6 Max. 2%
2 1654 1638 0.98

STONE DUST

Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits

609 600 1.50 1.5


1 2 Max. 2%
2 598 589 1.53

Remarks: ……………………………………………………………………………………………………..

Lab Engineer (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

ATTERBERG LIMITS
(As per IS: 2720 Part-V)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Tested by…………. Date of Testing: ………..…….
OBSERVATION SHEET

LIQUID LIMIT
Particulars Sample 1 Sample 2 Sample 3 Sample 4
Number of Blows
Container No.
Wt. of Container= W1, g
Wt. of Wet soil +container =W2,g
Wt. of oven dry soil +container = W3,gm
Wt. of dry soil Ws=W3-W1, g
Wt. of Water Ww= W2-W3, g
Water Content(%) = Ww/Ws X 100
Average Liquid Limit(%)

PLASTIC LIMIT
Particulars Sample 1 Sample 2 Sample 3 Sample 4
Container No.
Wt. of Container= W1, g
Wt. of Wet soil +container =W2,g
Wt. of oven dry soil +container = W3,gm
Wt. of dry soil Ws=W3-W1, g

Wt. of Water Ww= W2-W3, g


Water Content % = Ww/Ws X 100
Average Plastic Limit(%)

RESULT: Liquid Limit=……….%, Plastic Limit=…………%, Plasticity Index=……………%

(Lab Incharge) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge


DESIGN MIX OF
DRYLEAN CEMENT
CONCRETE

Name of work : Resurfacing of Runway and Allied


Works at AFS Panagarh

Contract Agreement No. : CE(AF)SZ/PAN/18 OF 2013-14

Name of the Contractor : PNC InfratechLimited

INDIVIDUAL AGGREGATE GRADING FOR DLC


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……20mm Agg. Test No….……01


Location/Source: ……PAKUR Date of Sampling: …11-04-2014
Weight of Sample……10000 gm. Date of Testing: …...11-04-2014
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100

2. 19 1392 1392 13.92 86.08 80-100

3. 9.5 8342 9734 97.34 2.66 55-75

4. 4.75 256 9990 99.90 0.10 35-60

5. 600 10-35
micron

6. 75 0-5
micron

Remarks: ……………………………………………………………………………………………………..

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR DLC


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……20mm Agg. Test No….……02


Location/Source: ……PAKUR Date of Sampling: …11-04-2014
Weight of Sample……10002 gm. Date of Testing: …...11-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100
2. 19 1872 1872 18.71 81.29 80-100

3. 9.5 7922 9794 97.92 2.08 55-75

4. 4.75 194 9988 99.86 0.14 35-60

5. 600 10-35
micron

6. 75 0-5
micron

Remarks: ……………………………………………………………………………………………………..

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR DLC


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……10mm Agg. Test No….……01


Location/Source: ……PAKUR Date of Sampling: …11-04-2014
Weight of Sample……7000 gm. Date of Testing: …...11-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100

2. 19 00 00 00 100 80-100

3. 9.5 250 250 3.57 96.43 55-75


4. 4.75 6470 6720 96.00 4.00 35-60

5. 600 244 6964 99.49 0.51 10-35


micron

6. 75 0-5
micron

Remarks: ……………………………………………………………………………………………………..

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR DLC


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……10mm Agg. Test No….……02


Location/Source: ……PAKUR Date of Sampling: …11-04-2014
Weight of Sample……8000 gm. Date of Testing: …...11-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100

2. 19 00 00 00 100 80-100

3. 9.5 200 200 2.5 97.5 55-75

4. 4.75 7404 7604 95.05 4.95 35-60

5. 600 330 7934 99.18 0.82 10-35


micron

6. 75 0-5
micron

Remarks: ……………………………………………………………………………………………………..

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR DLC


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: …….SANDTest No….……01


Location/Source: ……AJAY RIVER Date of Sampling: …11-04-2014
Weight of Sample……1000gm.Date of Testing: …...11-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100

2. 19 00 00 00 100 80-100

3. 9.5 00 00 00 100 55-75

4. 4.75 18 18 1.8 98.2 35-60

5. 600 462 480 48.0 52.0 10-35


micron

6. 75 510 990 99.0 1.00 0-5


micron
Remarks: ……………………………………………………………………………………………………..

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL AGGREGATE GRADING FOR DLC


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: …….SAND Test No….……02


Location/Source: ……AJAY RIVER Date of Sampling: …11-04-2014
Weight of Sample……1000 gm. Date of Testing: …...11-04-2014

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100

2. 19 00 00 00 100 80-100

3. 9.5 00 00 00 100 55-75

4. 4.75 14 14 1.4 98.6 35-60

5. 600 460 474 47.4 52.6 10-35


micron

6. 75 514 988 98.8 1.2 0-5


micron

Remarks: ……………………………………………………………………………………………………..
(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

AVERAGE OF PERCENTAGE PASSING


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……DLCTest No….……01


Location/Source: …..PAKUR Date of Sampling: ...11-04-2014
Date of Testing: …..11-04-2014

OBSERVATION SHEET

Sl. Sieve size (mm) Passing % Passing % Passing %


No. 20mm 10mm Sand

1. 26.5 100 100 100

2. 19 83.28 100 100

3. 9.5 2.37 96.97 100

4. 4.75 0.12 4.48 98.4

5. 600 0.67 52.3


micron

6. 75 1.1
micron

Remarks: ……………………………………………………………………………………………………..

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge


JOB MIX FORMULA FOR DLC
(As per CA NO.CE (AF) SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No. : CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……..DLC Test No….……01


Location/Source: ……PAKUR Date of Sampling: …11-04-2014
Date of Testing: …...11-04-2014

( 20 mm) ( 10 mm) ( Sand) ALL IN % LIMIT


size
Passing 33% Passing %27% Passing 40% PASSING PER CA
% %
( mm) AS
26.50 100 33 100 27 100 40 100 100

19.00 83.28 27.48 100 27 100 40 94.48 80-100

9.50 2.37 0.78 96.97 26.18 100 40 66.96 55-75

4.75 0.12 0.04 4.48 1.21 98.40 36.36 37.61 35-60

600 0.67 0.18 52.30 20.92 21.10 10-35


Mic.

75 1.10 0.44 0.44 00-10


Mic.


Remarks: ………………………………………………………………………………….

(Lab Engineer) Contractor’s Rep. J.E.(Civil) A.G.E/Engineer-In-Charge


JOB MIX FORMULA FOR DLC
(As per CA NO.CE (AF) SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No. : CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……..DLC Test No….……02


Location/Source: ……PAKUR Date of Sampling: …11-04-2014
Date of Testing: …...11-04-2014

( 20 mm) ( 10 mm) ( Sand) ALL IN % LIMIT


size
Passing 30% Passing %30% Passing 40% PASSING PER CA
% %
( mm) AS
26.50 100 33 100 30 100 40 100 100

19.00 83.28 24.98 100 30 100 40 94.48 80-100

9.50 2.37 0.71 96.97 29.09 100 40 66.96 55-75

4.75 0.12 0.036 4.48 1.34 98.40 36.36 37.61 35-60

600 0.67 0.20 52.30 20.92 21.10 10-35


Mic.

75 1.10 0.44 0.44 00-10


Mic.

Remarks: ……………………………………………………………………………..

(Lab Engineer) Contractor’s Rep. J.E.(Civil) A.G.E/Engineer-In-Charge

COMBINED AGGREGATE GRADING FOR DLC


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……..DLC Test No….……01


Location/Source: ……PAKUR Date of Sampling: …11-04-2014
Date of Testing: …...11-04-2014

20mm Agg. 33% 3300g.


10mm Agg. 27% 2700g.
Sand 40% 4000g.
Total weight 100% 10000g.

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100

2. 19 500 500 5.00 95.00 80-100

3. 9.5 1790 2290 22.90 77.10 55-75

4. 4.75 3646 5936 59.36 40.64 35-60

5. 600 1938 7874 78.74 21.26 10-35


micron

6. 75 2104 9978 99.78 0.22 0-5


micron

Remarks: ………Grading is fail.

(Lab Engineer) (Contractor’s Rep.)J.E.(Civil) A.G.E/Engineer-In-Charge

COMBINED AGGREGATE GRADING FOR DLC


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……..DLC Test No….……02


Location/Source: ……PAKUR Date of Sampling: …11-04-2014
Date of Testing: …...11-04-2014

20mm Agg. 30% 3000g.


10mm Agg. 30% 3000g.
Sand 40% 4000g.
Total weight 100% 10000g.

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100

2. 19 662 662 6.62 93.38 80-100

3. 9.5 2552 3214 32.14 67.86 55-75

4. 4.75 2748 5962 59.62 40.38 35-60

5. 600 1676 7638 76.38 23.62 10-35


micron

6. 75 2310 9948 99.48 0.52 0-5


micron

Remarks: …………Grading is pass………………………………………………………………………

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

PNC Infratech Limited


Name of work : Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No. : CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor : PNC Infratech Limited

USE OF MATERIAL:

Coarse Source Specific Gravity Water


Agg.&Fine Absorption
Agg.
40mm Pakur 2.884 0.94
20mm Pakur 2.88 0.91
10mm Pakur 2.86 0.93
Sand Ajay River 2.575 1.30
Cement ACC (PPC)
Water Plant Site

QUANTITY OF MATERIAL:

COARSE AGG.:

V =[W + C/SG +(1/1-P)*Ca/SG]*1/1000

0.98=[150 + 250/3.15 + 1/0.6 * Ca/2.87]*1/1000

= 1292.593 Kg = 1292.6 Kg

AGGREGATE RATIO: = 20mm : 10mm = 50 : 50

20mm Agg.= 646.3 Kg

10mm Agg.= 646.3 Kg

FINE AGG.:

V = [W + C/SG +(1/1-P)*Ca/SG]*1/1000

0.98= [150 + 250/3.15 + 1/0.4 * Fa/2.575]*1/1000

= 773.154 Kg
COMPRESSIVE STRENGTH OF CONCRETE
(As per IS: 516)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Grade/Type of Concrete: …DLCWITH ACC PPCCEMENTTest No: …01


Location/Source: ..LAB.Date of Casting…07-04-2014
Age of Testing…07 DaysDate of Testing....14-04-2014.

OBSERVATION SHEET

S. Wt. of Volume of Density Area of Load


No. Specimen specimen (gm/cc) specimen (mm2) (KN) Compressive Avg.
(gm) (cc) strength strength
(N/mm2) (N/mm2)

1. 8565 3375 2.538 22500 367 16.31


2. 8331 3375 2.468 22500 353 15.69 16.89
3. 8455 3375 2.505 22500 420 18.67
4.
5.
6.
7.
8.
9.

Remarks: …………………………………………………………………………………………………….

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

COMPRESSIVE STRENGTH OF CONCRETE


(As per IS: 516)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Grade/Type of Concrete: …DLC WITH BIRLA PPC CEMENTTest No: …01


Location/Source: ..LAB.Date of Casting…08-04-2014
Age of Testing…07 DaysDate of Testing....15-04-2014.

OBSERVATION SHEET

S. Wt. of Volume of Density Area of Load


No. Specimen specimen (gm/cc) specimen (mm2) (KN) Compressive Avg.
(gm) (cc) strength strength
(N/mm2) (N/mm2)

1. 8406 3375 2.491 22500 315 14.00


2. 8386 3375 2.485 22500 316 14.04 13.75
3. 8430 3375 2.498 22500 297 13.20
4.
5.
6.
7.
8.
9.

Remarks: …………………………………………………………………………………………………….

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge


DESIGN MIX OF
PAVEMENT QUALITY
CONCRETE

Name of work : Resurfacing of Runway and Allied


Works at AFS Panagarh

Contract Agreement No. : CE(AF)SZ/PAN/18 OF 2013-14

Name of the Contractor : PNC Infratech Limited


COMBINED AGGREGATE GRADING FOR PQC
(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Weight of Sample……………… Date of Testing: ………..……

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 31.5 100

2. 26.5 85-95

3. 19 68-88

4. 9.5 45-65

5. 4.75 30-55

6. 600 micron 8-30

7. 150 micron 5-15

8. 75 0-5
micron

Remarks: ……………………………………………………………………………………………………..

(Lab Incharge) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

COMPRESSIVE STRENGTH OF CONCRETE


(As per IS: 516)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited
Grade/Type of Concrete: …PQCWITH JP CEMENT OPC-43GRADETest No: …01
Location/Source: ..LAB TEST FOR DESIGN MIXDate of Casting..11-05-2014
Age of Testing…..07 DAYS Date of Testing..18-05-2014

OBSERVATION SHEET
S. Wt. of Volume of Density Area of Load (KN)
No. Specimen specimen (gm/cc) specimen Compressive Avg.
(gm) (cc) (mm2) strength strength

(N/mm2) (N/mm2)

1. 8806 3375 2.609 22500 972 43.20


2. 8725 3375 2.585 22500 967 42.98 44.25
3. 8761 3375 2.596 22500 1048 46.58
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Remarks: …………………………………………………………………………………………………….

(Lab Incharge) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

COMPRESSIVE STRENGTH OF CONCRETE


(As per IS: 516)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Grade/Type of Concrete: …PQC WITH ULTRATECH CEMENT OPC-43GRADE Test No: …01
Location/Source: ..LAB TEST FOR DESIGN MIX Date of Casting..11-05-2014
Age of Testing…..07 DAYS Date of Testing..18-05-2014

OBSERVATION SHEET

S. Wt. of Volume of Density Area of Load (KN)


No. Specimen specimen (gm/cc) specimen Compressive Avg.
(gm) (cc) (mm2) strength strength

(N/mm2) (N/mm2)

1. 8856 3375 2.624 22500 564 25.07


2. 8575 3375 2.541 22500 895 39.78 37.89
3. 8534 3375 2.529 22500 810 36.00
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

Remarks: …………………………………………………………………………………………………….

(Lab Incharge) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge


DESIGN MIX OF
GRANULAR SUB-BASE
Name of work : Resurfacing of Runway and Allied
Works at AFS Panagarh

Contract Agreement No. : CE(AF)SZ/PAN/18 OF 2013-14

Name of the Contractor : PNC Infratech Limited


PNC INFRATECH LIMITED

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

QUALITY & SOURCE


Description Source Specific Gravity Water
Absorption
40mmAgg. Pakur 2.884 0.94
10mmAgg. Pakur 2.86 0.93
StoneDust Pakur 2.86 1.65
Water Plant Site
Modified Proctor OMC 6.0%
Modified Proctor MDD 2.412 g/cc
CBR VALUE @ 2.5 mm 50.79 %
CBR VALUE @ 5.0 mm 101.06 %
Plasticity Index NON-PLASTIC

Remarks: …………………………………………………………………………

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUALGRADATION FOR GSB


(As per IS: 2386 Part I/MORTH Table 400-1)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….40mm Test No…01


Location/Source: …LAB. SITE Date of Sampling: ...08-05-2014
Weight of Sample…10004g. Date of Testing: …08-05-2014
OBSERVATION SHEET

Sl. Sieve size Wt. Retained Cumulative Wt. % Cum. Wt. %Wt.
No. (mm) (gm) Retained Retained Passing
(gm)
1. 75 00 00 100
00

2. 53 00 00 00 100

3. 26.5 5404 5404 54.02 45.98

4. 9.5 4600 10004 100 00

5. 4.75 - - - -

6. 2.36

7. 0.425

8. 0.075

Remarks: …………………………………………………………………………

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUAL GRADATION FOR GSB


(As per IS: 2386 Part I/MORTH Table 400-1)

Name of work: Resurfacing/ Strengthening of Runway at A/F Station Chakeri, Kanpur


Contract Agreement No.: CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor: PNC Infratech Limited

Type of Sample: ………………. Test No………………


Location/Source: ……………… Date of Sampling: ....................
Weight of Sample……………… Date of Testing: ……………
OBSERVATION SHEET

Sl. Sieve Wt. Retained Cumulative Wt. % Cum. Wt. %Wt.


No. size (gm) Retained Retained Passing
(mm) (gm)
1. 75

2. 53

3. 26.5

4. 9.5

5. 4.75

6. 2.36

7. 0.425

8. 0.075

Remarks: ………………………………………………………………………………

Lab Engineer Contractor’s Rep. J.E.(Civil) Engineer-In-Charge

INDIVIDUALGRADATION FOR GSB


(As per IS: 2386 Part I/MORTH Table 400-1)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….10mm Test No…01


Location/Source: …LAB. SITE Date of Sampling: ...08-05-2014
Weight of Sample…5950g. Date of Testing: ..…08-05-2014
OBSERVATION SHEET
Sl. Sieve size Wt. Retained Cumulative Wt. % Cum. Wt. %Wt.
No. (mm) (gm) Retained Retained Passing
(gm)
1. 75 00 00 100
00

2. 53 00 00 00 100

3. 26.5 00 00 00 100

4. 9.5 1574 1574 26.45 73.55

5. 4.75 4324 5898 99.13 0.87

6. 2.36 8 5906 99.26 0.74

7. 0.425 3 5909 99.31 0.69

8. 0.075 - - - -

Remarks: ……………………………………………………………………………………

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUALGRADATION FOR GSB


(As per IS: 2386 Part I/MORTH Table 400-1)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….10mm Test No……02


Location/Source: …LAB. SITE Date of Sampling: ...08-05-2014
Weight of Sample…6588g. Date of Testing: …08-05-2014
OBSERVATION SHEET

Sl. Sieve Wt. Retained Cumulative Wt. % Cum. Wt. %Wt.


No. size (gm) Retained (gm) Retained Passing
(mm)
1. 75 00 00 100
00

2. 53 00 00 00 100

3. 26.5 00 00 00 100

4. 9.5 1750 1750 26.56 73.44

5. 4.75 4748 6498 98.63 1.37

6. 2.36 6 6504 98.72 1.28

7. 0.425 6 6510 98.82 1.18

8. 0.075 - - - -

Remarks: …………………………………………………………………………………

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUALGRADATION FOR GSB


(As per IS: 2386 Part I/MORTH Table 400-1)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….Stone Dust Test No……01


Location/Source: …LAB. SITE Date of Sampling: ...08-05-2014
Weight of Sample…1500g. Date of Testing: …08-05-2014
OBSERVATION SHEET

Sl. Sieve size Wt. Retained Cumulative Wt. % Cum. Wt. % Wt.
No. (mm) (gm) Retained Retained Passing
(gm)
1. 75 00 00 100
00
2. 53 00 00 00 100

3. 26.5 00 00 00 100

4. 9.5 00 00 00 100

5. 4.75 22 22 1.47 98.53

6. 2.36 356 378 25.2 74.8

7. 0.425 820 1198 79.87 20.13

8. 0.075 186 1384 92.27 7.73

Remarks: ……………………………………………………………………………………

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

INDIVIDUALGRADATION FOR GSB


(As per IS: 2386 Part I/MORTH Table 400-1)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….Stone Dust Test No……02


Location/Source: …LAB. SITE Date of Sampling: ...08-05-2014
Weight of Sample…1500g. Date of Testing: …08-05-2014
OBSERVATION SHEET

Sl. Sieve size Wt. Retained Cumulative Wt. % Cum. Wt. % Wt.
No. (mm) (gm) Retained Retained Passing
(gm)
1. 75 00 00 100
00

2. 53 00 00 00 100

3. 26.5 00 00 00 100
4. 9.5 00 00 00 100

5. 4.75 20 20 1.33 98.67

6. 2.36 262 282 18.8 81.2

7. 0.425 844 1126 75.07 24.93

8. 0.075 240 1366 91.07 8.93

Remarks: ………………………………………………………………………………

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

AVERAGE OF PERCENTAGE PASSING


(As per IS: 2386 Part I/MORTH Table 400-1)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….GSBTest No……02


Location/Source: …LAB. SITE Date of Sampling: .08-05-2014
Date of Testing: …08-05-2014

OBSERVATION SHEET

Sl. Sieve size


No. (mm) % Passing 40mm
% Passing 10mm % Passing Stone Dust
1. 75 100 100
100

2. 53 100 100 100

3. 26.5 42.18 100 100

4. 9.5 0.02 73.50 100


5. 4.75 - 1.12 98.6

6. 2.36 1.01 78.00

7. 0.425 0.94 22.53

8. 0.075 - 8.33

Remarks: ……………………………………………………………………………………………………..

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

JOB MIX FORMULA FOR GSB


(As per CA NO.CE (AF) SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No. : CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….GSBTrial No…..01


Location/Source: …LAB. SITE Date of Sampling: .08-05-2014
Date of Testing: …08-05-2014
Sieve size
(mm) ( 40 mm) ( 10 mm) ( stone dust ) ALL IN % LIMIT AS
Passing % 20% Passing % 30% Passing % 50% PASSING PER CA
75.00 100 20 100 30 100 50 100 100

53.00 100 20 100 30 100 50 100 100

26.5 42.18 8.44 100 30 100 50 88.44 70 - 100

9.5 0.02 0.004 73.50 22.05 100 50 72.05 50 - 80

4.75 - - 1.12 0.34 98.6 49.3 49.64 40 – 65

2.36 1.01 0.30 78.00 39.00 39.30 30 – 50

0.425 0.94 0.28 22.53 11.27 11.55 15 – 25

0.075 - - 8.33 4.17 4.17 3 - 10

Remarks: ……………………………………………………………………………………………………..

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

GRADATION FOR GSB


(As per IS: 2386 Part I/MORTH Table 400-1)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….GSB Test No…01


Location/Source: …PLANT SITE Date of Sampling: ...08-05-2014
Weight of Sample…10000 g. Date of Testing: …08-05-2014
BLENDINING PROPORTION

40mm20% 2000gm

10mm 30% 3000gm

Dust 50% 5000gm

Total Weight 10000gm


OBSERVATION SHEET

Sieve Wt. Cumulative Percentage Percentage Permissible


Size Retained Wt. Retained Retained Passing Limits
(mm) (gm) (gm) (%) (%) Grade-I Grade-II Grade-III

75.0 00 00 00 100 100 - -

53.0 00 00 00 100 80-100 100 -

26.5 1232 1232 12.32 87.68 55-90 70-100 100

9.50 1456 2688 26.88 73.12 35-65 50-80 65-95

4.75 2451 5139 51.39 48.61 25-55 40-65 50-80

2.36 965 6104 61.04 38.96 20-40 30-50 40-65

0.425 2844 8948 89.48 10.52 10-25 15-25 20-35

0.075 685 9633 96.33 3.67 3-10 3-10 3-10

Remarks: …………………………………………………………………………………

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

GRADATION FOR GSB


(As per IS: 2386 Part I/MORTH Table 400-1)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….GSB Test No…02


Location/Source: …PLANT SITE Date of Sampling: ...02-06-2014
Weight of Sample…10000 g. Date of Testing: …02-06-2014
BLENDINING PROPORTION

40mm 20% 2000gm

10mm 30% 3000gm

Dust 50% 5000gm

Total Weight 10000gm

OBSERVATION SHEET

Sieve Wt. Cumulative Percentage Percentage Permissible


Size Retained Wt. Retained Retained Passing Limits
(mm) (gm) (gm) (%) (%) Grade-I Grade-II Grade-III

75.0 00 00 00 100 100 - -

53.0 00 00 00 100 80-100 100 -

26.5 1120 1120 11.20 88.80 55-90 70-100 100

9.50 1204 2324 23.24 76.76 35-65 50-80 65-95

4.75 2804 5128 51.28 48.72 25-55 40-65 50-80

2.36 772 5900 59.00 41.00 20-40 30-50 40-65

0.425 3025 8925 89.25 10.75 10-25 15-25 20-35

0.075 690 9615 96.15 3.85 3-10 3-10 3-10

Remarks: …………………………………………………………………………………

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

MODIFIED PROCTOR DENSITY TEST


(As per IS: 2720 Part-VIII)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……..GSB Test No….……01


Location/Source: …….LAB Date of Sampling: ..20-05-2014
Volume of mould (V): .2250cc. Date of Testing: …...20-05-2014
Description 1 2 3 4 5 6
Water Added (%) 2 4 6 8 10 12

Wt. of Empty Mould =M1(gm) 6106 6106 6106 6106 6106 6106

Wt. of Mould + Compacted Material=M2(gm) 11384 11660 11830 11906 11934 11892
Wt. of Compacted sample M = M2- M1 (gm) 5276 5554 5724 5800 5828 5786
Volume of sample = V (cc) 2250 2250 2250 2250 2250 2250
Bulk Density of material γ = M/V ( gm/cc) 2.345 2.468 2.544 2.577 2.590 2.571
Container No. 04 05 22 24 16 23
Wt. of Container= W1(gm) 128.7 122.2 126.5 121.0 124.6 127.5
Wt. of Wet material + container = W2( gm) 355.8 321.1 351.7 387.3 392.3 401.3
Wt. of Oven Dry material + cont. = W3 ( gm) 350.9 313.5 340.1 367.5 366.6 370.1
Wt. of water W5= W2-W3 (gm 4.9 7.6 11.6 19.8 25.7 31.2
Wt. of Dry material W4= W3-W1 (gm) 222.2 191.3 213.6 246.5 242.0 242.6
Water Content, W % = W5/W4 *100 2.21 3.97 5.43 8.03 10.62 12.86
Dry density yd = γ X 100/(wc+100)gm/ cc 2.294 2.374 2.413 2.385 2.341 2.278

Dia of Weight of Height of Fall No. of blows No.of layers OMC(%) MDD(g/cc)
Mould(cm.) Rammer (kg.) (cm.)
15 4.89 450 55 5 6.0 2.412

Remarks: ………………………………………………………………………………

(Lab Engineer) Contractor’s Rep. J.E.(Civil) A.G.E/Engineer-In-Charge

C.B.R TEST
(As per IS: 2720 Part XVI)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: …GSBTest No….01


Location/Source: ..LAB SITEVolume of Mould (V): …2250cc.
Correction factor…7.064KgSoaking Period: ..96hrsDate of Casting: ...21-05-2014
M.D.D: …2.412 g/cc O.M.C: …6.0 %Date of Testing: ..25-05-2014

Before After Before After Before After


soaking soaking soaking soaking soaking soaking
Wt. of Mould + Wet Soil = W1 gm 12452 12464 12582 12590
Wt. of Mould = W2 gm 6706 6706 6802 6802
Wet of Wet Soil, W3 = W1 – W2 5746 5758 5780 5788
Bulk Density of Soil(Уd) = W3/V gm/cc 2.554 2.559 2.569 2.572
Container No. 06 05 17 04
Weight of Container = w1 gm 137.4 122.1 144.3 128.7
Wt. of wet soil + Container = w2 gm 415.8 362.4 380.5 402.0
Wt. of Oven dry soil + Container = w3 gm 395.8 347.2 365.7 384.3
Wt. of Water w1 = w2 –w3 gm 20.0 15.2 14.8 17.7
Wt. of Dry soil w = w3 –w1 gm 258.4 225.1 221.4 255.6

Water Content % = w1/w x 100 7.74 6.75 6.68 6.92


Dry Density 2.370 2.397 2.408 2.406
УdX 100 / (mc +100)gm/cc
Load Test: CBR = Pt / Ps X 100(Ps=1370kg at 2.5mm , Ps = 2055 kg at 5mm)
Mould No.
(mm)Penetration

Readings

kgLoad

Avg. CBR
Readings

Readings
kgLoad

kgLoad
CBR%

CBR%

CBR%

0.0 0.0 0.0 0.0 0.0 0.0


0.5 04 28.256 08 56.512
1.0 14 98.896 22 155.408
1.5 31 218.984 48 339.072
2.0 55 388.52 80 565.12
2.5 80 565.12 41.25 117 826.488 60.33 50.79
3.0 110 777.04 160 1130.24
4.0 180 1271.52 249 1758.94
5.0 255 1801.32 87.66 333 2352.31 114.47 101.06
7.5 460 3249.44 565 3991.16
10.0 670 4732.88 786 5552.30
12.5
Remark…................................................................................ CBR Value (%) = ..101.06 %

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

ATTERBERG LIMITS
(As per IS: 2720 Part-V)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Tested by…………. Date of Testing: ………..…….
OBSERVATION SHEET

LIQUID LIMIT
Particulars Sample 1 Sample 2 Sample 3 Sample 4
Number of Blows
Container No.
Wt. of Container= W1, g
Wt. of Wet soil +container =W2,g
Wt. of oven dry soil +container = W3,gm
Wt. of dry soil Ws=W3-W1, g
Wt. of Water Ww= W2-W3, g
Water Content(%) = Ww/Ws X 100
Average Liquid Limit(%)

PLASTIC LIMIT
Particulars Sample 1 Sample 2 Sample 3 Sample 4
Container No.
Wt. of Container= W1, g
Wt. of Wet soil +container =W2,g
Wt. of oven dry soil +container = W3,gm
Wt. of dry soil Ws=W3-W1, g

Wt. of Water Ww= W2-W3, g


Water Content % = Ww/Ws X 100
Average Plastic Limit(%)

RESULT: Liquid Limit=……….%, Plastic Limit=…………%, Plasticity Index=……………%

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

GRADATION FOR DAC(Grade 1st )


(As per IS 2386 Pt-1)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ….DAC Test No…01


Location/Source: …PLANT SITE Date of Sampling:
Weight of Sample….9475grm Date of Testing: 27-05-14
OBSERVATION SHEET

Sieve Wt. Cumulative Percentage Percentage PERMISSIBLE


Size Retained Wt. Retained Retained Passing LIMIT
(mm) (gm) (gm) (%) (%)

26.5 0 0 0 100 100

19 332 332 3.50 96.50 79-100

13.2 1856 2188 23.09 76.91 59-79

9.5 1136 3324 35.08 64.92 52-72

4.75 1616 4940 52.14 47.86 35-55

2.36 986 5926 62.54 37.46 28-44

1.18 1180 7106 74.99 25.00 20-34

0.600 596 7702 81.28 18.71 15-27

0.300 556 8258 87.15 12.84 10-20

0.150 394 8652 91.31 8.68 5-13

0.75 246 8898 93.91 6.09 2-8

Remarks: …………………………………………………………………………………
(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

GRADATION FOR DAC(Grade IInd)


(As per IS 2386 Pt-1)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: DAC Test No: 1


Location/Source: …PLANT SITE Date of Sampling: ...
Weight of Sample…. 9460grm Date of Testing: 30-05-14

OBSERVATION SHEET

Sieve Wt. Cumulative Percentage Percentage PERMISSIBLE


Size Retained Wt. Retained Retained Passing LIMIT
(mm) (gm) (gm) (%) (%)

19 0 0 0 100 100

13.2 1240 1240 13.11 86.89 79-100

9.5 650 1890 19.98 80.02 70-88

4.75 2278 4168 44.06 55.94 53-71

2.36 776 4944 52.26 47.74 42-58

1.18 1360 6304 66.64 33.36 34-48

0.600 708 7012 74.12 25.88 26-38

0.300 764 7776 82.20 17.80 18-28

0.150 518 8294 87.67 12.33 12-20

0.75 438 8732 92.30 7.70 4-7

Remarks: …………………………………………………………………………………

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge


COMBINED AGGREGATE GRADING FOR DBM
(As per MORTH TABLE 500-10)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ..DBM20mm-38%Dust-32.5%Test No….01


Location/Source: …LAB. 10mm -10%Lime-2% Date of Sampling: ...23-05-14
Weight of Sample…9550 g06mm - 13% VG-30- 4.5% Date of Testing: …23-05-14

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 37.5 00 00 00 100 100

2. 26.5 00 00 00 100 90-100

3. 19 692 692 7.25 92.75 71-95

4. 13.2 2418 3110 32.57 67.43 56-80

5. 4.75 2794 5904 61.82 38.18 38-54

6. 2.36 996 6900 72.25 27.75 28-42

7. 0.300 1710 8610 90.16 9.84 7-21

8. 0.075 662 9272 97.09 2.91 2-8

Remark-………………………………………………………………………………………………
(Lab Engineer)( Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

COMBINED AGGREGATE GRADING FOR PQC


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: .PQC Test No….01


Location/Source: .PLANT SITE Date of Sampling: .07-06-14
Weight of Sample…10000 gDateof Testing: .07-06-14
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 31.5 00 00 00 100 100

2. 26.5 356 356 3.56 96.44 85-95

3. 19 2280 2636 26.36 73.64 68-88

4. 9.5 1856 4492 44.92 55.08 45-65

5. 4.75 2354 6846 68.46 31.54 30-55

6. 600 micron 852 7698 76.98 23.02 8-30

7. 150 micron 2206 9904 99.04 0.96 5-15

8. 75 42 9946 99.46 0.54 0-5


micron

Remarks: ……………………………………………………………………………………………………..

(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge


MAXIMUM THEORETICALSPECIFIC GRAVITY OF MIX
(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: . Test No….


Location/Source: . Date of Sampling: .
Tested by……… Date of Testing: .

OBSERVATION

S.NO. Description Unit Trial

1 Weight of empty flask with cover w1 g


2 Weight of cover plate and flask filled g
with water D
3 Weight of flask with dry sample w2 g
4 Weight of dry sample in air g
A =w2-w1
5 Weight of flask ,cover plate, g
sample and water E
6 Maximum theoretical specific gravity of -
mix Gtm =A/[A+D-E]

Remarks: ………………………………………………………………………………………

(LAB ENGINEER) (CONTRACTOR’S REP.) J.E.(CIVIL) A.G.E (LAB)

MAXIMUM THEORETICALSPECIFIC GRAVITY OF MIX


(As per CA NO.CE(AF)SZ/PAN/18 OF 2013-14
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: . Test No….


Location/Source: . Date of Sampling: .
Tested by……… Date of Testing: .

OBSERVATION

S.NO. Description Unit Trial-I Trial-II

1 Weight of empty flask with cover w1 g


2 Weight of cover plate and flask filled g
with water D
3 Weight of flask with dry sample w2 g
4 Weight of dry sample in air g
A =w2-w1
5 Weight of flask ,cover plate, g
sample and water E
6 Maximum theoretical specific gravity of -
mix Gtm =A/[A+D-E]
7 AVERAGE -

Remarks: ………………………………………………………………………………………

(LAB ENGINEER) (CONTRACTOR’S REP.) J.E.(CIVIL) A.G.E (LAB)


COMBINED AGGREGATE GRADING FOR DBM (GRADE-I OF TRIAL -I)
(As per MORTH TABLE 500-10)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ..DBM 40mm -18% Dust- 35.5% Test No….01


Location/Source: …LAB. 20mm - 25% Lime-2% Date of Sampling: ...23-09-14
Weight of Sample…9550 g10mm - 15% VG-30- 4.5% Date of Testing: ……23-09-14

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 45 00 00 00 100 100

2. 37.5 00 00 00 100 95-100

3. 26.5 1172 1172 12.27 87.73 63-95

4. .13.2 2996 4168 43.64 56.36 55-75

5. 4.75 1690 5858 61.34 38.66 38-54

6. 2.36 624 6482 67.87 32.12 28-42

7. .300 2090 8572 89.76 10.24 7-21

8. .075 474 9046 94.72 5.27 2-8

Remark-………………………………………………………………………………………………

(Lab Engineer)( Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge


COMBINED AGGREGATE GRADING FOR DBM (GRADE-I OF TRIAL -II)
(As per MORTH TABLE 500-10)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ..DBM 40mm -23% Dust- 35.5% Test No….01


Location/Source: …LAB. 20mm - 20% Lime-2% Date of Sampling: ...23-09-14
Weight of Sample…9550 g10mm - 7.5% VG-30- 4.5% Date of Testing: ……23-09-14
06mm - 7.5

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 45 00 00 00 100 100

2. 37.5 00 00 00 100 95-100

3. 26.5 1526 1526 15.98 84.02 63-95

4. .13.2 2262 3788 39.66 60.34 55-75

5. 4.75 1800 5588 58.91 41.49 38-54

6. 2.36 806 6394 66.95 33.05 28-42

7. .300 2080 8474 88.73 11.27 7-21

8. .075 532 9006 94.30 5.70 2-8

Remark-………………………………………………………………………………………………

(Lab Engineer)( Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge


COMBINED AGGREGATE GRADING FOR DBM (GRADE-II OF TRIAL -I)
(As per MORTH TABLE 500-10)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ..DBM 40mm -10% Dust- 34.5% Test No….01


Location/Source: …LAB.20mm - 33% Lime-2% Date of Sampling: ...23-09-14
Weight of Sample…9550 g10mm - 16% VG-30- 4.5% Date of Testing: ……23-09-14

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 37.5 00 00 00 100 100

2. 26.5 550 550 5.76 94.24 90-100

3. 19.0 1356 1906 19.96 80.04 71-95

4. 13.2 1536 3442 36.04 63.96 56-80

5. 4.75 2478 5920 61.99 38.01 38-54

6. 2.36 664 6584 68.94 31.06 28-42

7. 0.300 2020 8604 90.09 9.91 7-21

8. 0.075 682 9286 97.23 2.77 2-8

Remark-………………………………………………………………………………………………

(Lab Engineer)( Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

COMBINED AGGREGATE GRADING FOR DBM (GRADE-II OF TRIAL -II)


(As per MORTH TABLE 500-10)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited

Type of Sample: ..DBM 40mm -10% Dust- 34.5% Test No….01


Location/Source: …LAB.20mm - 33% Lime-2% Date of Sampling: ...23-09-14
Weight of Sample…9550 g10mm - 8% VG-30- 4.5% Date of Testing: ……23-09-14
06mm – 8%

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 37.5 00 00 00 100 100

2. 26.5 650 650 6.80 93.19 90-100

3. 19.0 1434 2084 21.82 78.17 71-95

4. 13.2 1630 3714 38.82 61.10 56-80

5. 4.75 2174 5888 61.65 38.34 38-54

6. 2.36 814 6702 70.17 29.82 28-42

7. 0.300 2010 8712 91.22 8.77 7-21

8. 0.075 486 9198 96.31 3.68 2-8

Remark-………………………………………………………………………………………………

(Lab Engineer)( Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge

COMBINED AGGREGATE GRADING FOR DBM


(As per MORTH TABLE 500-10)

Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh


Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited
Type of Sample: ..DBM 20mm -21.97% Dust- 28.65% Test No….01
Location/Source: …LAB.10mm -22.92% Lime-1.91%Date of Sampling: ...24-10-14
Weight of Sample…9550 g06mm - 20.05% VG-30- 4.5%Date of Testing: …24-10-14

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 37.5 00 00 00 100 100

2. 26.5 00 00 00 100 90-100

3. 19.0 730 730 7.64 92.36 71-95

4. 13.2 1713 2443 25.58 74.42 56-80

5. 4.75 2834 5277 55.26 44.74 38-54

6. 2.36 1202 6479 67.84 32.16 28-42

7. 0.300 1763 8242 86.30 13.70 7-21

8. 0.075 1010 9252 96.88 3.12 2-8

Remark-………………………………………………………………………………………………

Lab EngineerContractor’s Rep. J.E.(Civil) A.G.E LAB


BULK DENSITY OF AGGREGATE
(As per IS: 2386 Part-III)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …10mmTest No….……


Location/Source:……KABRAI .Date of Sampling: ...23.04.16
S. No. Details Unit Trial 1 Trial 2 Average
Bulk Density
(Kg/l)
1 Wt. of Empty density measure(W1) Kg 9.03 9.03

2 Wt. of material + density measure (W2) Kg 31.245 31.450

3 Wt. of material W= W2-W1 Kg 22.215 22.420

4 Volume of density measure (V) lit 15.00 15.00

5 Bulk density W/ V Kg / lit 1.481 1.495 1.488

Date of Testing: … 23.04.16

OBSERVATION SHEET

Remarks: ……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

BULK DENSITY OF AGGREGATE


(As per IS: 2386 Part-III)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …20mmTest No….……


Location/Source:……KABRAI.Date of Sampling: ...23.04.16
S. No. Details Unit Trial 1 Trial 2 Average
Bulk Density
(Kg/l)
1 Wt. of Empty density measure(W1) Kg 9.03 9.03

2 Wt. of material + density measure (W2) Kg 31.505 31.515

3 Wt. of material W= W2-W1 Kg 22.475 22.485

4 Volume of density measure (V) lit 15.00 15.00

5 Bulk density W/ V Kg / lit 1.498 1.499 1.498

Date of Testing: … 23.04.16

OBSERVATION SHEET

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


BULK DENSITY OF AGGREGATE
(As per IS: 2386 Part-III)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …26.5mmTest No….……


Location/Source:……KABRAI.Date of Sampling: ...23.04.16
S. No. Details Unit Trial 1 Trial 2 Average
Bulk Density
(Kg/l)
1 Wt. of Empty density measure(W1) Kg 9.03 9.03

2 Wt. of material + density measure (W2) Kg 31.640 31.690

3 Wt. of material W= W2-W1 Kg 22.610 22.660

4 Volume of density measure (V) lit 15.00 15.00

5 Bulk density W/ V Kg / lit 1.507 1.511 1.509

Date of Testing: … 23.04.16

OBSERVATION SHEET

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


SPECIFIC GRAVITY&WATER ABSORPTION OF COARSE AGGREGATES
(As per IS 2386 Part-III)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …26.5MMTest No……….. Location/Source: …KABRAI


Date of Sampling: ...21.04.16
Date of Testing: …22.04.16
OBSERVATION SHEET
S. No. Details Unit Trial 1 Trial 2 Average

1 Wt. of sample in water(W1) gm 1735.5

2 Wt. of empty basket in water (W2) gm 00

3 Wt. of saturated surface dry gm 2788.5


sample(W3)

4 Wt. of oven dried sample(W4) gm 2788

5 Specific Gravity = 2.647 2.647


W4 / W3 – (W1-W2)

6 Water Absorption = % 0.05 0.05

W3- W4 / W4 X100

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


SPECIFIC GRAVITY&WATER ABSORPTION OF COARSE AGGREGATES
(As per IS 2386 Part-III)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …20MMTest No……….. Location/Source: …KABRAI


Date of Sampling: ...21.04.16
Date of Testing: …22.04.16
OBSERVATION SHEET
S. No. Details Unit Trial 1 Trial 2 Average

1 Wt. of sample in water(W1) gm 1401.5

2 Wt. of empty basket in water (W2) gm 00

3 Wt. of saturated surface dry gm 2249.5


sample(W3)

4 Wt. of oven dried sample(W4) gm 2248

5 Specific Gravity = 2.651 2.651


W4 / W3 – (W1-W2)

6 Water Absorption = % 0.07 0.07

W3- W4 / W4 X100

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


SPECIFIC GRAVITY&WATER ABSORPTION OF COARSE AGGREGATES
(As per IS 2386 Part-III)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …10MMTest No……….. Location/Source: …KABRAI


Date of Sampling: ...21.04.16
Date of Testing: …22.04.16
OBSERVATION SHEET
S. No. Details Unit Trial 1 Trial 2 Average

1 Wt. of sample in water(W1) gm 667

2 Wt. of empty basket in water (W2) gm 00

3 Wt. of saturated surface dry gm 1046.


sample(W3)

4 Wt. of oven dried sample(W4) gm 1044.5

5 Specific Gravity = 2.752 2.752


W4 / W3 – (W1-W2)

6 Water Absorption = % 0.19 0.19

W3- W4 / W4 X100

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

BULK DENSITY OF SAND


Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: …Natural sand Test No….…… Location/Source:


…………….. Date of Sampling: ...01.05.16
Date of Testing: …01.05.16

OBSERVATION
Height of calibrating Cylinder = 15 cm.
Diameter of calibrating Cylinder = 10 cm.
Volume of calibrating Cylinder V =π D 2 H / 4
= (3.14x10x10x15)/4
= 1177.5 cm3
Determination of Sand Weight in Cone
S.No. Description Unit Trial-1 Trial-2
1 Wt. of pouring Sand g 6500 6500
with Cylinder (w1)
2 Wt. of Sand & Cylinder after Pouring of g 6144 6148
Sand on plane surface (w2)
3 Wt. of Sand in Cone W= (w1-w2) g 356 352

4 Average Wt. of Sand in Cone (w3) g 354

DETERMINATION BULK DENSITY OF SAND


S.No. Description Unit Trial-1 Trial-2
1 Wt. of pouringSand with cylinder(w1) g 6500 6500

2 Wt. of Cylinder and Sand after Filling g 4556 4560


caibratingCylinder(w4)
3 Wt. of Sand Filling Calibrating Cylinder g 1944 1940
and cone w5=(w1-w4-w3)
4 Wt. of Sand in cone (w3) g 354 354

5 Wt. of Sand Filling Calibrating g 1590 1586


Cylinderw6=(w5-w3)
6 Volume of Calibrating Cylinder(V) Cm3 1177.5 1177.5

7 Bulk Density of Sand =w6/V g/cc 1.35 1.347

8 Average Bulk density of Sand g/cc 1.349

Remark ………………………………………………………………………………………………….

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


GRADATION FOR SOIL STABILISATION WITH CEMENT
(As per MORTH Table 400-4)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Weight of Sample……………. Date of Testing: ………..……
OBSERVATION SHEET

Sieve Wt. Cumulative Percentage Percentage Permissible


Size Retained Wt. Retained Retained Passing Limits
(mm) (gm) (gm) (%) (%)

75.0

53.0

26.5

9.50

4.75

2.36

0.425

0.075

Remarks: ……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
DEGREE OF PULVERISATION
Name of work : Re-surfacing / Strengthening of Runway at AF Station Chakeri, Kanpur
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016  
Name of the Contractor : PNC Infratech Limited  
Client : Military Engineer Services  
Type of Sample: ……. Test No….……
Location/Source: …………….. Date of Testing: ………
   

A On IS Sieve 26.5 mm Unit Detail

i Sample of pulverized soil ( W1) g 1000

ii Wt. of Sample Retained on 26.5mm sieve (W2) g  

iii Wt. of sample Retained after pulverization 26.5mm sieve (W3) g  

iv Degree of pulverisation - (w1-w2)/ (w1-w3) *100 %  

v Permissible Limit *minimum) by Wt. % 100

B On IS Sieve 5.6mm Unit  

i Sample of pulverized soil ( W1) g 1000

ii Wt. of Sample Retained on 5.6mm sieve (W2) g  

iii Wt. of sample Retained after pulverisation 5.6mm sieve (W3) g  

iv Degree of pulverisation - (w1-w2)/ (w1-w3) *100 %  

v Permissible Limit *minimum) by Wt. % 80

Remark : ………………………………………………………………………………..  
   
   
   
   
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
       
SIEVE ANALYSIS FOR 31.5 MM AGGREGATE
(As per IS: 383)

Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, K ANPUR


Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services

Type of Sample: ……………… Test No………..


Location/Source: …………….. Date of Sampling: ...……….....
Wt. of sample……………. Date of Testing: ………..……

OBSERVATION TABLE

Sr. Wt. Cumulative Percentage Percentage Permissible


No. retained (gm) wt. retained Cumulative wt. passing Limits
(gm) wt. retained (%) (%)
(%)

1 31.5 100

2 26.5 85-100

3 20 0-30

4 10 0-5

Remarks: ……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE