Ductility Test (After Tfot) : (As Per IS: 1208)
Ductility Test (After Tfot) : (As Per IS: 1208)
Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORK SERVICES AT AF STATION JAMNAGAR GUJARAT
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC Buildcon Pvt Ltd
Client : Military Engineer Services
_____________________________________________________________________________
Room Temperature : .……ºC
Period of Cooling in Water Bath (After Trimming) : ……..min (85 min - 95 min)
OBSERVATION TABLE
1 Ductility
(in cm)
Remarks: ……………………………………………………………………………………………………..
OBSERVATION TABLE
Remarks: ……………………………………………………………………………………………………..
OBSERVATION TABLE
1 Ball No.-1
2 Ball No.- 2
Remarks: ……………………………………………………………………………………………………..
Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STATION JAMNAGAR
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : M/S. KCC BUILDCON PVT LTD
Client : Military Engineer Services
OBSERVATION TABLE
FLASH POINT
(º C)
FIRE POINT
(º C)
Remarks: ……………………………………………………………………………………………………..
OBSERVATION TABLE
Specimen I Specimen II
46 30-50
1.
2. 43
44
3.
44.3
Average Penetration
Remarks: …………………………………………………………………………………………………….
GE(P)AF CHAKERI
OBSERVATION TABLE
Specimen I Specimen II
1.
2.
3.
Reduction
Average Penetration र
35% MAX.
AT 25 oC
Remarks: …………………………………………………………………………………………………….
OBSERVATION SHEET
Softening point, oC
Average
Remarks: …………………………………………………………………………………………………….
Softening point, oC
Average
Remarks: …………………………………………………………………………………………………….
S.
No.
Description Specimen-I Specimen-II
1. Mass of Specific gravity Bottle (a),gm
Remarks: …………………………………………………………………………
S.
No.
Description Specimen-I Specimen-II
Test : Piece of glass grid is put to flame till all organic content burnt.
Remarks: …………………………………………………………………………
OBSERVATION TABLE
Remarks: …………………………………………………………………………………………
II 50% MIN.
AT 25 oC
III
Remarks: …………………………………………………………………………………….
OBSERVATION TABLE
Difference/ Separation, oC
3 ºC MAX
Remarks: …………………………………………………………………………….
OBSERVATION SHEET
Softening point, oC
Difference/ Separation, oC
Elapsed time, Ball I Ball II
(minutes) Temperature, Temperature,
o o
C C
Remarks: …………………………………………………………………………………….
Binder Content:
Sieve Size Wt. Retained Cumulative Wt. Percentage Percentage Permissible Limits
(mm) (gm) Retained (gm) Retaining (%) Passing (%)
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
OBSERVATION
SL
No. Description Unit Observation
9 Bitumen % = W1-(W2+W3)/W1x100 %
11 Average of Bitumen %
12 Permissible limit %
Remarks: ……………………………………………………………………………………
Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORK SERVICES AT AF STATION JAMNAGAR
GUJARAT
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC Buildcon Pvt Ltd
Client : Military Engineer Services
OBSERVATION TABLE
Remarks: ……………………………………………………………………………………………………..
OBSERVATION TABLE
2 Area of Plate A m2
Remarks: …………………………………………………………………………………………
OBSERVATION TABLE
OBSERVATION TABLE
Remarks: ………………………………………………………………………………………
OBSERVATION TABLE
OBSERVATION TABLE
S.
No. Test No. 1 2 Permissible
Limit
Remarks: ……………………………………………………………………………………………
OBSERVATION TABLE
Remarks: …………………………………………………………………………………………
Remarks: …………………………………………………………………………………………
OBSERVATION TABLE
S.No. DESCRIPTION UNIT DETAIL
5 Permissible Limit %
Remarks: …………………………………………………………………………………………
Remarks: ……………………………………………………………………………………………………..
MOISTURE CONTENT
(As per IS: 2720 Part-II)
OBSERVATION TABLE
Remarks: ………………………………………………………………
7 16 12.5
8 12.5 10
9 10 6.3
TOTAL
(A) FLAKINESS INDEX (F.I ) = Total wt.of flaky material x 100 = ……………...….%
Total wt. Sample
(B) ELONGATION INDEX (E.I) = Total wt.of Elongation material x 100 = …..………...…. %
Total wt.ofnon flaky material
1 63 100
2 40 85-100
3 20 0-20
4 10 0-5
Remarks: ……………………………………………………………………………………………………..
1 40 100
2 20 85-100
3 10 0-20
4 4.75 0-5
Remarks: ……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
OBSERVATION TABLE
16 100
12.5 85-100
10 0-45
4.75 0-10
Remarks: ……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STATION JAMNAGAR
GUJARAT
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC BUILDCON PVT LTD
Client : Military Engineer Services
OBSERVATION TABLE
1 12.5 100
2 10 85-100
3 4.75 0-20
4 2.36 0-5
Remarks: ……………………………………………………………………………………………………..
OBSERVATION TABLE
1 31.5 100
2 26.5 85-100
3 20 0-30
4 10 0-5
Remarks: ……………………………………………………………………………………………………..
OBSERVATION TABLE
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (Zone –II)
(%)
1. 10 100
2. 4.75 90-100
3. 2.36 75-100
4. 1.18 55-90
5. 0.600 35-59
6. 0.300 8-30
7. 0.150 0-10
Remarks: ………………………………………………………………………………………
OBSERVATION TABLE
Remarks: ………………………………………………………………………………………
Sr. Initial reading Volume of settled sample % age of Silt - Max. limit
No. After 3hrs (L2/L1) X 100 (%)
1 100
2 100
Remarks: ……………………………………………………………………………………………………..
OBSERVATION TABLE
Description Trial 1 Trial 2
Sand reading, A
Clay reading, B
Permissible Limit
Remarks: …………………………………………………………………………………………
53.0 100
37.5 95-100
19.0 45-100
9.50 35-100
4.75 25-100
0.600 8-65
0.300 5-40
0.075 0-10
Remarks: ……………………………………………………………………………..
53 100
45 95-100
22.4 60-80
11.2 40-60
4.75 25-40
2.36 15-30
0.6 8-22
.
0.075 0-8
Remarks: ……………………………………………………………………………………………………..
OBSERVATION TABLE
Sieve Size Wt. Retained Cumulative Wt. Percentage Percentage Permissible
(mm) (gm) Retained (gm) Retained Passing Limits
(%) (%)
53.0 100
37.5 95-100
19.0 45-100
9.5 35-100
4.75 25-100
0.600 08-65
0.300 05-40
0.075 0-10
Remarks: ………………………………………………………………………………………..
Sl. No. SSD wt of Sample (A) Oven Dry wt of Sample Water Absorption Average Permissible
(B) (A-B)/B x100 Limits
1 Max. %
2
……MM AGGREGATE
Sl. No. SSD wt of Sample (A) Oven Dry wt of Sample Water Absorption Average Permissible
(B) (A-B)/B x100 Limits
1 Max. %
2
……MM AGGREGATE
Sl. No. SSD wt of Sample (A) Oven Dry wt of Sample Water Absorption Average Permissible
(B) (A-B)/B x100 Limits
1 Max. %
2
STONE DUST
Sl. No. SSD wt of Sample (A) Oven Dry wt of Sample Water Absorption Average Permissible
(B) (A-B)/B x100 Limits
1 Max. %
2
Remarks: ……………………………………………………………………………………………………..
Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits
1 Max. %
2
10.00MM AGGREGATE
Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits
1 Max. %
2
6.00MM AGGREGATE
Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits
1 Max. %
2
SAND
Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits
1 Max. %
2
Remarks: ……………………………………………………………………………………………………..
OBSERVATION TABLE
1 45 100
2 37.5 95-100
3 26.5 63-93
4 13.2 55-75
5 4.75 38-54
6 2.36 28-42
7 0.300 7-21
8 0.075 2-8
Remarks: ……………………………………………………………………………………
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
1 37.5 100
2 26.5 90-100
3 19.0 71-95
4 13.2 56-80
5 4.75 38-54
6 2.36 28-42
7 0.300 7-21
8 0.075 2-8
Remarks: ……………………………………………………………………………………
26.5
100
19.0
90 - 100
13.2
59 - 79
9.5
52 - 72
4.75
35 - 55
2.36
28 - 44
1.18
20 - 34
0.600
15 - 27
0.300
10 - 20
0.150
5 - 13
0.075
2-8
Remarks: …………………………………………………………………………………
13.2 90 - 100
9.5 70 - 88
4.75 53 - 71
2.36 42 - 58
1.18 34 - 48
0.600 26 - 38
0.300 18 - 28
0.150 12 - 20
0.075 4 -10
Remarks: …………………………………………………………………………………
1 26.5 100
2 19.0 90-100
3 13.2 56-88
4 4.75 16-36
5 2.36 4-19
6 0.300 2-10
7 0.075 0-8
Remarks: ……………………………………………………………………………………
OBSERVATION TABLE
9.5 90 - 100
4.75 35 - 51
2.36 24 - 39
1.18 15 - 30
0.300 9 - 19
0.075 3-8
Remarks: …………………………………………………………………………………
S.
No. Test No. 1 2 Permissible
Limit
(%)
1 Mass of Aggregate(Oven Dry) Passing 12.5 mm IS Sieve
and Retained on 10 mm IS Sieve (Wa) (gm)
Remarks: ……………………………………………………………………………………………………..
OBSERVATION TABLE
Weight of Sample, W1 gm
LIMITS:
Remarks: ……………………………………………………………………………………
OBSERVATION TABLE
Sample No. Force Applied in KN Total wt. of dry Material passing % Fines
(X) Sample 2.36 mm sieve
Average % fines (Y)
Remarks: ……………………………………………………………………………………………………..
Remarks: ………………………………………………………………………………………………
Remarks: ………………………………………………………………………………………..
Name of work : RE-SURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STATION JAMNAGAR
GUJARAT
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC BUILDCON PVT LTD
Client : Military Engineer Services
Type of Sample: …………….… Test No………..
Location/Source: …………….. Date of Sampling: ...………....
Date of Testing: ………..……
OBSERVATION TABLE
S. No. Details Unit Trial 1 Trial 2 Average
1 Sample in water(W1) gm
Remarks: ……………………………………………………………………………………………………..
7 Average
8 Permissible limit
Remarks: ……………………………………………………………………………………………………..
GE (P) Chakeri
GE (P) Chakeri
Remarks: ……………………………………………………………………………………………………..
Remarks: ……………………………………………………………………………………………………..
ATTERBERG LIMITS
(As per IS: 2720 Part-V)
RESULT: Liquid Limit =…..…….%, Plastic Limit =…….……%, Plasticity Index =…….………%
Remarks: ………………………………………………………………………………………………
Description 1 2 3 4 5 6
Water Added (%)
Wt. of Mould = M1
Wt. of Mould + Compacted Material(M2gm)
Wt. of Compacted sample (M= M2- M1gm)
Volume of sample = V
Bulk Density of material γ= M/V gm/cc
Container No.
Wt. of Container= W1gm
Wt. of Wet material + container = W2 gm
Wt. of Oven Dry material + cont. = W3 gm
Wt. of water W4= W2-W3 gm
Wt. of Dry material W5= W3-W1gm
Dia of Weight of Height of Fall No. of blows No.of layers OMC(%) MDD(g/cc)
Mould(cm.) Rammer (kg.) (cm.)
15 / 10 4.89 45 55 / 25 5
Remarks: …………………………………………………………………………………………
75
19
4.75
2.00
0.425
0.075
Remarks: ……………………………………………………………………………………………………..
sReading
kgLoad
CBR%
sReading
kgLoad
sReading
kgLoad
CBR%
CBR%
CBR%
Avg.
0.0
0.5
1.0
1.5
2.0
2.5
3.0
4.0
5.0
7.5
10.0
12.5
Remark…......................................................................................CBR Value (%) = …………..
OBSERVATION SHEET
Sample No.
S. No. Description
1 2
Remarks: ……………………………………………………………………………………………………..
CEMENT
(As per IS: 4031 Part I)
OBSERVATION TABLE
Name of work : RESURFACING OF RUNWAY AND ALLIED WORKS SERVICES AT AF STATION , JAMNAGAR
Contract Agreement No : CE(AF)G/JAM/39 OF 2018-2019
Name of the Contractor : KCC BUILDCON Pvt Limited
Client : Military Engineer Services
OBSERVATION TABLE
5 Compressive Strength
3 days Strength N/mm2 23 N/mm2
Date (MPa)
Remarks: ………………………………………………………………………………………….
2.
3.
4.
5.
6.
7.
8.
9.
Remarks: …………………………………………………………………………………………………….
OBSERVATION SHEET
S. Wt. of Volume Density Area of Load
No. Specimen of (g/cc) specimen (KN) Compressive Avg. Permissi
(g) specimen (mm2) strength strength ble
(cc) Limit
(N/mm2) (N/mm2)
(N/mm2)
1.
2.
3.
4.
5.
6.
7.
8.
9.
Remarks: …………………………………………………………………………………………………….
OBSERVATION SHEET
S. Wt. of Volume Density Area of Load
No. Specimen of (g/cc) specimen (KN) Compressive Avg. Permissi
(g) specimen (mm2) strength strength ble
(cc) Limit
(N/mm2) (N/mm2)
(N/mm2)
1.
2.
3.
4.
5.
6.
7.
8.
9.
Remarks: …………………………………………………………………………………………………….
1 37 100
90-100
2 31
3 26.5 85-95
4 19.0 68-88
5 9.5 45-65
6 4.75 30-55
9 75micron 0-2
Remarks: ………………………………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 100
2. 45.00 95-100
3. 22.4 60-80
4. 11.2 40-60
5. 4.75 25-40
6. 2.36 15-30
7. 600 6-18
micron
8. 75 4-8
micron
Remarks: ……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1 26.5
100
2 19.0 75-95
3 9.5 50-70
4 4.75 30-55
5 2.36 17-42
9 0-10
75 micron
Remarks: …………………………………………………………………………………………
OBSERVATION SHEET
2
Weight of sample Passing Seive 20.00 mm & Retained
on 12.5 mm 67% of Sample weight (g)
Remarks: ……………………………………………………………………………………………
1
Total Sample weight (W1) (g)
2
Weight of sample Passing Seive 40.00 mm & Retained
on 25 mm 67% of Sample weight (g)
Permissible Limit %
6 12% MAX. 18% MAX.
Remarks: ……………………………………………………………………………………………
2
Weight of sample Passing Seive 40.00 mm &
Retained on 25 mm 67% of Sample weight (g)
Permissible Limit %
6 12% MAX. 18% MAX.
Remarks: ……………………………………………………………………………………………
2
Weight of sample Passing Seive 10 mm & Retained
on 4.75 mm 100% of Total Sample weight (g)
Remarks: ……………………………………………………………………………………………
Na2SO4 MgSO4
1 Weight of sample Passing Seive 10.00
mm & Retained on 4.75 mm (100gm )
8
Soundness of Aggregate in Sodium
Sulphate
12% Max
9
Soundness of Aggregate in Magnesium 18 % Max
Sulphate
Remark ………………………………………………………………………………………………….
OBSERVATION
Height of calibrating Cylinder = cm.
Diameter of calibrating Cylinder = cm.
Volume of calibrating Cylinder V =π D 2 H / 4
Remark ………………………………………………………………………………………………….
OBSERVATION
Height of calibrating Cylinder = cm.
Diameter of calibrating Cylinder = cm.
Volume of calibrating Cylinder V =π D ² H /4
Remark ………………………………………………………………………………………………….
\
SOUNDNESS TEST for 6 mm
Name of work : RE-SURFACING / STRENGTHENING OF RUNWAY AT AF STATION CHAKERI, KANPUR
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services
OBSERVATION SHEET
6.
Soundness of Aggregate in Sodium 12% Max
Sulphate
7
Soundness of Aggregate in Magnesium 18 % Max
Sulphate
Remark ………………………………………………………………………………………………….
Remarks: …………………………………………………………………………………
OBSERVATION SHEET
Remarks: …………………………………………………………………………………
75.0 100 - -
Remarks: …………………………………………………………………………………
DESIGN MIX OF
WET MIX MACADAM
Name of work: Resurfacing of Runway and Allied Works at
AFS Panagarh
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100
5. 4.75 25-40
6. 2.36 15-30
7. 600 8-22
micron
8. 75 0-8
micron
Remarks: …………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100
5. 4.75 25-40
6. 2.36 15-30
7. 600 8-22
micron
8. 75 0-8
micron
Remarks: ……………………………………………………………………………………………………..
6. 2.36 15-30
7. 600 8-22
micron
8. 75 0-8
micron
Remarks: ……………………………………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100
6. 2.36 15-30
7. 600 8-22
micron
8. 75 0-8
micron
Remarks: ……………………………………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100
8. 75 0-8
micron
Remarks: ……………………………………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100
8. 75 0-8
micron
Remarks: ……………………………………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100
Remarks: ……………………………………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 53.00 00 00 00 100 100
8 75 7.46
micron
Remarks: ……………………………………………………………………………………………………..
(Lab Engineer)(Contractor’s Rep.)(J.E.(Civil) (A.G.E/Engineer-In-Charge)
Sieve
size ( 40 mm) ( 20 mm) ( 10 mm) ( stone dust ) ALL LIMIT AS
(mm) IN % PER CA
PASSI
NG
Passing 25% Passing 25% Passing 20% Passing 30%
% % % %
53.00 100 25 100 25 100 20 100 30 100 100
11.2 0.14 0.04 6.44 1.61 99.26 19.85 100 30 51.5 40-60
11.2 0.14 0.04 6.44 1.29 99.26 19.85 100 30 51.18 40-60
2
40 mm 25% 2500 g.
20 mm 25%2500 g.
10 mm 20% 2000 g.
Stone dust 30% 3000 g.
Total sample wt. .10000g.
Remarks: ……………………………………………………………………………………………………..
40 mm 30% 3000g.
20 mm 20% 2000 g.
10 mm 20% 2000 g.
Stone dust 30% 3000 g.
Total sample wt. .10000g.
Remarks: ……………………………………………………………………………………………………..
Remarks: ………………………………………………………………………………………
Weight of fraction passing 1.70 mm I.S. Sieve, W3= W1-W2 1470 1506
14.88
Average of Los Angeles Abrasion Value %
LIMITS -
Specified WMM DLC M-25 PQC DBM DAC
limits
(%) 35 35 35 35 30
Remarks: …………………………………………………………………………………………
Wt. of Empty Mould =M1(gm) 6106 6106 6106 6106 6106 6106
Wt. of Mould + Compacted Material=M2(gm) 11478 11664 11844 12098 12002 11982
Wt. of Compacted sample M= M2- M1 (gm) 5372 5558 5738 5902 5896 5876
Volume of sample = V (cc) 2250 2250 2250 2250 2250 2250
Bulk Density of material γ = M/V ( gm/cc) 2.388 2.470 2.550 2.623 2.620 2.612
Container No. 19 03 20 06 21 04
Wt. of Container= W1(gm) 150.7 160.7 158.1 137.4 159.1 128.7
Wt. of Wet material + container = W2( gm) 408.7 391.7 394.4 365.6 415.6 331.6
Wt. of Oven Dry material + cont. = W3 ( gm) 398.4 381.0 381.5 351.8 399.9 317.1
Wt. of Dry material W4= W3-W1 (gm) 247.7 220.3 223.4 214.4 240.8 188.4
Wt. of water W5= W2-W3 (gm) 10.3 10.7 12.9 13.8 15.7 14.5
Water Content, W % = W5/W4 *100 4.16 4.86 5.57 6.44 6.52 7.70
Dry density yd = γ X 100/(wc+100)gm/ cc 2.293 2.356 2.415 2.464 2.460 2.425
Dia of Weight of Height of Fall No. of blows No.of layers OMC(%) MDD(g/cc)
Mould(cm.) Rammer (kg.) (cm.)
15 4.89 450 55 5 6.5 2.455
Remarks: ……………………………………………………………………………………………….……
2996 2996
1 12.50mm Passing 10.00mm Retained dry wt. of sample
(W1) gm
2504 2520
2 Wt. Of Aggregate retained 2.36 mm IS Sieve (W2) gm
492 476
3 Wt. of Aggregate Passing 2.36MM IS Sieve after test
(W3) gm = (W1-W2)
16.42 15.89
4 Crushing Value % =(W3/W1)x100
16.16
5 Average Crushing Value (%)
Remarks: ……………………………………………………………………………………………………..
OBSERVATION SHEET
S. No.
Test No. 1 2 Permissible
Limit
(%)
1 Mass of Aggregate(Oven Dry) Passing 12.5 mm IS 356 356
Sieve and Retained on 10 mm IS Sieve (Wa) (gm)
Remarks: ………………………………………………………………………………………
Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits
20.00MM AGGREGATE
Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits
10.00MM AGGREGATE
Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits
STONE DUST
Sl. No. Wt. of SSD Sample Wt. of Oven Dry Water Absorption Average Permissible
(A) Sample (B) (A-B)/B x100 Limits
Remarks: ……………………………………………………………………………………………………..
ATTERBERG LIMITS
(As per IS: 2720 Part-V)
LIQUID LIMIT
Particulars Sample 1 Sample 2 Sample 3 Sample 4
Number of Blows
Container No.
Wt. of Container= W1, g
Wt. of Wet soil +container =W2,g
Wt. of oven dry soil +container = W3,gm
Wt. of dry soil Ws=W3-W1, g
Wt. of Water Ww= W2-W3, g
Water Content(%) = Ww/Ws X 100
Average Liquid Limit(%)
PLASTIC LIMIT
Particulars Sample 1 Sample 2 Sample 3 Sample 4
Container No.
Wt. of Container= W1, g
Wt. of Wet soil +container =W2,g
Wt. of oven dry soil +container = W3,gm
Wt. of dry soil Ws=W3-W1, g
5. 600 10-35
micron
6. 75 0-5
micron
Remarks: ……………………………………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100
2. 19 1872 1872 18.71 81.29 80-100
5. 600 10-35
micron
6. 75 0-5
micron
Remarks: ……………………………………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100
2. 19 00 00 00 100 80-100
6. 75 0-5
micron
Remarks: ……………………………………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100
2. 19 00 00 00 100 80-100
6. 75 0-5
micron
Remarks: ……………………………………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100
2. 19 00 00 00 100 80-100
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100
2. 19 00 00 00 100 80-100
Remarks: ……………………………………………………………………………………………………..
(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge
OBSERVATION SHEET
6. 75 1.1
micron
Remarks: ……………………………………………………………………………………………………..
…
Remarks: ………………………………………………………………………………….
Remarks: ……………………………………………………………………………..
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 26.5 00 00 00 100 100
USE OF MATERIAL:
QUANTITY OF MATERIAL:
COARSE AGG.:
= 1292.593 Kg = 1292.6 Kg
FINE AGG.:
V = [W + C/SG +(1/1-P)*Ca/SG]*1/1000
= 773.154 Kg
COMPRESSIVE STRENGTH OF CONCRETE
(As per IS: 516)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited
OBSERVATION SHEET
Remarks: …………………………………………………………………………………………………….
OBSERVATION SHEET
Remarks: …………………………………………………………………………………………………….
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 31.5 100
2. 26.5 85-95
3. 19 68-88
4. 9.5 45-65
5. 4.75 30-55
8. 75 0-5
micron
Remarks: ……………………………………………………………………………………………………..
OBSERVATION SHEET
S. Wt. of Volume of Density Area of Load (KN)
No. Specimen specimen (gm/cc) specimen Compressive Avg.
(gm) (cc) (mm2) strength strength
(N/mm2) (N/mm2)
Grade/Type of Concrete: …PQC WITH ULTRATECH CEMENT OPC-43GRADE Test No: …01
Location/Source: ..LAB TEST FOR DESIGN MIX Date of Casting..11-05-2014
Age of Testing…..07 DAYS Date of Testing..18-05-2014
OBSERVATION SHEET
(N/mm2) (N/mm2)
Remarks: …………………………………………………………………………………………………….
Remarks: …………………………………………………………………………
Sl. Sieve size Wt. Retained Cumulative Wt. % Cum. Wt. %Wt.
No. (mm) (gm) Retained Retained Passing
(gm)
1. 75 00 00 100
00
2. 53 00 00 00 100
5. 4.75 - - - -
6. 2.36
7. 0.425
8. 0.075
Remarks: …………………………………………………………………………
2. 53
3. 26.5
4. 9.5
5. 4.75
6. 2.36
7. 0.425
8. 0.075
Remarks: ………………………………………………………………………………
2. 53 00 00 00 100
3. 26.5 00 00 00 100
8. 0.075 - - - -
Remarks: ……………………………………………………………………………………
2. 53 00 00 00 100
3. 26.5 00 00 00 100
8. 0.075 - - - -
Remarks: …………………………………………………………………………………
Sl. Sieve size Wt. Retained Cumulative Wt. % Cum. Wt. % Wt.
No. (mm) (gm) Retained Retained Passing
(gm)
1. 75 00 00 100
00
2. 53 00 00 00 100
3. 26.5 00 00 00 100
4. 9.5 00 00 00 100
Remarks: ……………………………………………………………………………………
Sl. Sieve size Wt. Retained Cumulative Wt. % Cum. Wt. % Wt.
No. (mm) (gm) Retained Retained Passing
(gm)
1. 75 00 00 100
00
2. 53 00 00 00 100
3. 26.5 00 00 00 100
4. 9.5 00 00 00 100
Remarks: ………………………………………………………………………………
OBSERVATION SHEET
8. 0.075 - 8.33
Remarks: ……………………………………………………………………………………………………..
Remarks: ……………………………………………………………………………………………………..
40mm20% 2000gm
Remarks: …………………………………………………………………………………
OBSERVATION SHEET
Remarks: …………………………………………………………………………………
Wt. of Empty Mould =M1(gm) 6106 6106 6106 6106 6106 6106
Wt. of Mould + Compacted Material=M2(gm) 11384 11660 11830 11906 11934 11892
Wt. of Compacted sample M = M2- M1 (gm) 5276 5554 5724 5800 5828 5786
Volume of sample = V (cc) 2250 2250 2250 2250 2250 2250
Bulk Density of material γ = M/V ( gm/cc) 2.345 2.468 2.544 2.577 2.590 2.571
Container No. 04 05 22 24 16 23
Wt. of Container= W1(gm) 128.7 122.2 126.5 121.0 124.6 127.5
Wt. of Wet material + container = W2( gm) 355.8 321.1 351.7 387.3 392.3 401.3
Wt. of Oven Dry material + cont. = W3 ( gm) 350.9 313.5 340.1 367.5 366.6 370.1
Wt. of water W5= W2-W3 (gm 4.9 7.6 11.6 19.8 25.7 31.2
Wt. of Dry material W4= W3-W1 (gm) 222.2 191.3 213.6 246.5 242.0 242.6
Water Content, W % = W5/W4 *100 2.21 3.97 5.43 8.03 10.62 12.86
Dry density yd = γ X 100/(wc+100)gm/ cc 2.294 2.374 2.413 2.385 2.341 2.278
Dia of Weight of Height of Fall No. of blows No.of layers OMC(%) MDD(g/cc)
Mould(cm.) Rammer (kg.) (cm.)
15 4.89 450 55 5 6.0 2.412
Remarks: ………………………………………………………………………………
C.B.R TEST
(As per IS: 2720 Part XVI)
Name of work: Resurfacing of Runway and Allied Works at AFS Panagarh
Contract Agreement No.: CE(AF)SZ/PAN/18 OF 2013-14
Name of the Contractor: PNC Infratech Limited
Readings
kgLoad
Avg. CBR
Readings
Readings
kgLoad
kgLoad
CBR%
CBR%
CBR%
ATTERBERG LIMITS
(As per IS: 2720 Part-V)
LIQUID LIMIT
Particulars Sample 1 Sample 2 Sample 3 Sample 4
Number of Blows
Container No.
Wt. of Container= W1, g
Wt. of Wet soil +container =W2,g
Wt. of oven dry soil +container = W3,gm
Wt. of dry soil Ws=W3-W1, g
Wt. of Water Ww= W2-W3, g
Water Content(%) = Ww/Ws X 100
Average Liquid Limit(%)
PLASTIC LIMIT
Particulars Sample 1 Sample 2 Sample 3 Sample 4
Container No.
Wt. of Container= W1, g
Wt. of Wet soil +container =W2,g
Wt. of oven dry soil +container = W3,gm
Wt. of dry soil Ws=W3-W1, g
Remarks: …………………………………………………………………………………
(Lab Engineer) (Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge
OBSERVATION SHEET
19 0 0 0 100 100
Remarks: …………………………………………………………………………………
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 37.5 00 00 00 100 100
Remark-………………………………………………………………………………………………
(Lab Engineer)( Contractor’s Rep.) J.E.(Civil) A.G.E/Engineer-In-Charge
Remarks: ……………………………………………………………………………………………………..
OBSERVATION
Remarks: ………………………………………………………………………………………
OBSERVATION
Remarks: ………………………………………………………………………………………
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 45 00 00 00 100 100
Remark-………………………………………………………………………………………………
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 45 00 00 00 100 100
Remark-………………………………………………………………………………………………
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 37.5 00 00 00 100 100
Remark-………………………………………………………………………………………………
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 37.5 00 00 00 100 100
Remark-………………………………………………………………………………………………
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1. 37.5 00 00 00 100 100
Remark-………………………………………………………………………………………………
OBSERVATION SHEET
Remarks: ……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
OBSERVATION SHEET
Remarks: ……………………………………………………………………………………………………..
OBSERVATION SHEET
Remarks: ……………………………………………………………………………………………………..
W3- W4 / W4 X100
Remarks: ……………………………………………………………………………………………………..
W3- W4 / W4 X100
Remarks: ……………………………………………………………………………………………………..
W3- W4 / W4 X100
Remarks: ……………………………………………………………………………………………………..
OBSERVATION
Height of calibrating Cylinder = 15 cm.
Diameter of calibrating Cylinder = 10 cm.
Volume of calibrating Cylinder V =π D 2 H / 4
= (3.14x10x10x15)/4
= 1177.5 cm3
Determination of Sand Weight in Cone
S.No. Description Unit Trial-1 Trial-2
1 Wt. of pouring Sand g 6500 6500
with Cylinder (w1)
2 Wt. of Sand & Cylinder after Pouring of g 6144 6148
Sand on plane surface (w2)
3 Wt. of Sand in Cone W= (w1-w2) g 356 352
Remark ………………………………………………………………………………………………….
75.0
53.0
26.5
9.50
4.75
2.36
0.425
0.075
Remarks: ……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
DEGREE OF PULVERISATION
Name of work : Re-surfacing / Strengthening of Runway at AF Station Chakeri, Kanpur
Contract Agreement No. : CE(AF)/NGP/CHK/34 OF 2015-2016
Name of the Contractor : PNC Infratech Limited
Client : Military Engineer Services
Type of Sample: ……. Test No….……
Location/Source: …………….. Date of Testing: ………
Remark : ………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
SIEVE ANALYSIS FOR 31.5 MM AGGREGATE
(As per IS: 383)
OBSERVATION TABLE
1 31.5 100
2 26.5 85-100
3 20 0-30
4 10 0-5
Remarks: ……………………………………………………………………………………………………..