Market analysis
G3M has the opportunity to partner with international companies as ASIC and EL FATIUM Group, and
develop world class inhabitant district supported with all services and start with 50m as a capital for this
project where would hire contraction, architected and electric engineers and other administrative and
marketing positions for officers.
Market competitors in our region are international companies as Talat Mustafa group and Mountain view
company as our project is to be done in the new Cairo district
Other market analysis were conducted on the material used as steel , cement and concrete , through studying
the market and the main companies in this sector as Hadid Ezz , Cordoba for constructions and Stanley and by
estimating the market used products and holding parentships could reach an estimation for the used martials
cost and the final cost of the city
Porters five force:
Bragging power of buyers:
Despite the construction industry are having hard times through world pandemic
and is highly affected the buyers are nearly non-exitance and prefoliation of
budget remains undermines prices levels
Bargaining Power of Suppliers:
according to the current pandemic, suppliers in dominant position can decrease the
margins Sterling the Company, they extract higher prices from the company. The
overall impact lowers the overall profitability of the company.
Threats of New Entrants:
New entrants put pressure to innovate new products and services with the
current events, new ways of providing new value propositions to the customers
with lower prices will maintain the balance and in the long run, it provides profit
Threats of Substitute Products or Service: to avoid profitability suffers being service
oriented rather than just product oriented and increasing the switching cost for
the customers
weakness:
not UpToDate to the market needs and still uses the old-fashioned ways in the construction sites
that consumes time and much resources
don’t use modern technology through there process of construction
only focus on one segment of the society through their marketing plan
opportunities:
take advantages of its growth through their construction companies
increase their revenue as learning from foreigners
improve their services standers
Threats:
through the set circumstances so they are facing major crisis of workers loss due to pandemic
crisis also the time loss and resources waste due to the lock down
also, they have to pay daily wages without getting back proper work done during this period
SWOT analysis for our company
Strengths:
using higher technology as solar panels and electric and electronic machines during the
construction period which lead to time save and higher accuracy and quality and less human
contact
using environment friendly products resulting in less pollution and make the thee
compound to be more environmentally friendly leading in healthier environment to leave
in using up to date technologies through both architecture and construction phases
resulting in a brand-new type of world-class city on Egyptian land
Weakness:
new company
don’t have a well-established reputation in the construction industry
the ultimate and demand need of resources
not enough experience in the industry
Opportunities:
using the experiences of graduated engineers equipped with higher technology so get the
highest quality at considerable salaries for fresh graduate engineers
use the crisis the world is passing through and get all the resources at a low cost, also reduce no.
of workers so less wages and use instead machines and higher technology get higher quality at
low cost
Threats:
high competing environment with well-established companies
facing technical crisis with the machines through the pandemic which well lead to loss until
finding who could fix it
the instability of the market
Services provided:
Providing a world-class ecofriendly city supported with all main, intermating, intellectual services
A five-star city build with the highest technology to be one of kind on the Egyptian land
supported with all hospitalities as school, hotel and mall with all the needs
But addressing our project which is a compound in the ecofriendly city
The compound would be built as a design to be eco friendly supported with whole solar system
for the power supplement and ecofriendly water pipe line with a wide landscape of green areas
and would be supported with a glossaries shops and pharmacies.
Company management:
Manger
Director
Stakeholders
Partnerships
Finical analysis:
The financial analysis is the soul of any project and the flow of money is one of the main
key factors leading the project besides the management, time, planning and quality. The
financial department that is consisted of young graduated financial specialists and older
high experienced economical specialists and officers are held responsible to this analysis
as agreed with company on the methodologies. so, the project (construction work) is
planned to finish across the span of 5 years. At the end of this period 80 eco-friendly
villas with high technologies supported should be delivered.
According to the resources of the company several villas are built during the same
time span each representing a different phase to the main project. The whole project
should cost 300 million EGP including the company profit. The company profit would be
15% of the whole main project. And also 15% from the phase we are working on which
is set of 40 villas that would cost 40 Million EGP. The rest of the money (The capital of
50 million for this phase) is divided amongst salaries, construction work,
machinery, machinery transportation, logistics, and acquiring licenses, solar panels,
agriculture supplements and construction materials
The agreed contract has the owning company paying an annual amount of 25 Million
EGP representing 15% of the whole project cost. Different costs can be seen in the cash
flow.
The cost
costs Year 1 Year 2 Year 3 Year 4 Year 5
Solar panels 4000000 4000000 5000000 5000000 5000000
Agriculture 800000 800000
sublimes
Furniture 1000000 1000000 1000000 1000000 1000000
Machinery 5000000 5000000
acquisition
Logistics 100000 100000 100000 100000 100000
License 1000000
salaries 5000000 4000000 4500000 5000000 4500000
Construction 10000000 10000000 14000000 13000000 10000000
work
Total cost 24910000 24810000 24510000 24010000 20510000
Cash flow 1000000 5000000 5000000 4000000 8000000
Annual agreed 25000000 25000000 25000000 25000000 25000000
income
Annual ROI 69% 119% 120% 122% 140%
Net profit 25000000
Project scope
Project title compound B in the city G3M
Project description
A full-service eco-friendly residential complex comprising 40 villas of, 2 repetitive floors, and
green roofs with a total number of 40 units of same sizes (220 m2). Supported with solar power
system and water treatment pipeline system
Business methods and site coordination.
Project review
During the current pandemic there may be some changes affect the profitability of the project