RFI Register

S.No RFI No Raised Date Query Response


Need of Tie beam location in
1 12 13-03-2018 Basement Follow as per Dwg.

Conform Whether the depth of the


pile cap is inclusive of grade slab pile cap depth inclusive of
2 13 14-03-2018 thickness 350mm grade slab

Spacing of column stirrups inside


pile cap area hasn't been Column ties not required
3 14 15-03-2018 mentioned inside the pile cap

Lapping location for


columns can be Decided by
Lapping location of column main the site, kindly avoid lapping
15-03-2018 bars not mention in the drawings at beam column junction

Diameter of additional Extra reinforcement in the


Reinforcement in Retaining wall & retaining wall is 10#@100,
Grade slab junction, not mentioned please check the drawing
4 15 15-03-2018 in the drawing. attached

Please refer the drwaing


Details of Basement Drainage, number IBSCOK-MB-SD-
Subsoil drainage & floor Drain pits 10,IBSCOK-MB-PD-0099A-
Which is in the MEP drwaings and 00,IBSCOK-MB-PD-0099B-
not in the civil GFC drwaings 00,IBSCOK-MB-PD-0099C-
5 16 4/4/2018 Coordination Required. 00, For details

Arrange the top


reinforcement for the beam
Details required for placing of in symmetrical
16mm & 20mm top steel pattern/Alternate pattern,
reinforcement in 4 pile cap & 5 pile will leave the site to decide
6 17 6/4/2018 cap on either of the two.

Isolated footing detail


incorporated on Grid A-C /
5-9 & C-D/1-2.Please refer
We need details of foundation at the drawing number
grid 7-B, The pile located at this IBSCOK-MB-SD-01,IBSCOK-
7 18 10/4/2018 position is above grade slab level. MB-SD-01/A.

Depth of parking drain shall


Basement floor drain pit depth is be increased from 350 mm
350mm slope of the pipe from the to 500mm, so as to avoid
pit and raft slab reinforcement is clash.Revised drawings
8 19 11/4/2018 clashing attached.
Basement sump pit
oreintation revised to avoid
Basement floor drain collection pit overlap. Revised lay out
11/4/2018 length is clashing with pile caps. attached.

Required clarity on protection


screed for waterproofing
membrane. As discussed over
phone, our understanding is that
lean concreting shall be at places
where surface are uneven (for
leveling purpose) in PCC and there
shall be no screed on top of
membrane sealing, reinforcements Yes Please follow the BOQ
shall be placed on the cover block. specification for better
9 20 11/5/2018 Please conform. clarity.

The column C3, The


Column curtailment detail of C3 notation should be 16dia
10 21 19/4/2018 Need clarification in basement floor and not 20dia.

Clarification needed for diameter of 10 mm bars shall be used


12 23 8/5/2018 chairs in grade slab deatails for chairs in grade slab
Clarification for Tie beam in Lift
13 24 12/5/2018 area.

Clarification for shear wall & tie


beam reinforcement inside the pile
cap

Lap length for lift wall


reinforcement, whether 60*dia as
mentioned in Retaining wall
Drawing can be followed for lift The lift wall laping dia is 60 x
14 26 16/05/18 wall. dia

The Horizontal ties for the


Lift wall horizontal steel lift wall to be followed as
reinforcement details need same as column ties as per
15 Clarification SD-04
As per dwg. (IBSCOK-MB-SD-01/B)
footing F 1 need extra excavation in
south side ( near brigade), Rock
cutting along this area is very
difficult because of loose soil and Please find the attached
deep cutting, there is a chance of additional drawing detail
sliding. Can we provide footing (IBSCOK-MB-SD-01/C) for
16 27 30/05/18 eccentrically ? F1A footing

We refer the MEP Services external


coordination lay out, ( reffer
drawing number ECE-17101-MEP-
100 R0 dated 08-11-17), in provision We shall go with pudle
of 6 nos of 150 dia PVC pipes for flanges ( total qty will be 12
primary ISP cable is shown. It is nos for both live and
mentioned in the drawing that redundant lines.)
sleeves are to be provided for the Accordingly the sleeve
same.Since it coming on retaining mentioned in the IT drawing
wall, It is good to provide puddle should be corrected/read as
flanges instead of sleeves. kindly pudle flanges of 150mm dia
17 28 30/05/18 advice. 10kg/cm2

Puddle flanges on the wall


Kindly provide the sleeve/ puddle should be at the same level
flanges of the same as per dwg (ref. as the pipes that are
dwg no; ECE-17101-MEP-100 R0 entering from out side the
28 30/05/18 dated 8/11/17 building.

We don't have any puddle


flanges penetrating through
As per dwg. (IBSCOK-MB-BW- the beams. Kindly refer the
0099A-00 ) position of puddle super imposed puddle
18 29 31/05/18 flanges may come inside the beam. flange detail with SD-02.

As per dwg. (IBSCOK-SB-AR-0100-00


R1)as per section AA Retaining wall
drop panel is shown but the height
of the same is not mentioned.It is
required for retaining wall second
19 30 31/05/19 lift concreting.
Closed Date Responed Time Raised by

15-03-2018 2 PMK

15-03-2018 1 CBRE

15-03-2018 0 CBRE

15-03-2018 0 CBRE

15-03-2018 0 CBRE

6/4/2018 0 CBRE

9/4/2018 3 PMK

13/4/2018 3 PMK

13/4/2018 1 PMK
13/4/2018 1 PMK

14/05/2018 3 PMK

20/4/2018 1 PMK

9/5/2018 1 PMK

PMK

PMK

16/05/2018 0 PMK

16/05/2018 0 PMK
1/6/2018 1 PMK

5/6/2018 5 CBRE

5/6/2018 5 CBRE

1/6/2018 1 PMK

PMK