Key Plan

This drawing and any information or descriptive matter set out hereon is licensed THIS DRAWING TO BE PRINTED IN COLOUR
to the Qatar Railways Company and is confidential and subject to copyright.
It must not be disclosed, loaned, copied or used for manufacturing, tendering or
N
for any other purpose without written permission. © Qatar Railways Company

BLA
QI

EDUCATION CITY
STATION

G.I. CIRCULAR BOX

MSHEIREB STATION
CONCRETE SLAB

TO SLAB TO CABLE TRUNKING

SADDLE CLAMP SUITABLE GI CONDUIT

CELING
TO OTHER LIGHTING ADAPTER
FIXTURE

GI CONDUIT BOX (TYP.) SADDLE CLAMP


FLEXIBLE GI CONDUIT
CEILING ROSE
Notes

NEATLY TIED WITH


LIGHTING FIXTURE
THREADED ROD WALL GI SURFACE
(WALL MONTED) SADDLE CLAMP
CONDUIT
CABLE (TYP.)
INSIDE FLEXIBLE GI CONDUIT ADAPTER
DOWN LIGHT

LIGHTING FIXTURE
(CELING MONTED)
GI SURFACE CONDUIT

GYPSUM BOARD CEILING

DOWNLIGHT FIXTURE

ISOMETRIC VIEW SECTION VIEW

3A. WALL MOUNTED LTG FIXTURE 3B. CELING MOUNTED LTG FIXTURE
1. GENERAL MOUNTING DETAIL OF DOWN LIGHT ON GYPSUM FALSE CEILING
INSTALATION DETAIL INSTALATION DETAIL

TO SOFFIT

BOX CONNECTED TO TRUNKING


VIA BUSH & LOCK NUT

100x100 mm CABLE TRUNKING CABLE TRUNKING SUPPORT


CEILING / FLOOR SLAB

TO OTHER
TO CABLE TRUNKING
TO SOFFIT LIGHT FIXTURE
20mm FLEXIBLE CONDUIT 25mm DIA PIPE
GI CONDUIT
TRUNKING MOUNTED GI CIRCULAR BOX
PLUG IN CEILING ROSE
SADDLE CLAMP
Reference drawings
CEILING ROSE
CONDUIT BOX FLEXIBLE CONDUIT
NEATLY TIED WITH THREADED ROD CHAIN SUPPORT
TRUNKING

CHAIN SUPPORT
FLUORESCENT LIGHT
FIXTURE
CABLE GLAND

CEILING TILES
FALSE CEILING
600X600mm (TYP.) LIGHT FIXTURE
GLAND
(SUSPENDED MOUNTED) 4.0 27/10/2016 SJH ISSUED FOR SONO HP RD
LUMINAIRES (TYP.)
3.1 24/06/2016 SJH FOR REVIEW & COMMENT (MUS_MEP_02) HP RD
3.0 25/02/2016 SJH ISSUED FOR SONO HP RD
2.0 23/09/2015 SJH ISSUED FOR SONO HP RD
ISOMETRIC VIEW SECTION VIEW 1.2 12/09/2015 SJH FOR REVIEW & COMMENT (MUS_MEP_02) HP RD
1.1 10/08/2015 SJH FOR REVIEW & COMMENT (MUS_MEP_02) HP RD
1.0 01/07/2015 SJH ISSUED FOR TENDER HP RD
2. GENERAL INSTALLATION DETAILS OF (600x600mm) FLOURESCENT / LED LIGHT FITTING ON REMOVABLE FALSE CEILING 4. SUSPENDED MOUNTED LTG FIXTURE INSTALATION
Rev Date Drawn Description Ch’k’d App’d

“This document is issued for the party which


commissioned it and for specific purposes connected with
the captioned project only. It should not be relied upon by
any other party or used for any other purpose.
G.I. CIRCULAR BOX We accept no responsibility for the consequences of this
document being relied upon by any other party, or being
used for any other purpose, or containing any error or
CONCRETE SLAB
omission which is due to an error or omission in data
TO OTHER LIGHTING FIXTURE
supplied to us by other parties.”

SADDLE CLAMP SUITABLE GI CONDUIT


Project

FROM OTHER LIGHTING ADAPTER QATAR INTEGRATED RAILWAYS PROJECT


FIXTURE
MAJOR STATIONS
FLEXIBLE GI CONDUIT

Station Name

NEATLY TIED WITH MSHEIREB STATION


G.I CONDIUT
THREADED ROD CONDUIT CLAMP
OCCUPANCY SENSOR Title
SUITABLE PVC GLANDS
SUITABLE GLANDS
LIGHTING SERVICES
G.I BACK BOX SUITABLE
FLEXIBLE CABLE FOR FIXING DETECTOR
STANDARD DETAILS
G.I BACK BOX SUITABLE
FOR FIXING DETECTOR

OCCUPANCY SENSOR
Client
QATAR RAILWAYS COMPANY
OPENING IN FALSE CEILING
WITH RUBBER BUSH OCCUPANCY SENSOR P.O. BOX 29988 Doha
Qatar
Designed MS Eng check HP

Drawn SJH Coordination TS

Dwg check HP Approved RD


5. GENERAL INSTALLATION DETAILS OF OCCUPANCY SENSOR IN FALSE CEILING 6. GENERAL INSTALLATION DETAILS OF OCCUPANCY SENSOR ON CEILING
Scale at A1 Status Rev

NTS 04 4.0

Drawing Number

M007-MML-ELE-DWG-UCSTMUS-AA-27700
Date: 26/10/2016 Time: 18:24:37