ITP For Installation For PVC Perforated Pipes of Underdrain System
ITP For Installation For PVC Perforated Pipes of Underdrain System
ITP For Installation For PVC Perforated Pipes of Underdrain System
MGB-ITP-001-PW-001
1.4 Material Submittals SRF Approved H,R R R,H R,H Prior to installation Approved by Design Consultant Prepared by NGCB
2.0 Construction
2.1 Material Receiving Inspection SRF Approved H,R R R,H R,H Prior to installation Material Inspection Checklist Prepared by NGCB
2.2 Fabrication of Perforated Pipes MS, SD & FCD Approved H H R,W H After Installation Installation Checklist + ITR Prepared by NGCB
2.3 Installation Check/Inspection MS, SD & FCD Approved H H H H,S After Installation Applicable Checklist + ITR Prepared by NGCB
2.5 Final Acceptance Test T&C Procedure Approved H H H H After Installation Applicable Checklist + ITR N/A
Page 01 of 01
ITP No. MGB-ITP-001-PW-001
Date:
NGCB
_______________________
CQC Engineer QA/QC Head Project Manager
Nominated Subcontractor General Contractor Empire East Land Holdings Inc.
MARRIOT GRAND BALLROOM PROJECT
ITEM REMARKS
ACTIVITIES / ITEMS TO BE INSPECTED STATUS
No.
NGCB EELHI
1 Check pipes and fittings conform to approvev SRF
2 Check material brand is approved
3 Inspect all pipes, fittings and jointing material are new and undamaged
4 Check required solvent cement and lubricant are available
5 Check the quantity / specification of pipes, en cap and fittings are according to technical
specification / codes
6 Check delivered quantity
7 Check all items are stored in orderly manner.
INSTALLATION INSPECTION CHECKLIST FOR PVC PERFORATED PIPES & FITTINGS REV: A1
ITEM REMARKS
ACTIVITIES / ITEMS TO BE INSPECTED STATUS
No.
NGCB EELHI
1 Check pipes, fittings & ancillary material used conform to approved submittals
2 Check fabricated PVC pipe perforation holes & filter cloth are as per appoved shop drawings
3 Check pipe layout in the approved shop drawing
4 Check the spacing and adequacy of supports
5 Check pipe slope / invert pipe levels
6 Check pipe bedding and backfill materials are acceptable.
7 Check final connection to Sump Pit