1. SUMMARY 1-1
Contents
–i–
E
This page is intentionally left blank.
F5361_A06
EQUIPMENT INSTALLATION
1. SUMMARY
This manual provides the equipment descriptions for the system, rack layouts and
Subracks used for the V-Node S, and their procedures.
Detailed descriptions on boards and modules, and their installation procedures are
provided in the Unit Installation manual.
Descriptions and procedures for cable connections are provided in the Cable
Installation manual.
Include one MCP, two P_INF, two CS, one FAN, one CLK board and seven interface
boards.
Summary
1-1
E
This page is intentionally left blank.
F5361_A06
EQUIPMENT INSTALLATION
2. EQUIPMENT DESCRIPTION
2.1 Description
V-Node S subracks can be installed into the ETSI rack and maximum 8 subracks can be
installed into the NEC’s ETSI subrack (V-RACK).
Equipment Description
2-1
F5361_A06
EQUIPMENT INSTALLATION
Equipment Description
2-2
E
F5361_A06
EQUIPMENT INSTALLATION
Follow the safety requirements below when installing the V-Node S equipment.
z After using any power tools or other equipment, they must be cleaned up and put in
storage on a daily basis.
z When handling conducting cables, the cable ends must be taped or insulated at all
times.
z Do not wear any jewelry or any other kinds of accessories, such as ID around the
neck, while working.
3.3 Admonishment
Installers must also be familiar with and able to employ the following Safety
Requirements:
CAUTION
ESD
4.2 Reference
Procedures for the following tasks are provided in a separate manual:
5. INVENTORY TOOLS
Before starting the equipment installation, confirm that the following tools are
available:
1 Hammer Drill
3 Electric Drill
4 Torque Wrench
11 Jig Saw
12 Hacksaw
16 Heat Gun
17 Wire-Wrap Gun
20 Cable Cutters
22 Extension Cords
25 Chalk Line
Inventory Tools
5-1
F5361_A06
EQUIPMENT INSTALLATION
Inventory Tools
5-2
F5361_A06
EQUIPMENT INSTALLATION
36 Cable Scissors
39 Cable Stripper
41 Cable-Side Cutter
43 Sockets
45 Claw Hammer
47 Adjusted Wrenches
48 Pry Bar
51 Digital millimeters
52 Speed Square
53 Drill Bits
54 Pliers
57 Torpedo Level
58 Center Punch
59 Sponge
60 Flashlight
61 Marking Pens
62 Measuring Tapes
Inventory Tools
5-3
E
This page is intentionally left blank.
F5361_A06
EQUIPMENT INSTALLATION
6. SITE PREPARATION
Site Preparation
6-1
E
This page is intentionally left blank.
F5361_A06
EQUIPMENT INSTALLATION
7. UNPACK EQUIPMENT
3. Locate markings on the box, and position the box with the correct side up according
to the markings.
5. Remove the contents from the carton, and place them on a flat patch.
7. Check the contents (Subracks, modules, cables, etc.) for visible damages.
Unpack Equipment
7-1
E
This page is intentionally left blank.
F5361_A06
EQUIPMENT INSTALLATION
This section describes the mounting method of the V-Node S subrack for the NEC
ETS V-RACK (ETS V-Rack). For information about the ETS V-Rack, refer to ETS
V-Rack manual.
Subrack mounting components are necessary to mount the V-Node S subrack in the
NEC ETS V-Rack. Before starting the installation work, check supplied components
shown in Table 8-1.
The following flowchart shows a series of procedures necessary for installing the
subrack. The subrack should be mounted according to these procedures.
Figure 8-4 and Figure 8-5 shows one sample about the standard mounting positions
for the V-Node S subrack. If you install the cable from the upper side of the subrack,
please make a space 100mm or more between the subrack. (Figure 8-4) And if you
install the cable from left or right side of the subrack, you can install as Figure 8-5.
Attach the RAC nuts at both sides to the mounting positions shown in Figure 8-4 and
Figure 8-5.
(1) Insert the cable supports into the square holes on the V-Rack rear panel.
(2) Fasten the M4 screws to fix the cable supports. Keep in mind that the fastened
positions of the cable support is differed with the cable install location.
NOTE: Do not take off the hex-head screws from the subrack.
(2) Fasten the optical tray to the V-Rack with hex-head screws.
NOTE: When you use the hex-head screw to fix the tray to the subrack, please use
the supplied hex-head wrench.
Attention!
1. The Subrack is heavy, two or more person are required for the installation.
2. When you install the subrack, please un-installed the board from the subrack.
9. GROUNDING SYSTEM
There are 3 types of grounding: frame ground (FG); battery ground (BG); signal
ground (SG). Every type of grounding insulates from other groundings.
If need use shield to prevent the internal circuit from electromagnetic radiation,