10 Project Forms That A QA/QC Engineer Must Have: 1. Document Transmittal Sheet (DTS)
10 Project Forms That A QA/QC Engineer Must Have: 1. Document Transmittal Sheet (DTS)
10 Project Forms That A QA/QC Engineer Must Have: 1. Document Transmittal Sheet (DTS)
For the beginners, you must know the uses and importance of this project forms
that I will explain one by one.
Here are 10 Project Forms that a Quality Inspector or QA/QC Engineer Must
Have:
This form will use to submit documents, drawings etc. This shall be filled by a
Document Controller, writing the specific titles for the submittal and attach
necessary attachments and of course it shall be the advice from Technical
Manager.
You can click here and save as the form in PDF or download Document
Transmittal Form word file.
2. Material Submittal Sheet (MSS)
This form will use to submit materials for site use. Make sure that required field or
spaces to fill up are completely filled with correct descriptions such as: Supplier,
Material Description etc.
You can see here and save as the form in PDF or download Material Submittal
Form word file.
This form will use if there is something that is not clear in the drawing to better
understand or clarify certain area of the work, so contractor will send an RFI to
the Engineer or Consultant for clarification. See here the RFI form
in PDF or download RFI Form word file.
This form will use to submit to the Engineer for approval of any subcontractor that
take subcontracts work in a project. See here the SA form.
The contractor will use this form to confirm to the Engineer or Consultant for the
verbal instruction he stated during meeting or phone calls or site joint
inspection. See here the CVI form or download CVI form excel file.
If the work proceeds without submitting CVI is performed at the contractor’s risk.
This form will use if there is part of activity that is ready for inspection. The
inspection request shall be submitted 24 hours before inspection. IR shall not be
accepted by the Engineer if the time of inspection is less than 24 hours so take
care about the time it might create delays on your project if it is accumulated.
Succeeding activity cannot proceed without the approval of the previous activity.
Unapproved inspection request can be the medium to hold payments for
requested progress billing of the contractor. It is always necessary to get
approval for your inspections to avoid payments delay issue. See here the IR
form in PDF or download IR form excel file.
7. Daily Report
This form will use to list down all the activity on site on daily basis including the
machineries, plant, manpower, weather report. Download Daily Report.
8. Weekly Report
This form will use to list down the weekly progress on site including percentage
complete of the activities. Download Weekly Report form word file.
This form will use for nonconformity noticed by the Engineer and shall be issued
to contractor. Nonconformity will exist if the specification, drawing and other
standards are not followed during the execution of the project. The NCR is
sometimes used to hold the payments of the contractor’s billing, no payments
shall be made unless NCR is rectified and approved by the Engineer. See
here the NCR form or download NCR form word file.
These are all the project forms we handled from the start and until completion of
the project.
If you have suggestions that can supplement to the above documents you may
write down your comment below.
The soft copies of the forms are embedded above, you can download it. Thank
you for visiting this blog.