Professional Documents
Culture Documents
Tie Ͳintoexistingpiping/Pipeline: Prepared By
Tie Ͳintoexistingpiping/Pipeline: Prepared By
Itisalsorecommendedtokeepthepurginguntilthecold
cuttingisinprocess,iscompleted.
x Forundergroundpiping/pipeline,cleanthelocationofthepipewherecuttingistobe
performedͲ8”(suitableforthewidthofthecuttingmachine)toeithersideofcuttingpoint
,suitableforholdingthecoldcuttingmachine
x Installcoldcuttingm/contheexistingpipe.
x KeepacollectingdrumunderthecutwithVacuumTankerhoseincaseofliquid.
x Uponcompletingthefirstcut,markthesecondlocationconsideringallmeasurementssuch
as(Flangelength+RF+Gasket)andtoprovide5mmtoaccommodatetheprefabspool.(Refer
FigͲ1).DonotmarkandstartcoldcuttingatbothlocationsimultaneouslyincaseoftieͲin
work.
x Once2ndcutisnearingcompletion,holdthecutpiecefirmlybycranewithwidepropylene
belttoavoidanymovementofcutpiece.
x Beforeremovingcutpieces,startpouringwateronbothsidesofthecuttoavoidanyspark
generationduetometaltometalcontact.
x Oncethecutpieceisremovedstoppouringwater.
TieͲintoexistingPiping/Pipeline
x Beforestartofanyhotwork,permittobetakenalongConfinedSpacePermitincaseof
undergroundpiping/pipeline.
x InsertGasPlugonbothendofexistingpiping/pipelineandsealtheedgeoftheplugwith
propersealingmaterialproperly.
x Connect¾”hoseoneendtotheGasPlugandotherendofhosetobeputawayinacontainer
whichisfullwithwater.(Toavoidhazardouscondition)(ReferFigͲ2)
Beforestartofanygrindingorweldingworkcheckpresenceofgasinsidethewallofpiping/pipeline
aswellassurroundingareainsidethetrenchbygasdetectorinstrument(GasCheckingshallbea
continuousprocesswhilehotworkisgoingon)
(E) PRECAUTION:
1. Ensurethatthecoldcuttingiscompletelydone.Ifnotuseamanualhacksawbladetocut
fully.
2. Donottrytoremovethecutpieceifthecutisincompleteandnotdetachedfromthe
parentpipe.
3. Donothammerthecutpiecetoremovefromtheparentpipesincethissortofbreakage
maycreatesparks.
4. Ensuretheareaisfreetomeetanyunforeseencondition.
NOTE:Duringwholeprocess,KOCHSEMSproceduresshallbestrictlyfollowed
Preparedby:MohammadShoeb