REQUIREMENTS DOCUMENTATION

POWER FOR CASTAWAY

CARING FOR OTHERS


3 VESI STREET
FLAGSTAFF, SUVA

22/05/2020

1
Document Details
Author Modifications Date Version
Adrea Vui Draft 18.05.20 1.0
Adrea Vui Draft 22.05.20 2.0

Approvals
This document requires the following approvals:
Name Role Signature Approval Version
Date
Steve Gates Director (Sponsor) 25.05.20 2.0

Distribution
This document has been distributed to:
Name Role Date of Version
Issue
Lice Dakunimata Assistant Manager ( Compliance Control ) - 26.05.20 2.0
FCCC
Naomi Baleca Unit Leader Regulatory - EFL 26.05.20 2.0
Richard Hemps Business Analyst – Caring For Others 26.05.20 2.0

2
TABLE OF CONTENTS
INTRODUCTION.................................................................................................................................4
REQUIREMENTS LIST........................................................................................................................5
SPONSOR ACCEPTANCE....................................................................................................................6

3
INTRODUCTION

The purpose of this document is to provide the reader with the information regarding the
requirements and needs that were gathered from;

 the project sponsor


 stakeholders and
 relevant authorities.

This document should be a guide as to what the deliverables of this project are.

4
REQUIREMENTS LIST
ID Requirement Stakeholder Category Priority Acceptance Criteria Validation Method

REQ. 1 Implementation Project Sponsor Functional High Should be able to cater to Signed project charter and
and construction of existing electricity needs of business case
solar farm on Castaway Island
castaway island
REQ. 2 Complaint to Energy Fiji Legal High Should meet current Tests shall be made by
Electricity Act Limited standards, regulations & by- delegated authorities and
2017 laws signed certification
documents obtained
REQ. 3 Acquire Generation Fijian Legal High Application form to be Assigned personnel to
License for Solar Competition and signed and submitted with inspect that solar farm meets
Farm Consumer relevant documents from regulations and standards set
Commission EFL out by local Authority

5
SPONSOR ACCEPTANCE

Approved by the Project Sponsor:

___________________________________________ Date:____________________
Steve Gates
Director