Work from home activities -brief

Sr.no. Date
plan
Electrical drawing checking TCE
1 3/20/2020 and Durr.
Electrical activity followup.

Light fitting drawing checking,


Substation drawing details
2 3/23/2020 received from TCE checking.
MES and IT K block activity follow
up.

Fire hydrent of Durr and TCE


drawing checking .
3 3/27/2020 Electrical activity follow up.
Durr Process and Conveyor panel
detailed checking.

4 3/28/2020 Sealing robot details checking.


Substation cable tray support
details checking.