Project: Charsle - OkeBen Services (*1LX-CWX8-822F-L6MU)

SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-1

SLAB ANALYSIS AND DESIGN REPORT

NOTATION:
d/h = Effective/Total Depth of Slab (d=h-conc.cover)
g/q = Dead/Live Load (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-spn = Ultimate Design Span Moment
M-sup = Ultimate Design Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)

Material: C20/25 / Grade 410 (Type 2)

Slab Strip: X1 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.5Support As = 282.74/452.39 Top:Y12-250(T1)

1S1 1 5.800 2900.00 0.0492 0.0366 254.4/452.39


119/150 1.500 4000.00 4.4 3.2 Bottom: Y12-250(B1)
Deflection Check: L/d = 24.37 < 52.0 *** Sufficient ***

Support Mc = 5.4Support As = 282.74/452.39 Top:Y12-250(T1)

1S2 1 5.800 4850.00 0.0320 0.0240 254.4/452.39


107/150 1.500 4000.00 5.4 4.0 Bottom: Y12-250(B2)

Support Mc = 4.8Support As = 282.74/452.39 Top:Y12-250(T1)

1S4 1 5.800 1625.00 0.0630 0.0630 254.4/452.39


119/150 1.500 4000.00 1.8 1.8 Bottom: Y12-250(B1)
Deflection Check: L/d = 13.66 < 52.0 *** Sufficient ***

Support Mc = 7.6Support As = 282.74/452.39 Top:Y12-250(T1)

1S5 1 5.800 4325.00 0.0449 0.0342 254.4/452.39


119/150 1.500 5500.00 8.8 6.7 Bottom: Y12-250(B1)
Deflection Check: L/d = 36.34 < 52.0 *** Sufficient ***

Support Mc = 1.0Support As = 282.74/452.39 Top:Y12-250(T1)

Slab Strip: X2 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.3Support As = 282.74/452.39 Top:Y12-250(T1)

1S3 1 5.800 6250.00 0.0320 0.0240 254.4/452.39


107/150 1.500 5950.00 11.9 8.9 Bottom: Y12-250(B2)

Support Mc = 10.4Support As = 282.74/452.39 Top:Y12-250(T1)

1S6 1 5.800 3125.00 0.0468 0.0354 254.4/452.39


119/150 1.500 4125.00 4.8 3.6 Bottom: Y12-250(B1)
Deflection Check: L/d = 26.26 < 52.0 *** Sufficient ***

Support Mc = 0.5Support As = 282.74/452.39 Top:Y12-250(T1)

Slab Strip: X3 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0Support As = 282.74/452.39 Top:Y12-250(T1)

Project: Charsle
Project: Charsle - OkeBen Services (*1LX-CWX8-822F-L6MU)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-2

1S10 1 5.800 3125.00 0.0000 0.0000 254.4/452.39


107/150 1.500 1310.00 0.0 0.0 Bottom: Y12-250(B2)

Support Mc = 4.7Support As = 282.74/452.39 Top:Y12-250(T1)

1S7 1 5.800 4325.00 0.0320 0.0240 254.4/452.39


107/150 1.500 3725.00 4.7 3.5 Bottom: Y12-250(B2)

Support Mc = 0.5Support As = 282.74/452.39 Top:Y12-250(T1)

Slab Strip: X4 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.5Support As = 282.74/452.39 Top:Y12-250(T1)

1S8 1 5.800 4325.00 0.0000 0.0240 254.4/452.39


107/150 1.500 3650.00 0.5 3.4 Bottom: Y12-250(B2)

Support Mc = 0.5Support As = 282.74/452.39 Top:Y12-250(T1)

Slab Strip: X5 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.4Support As = 282.74/452.39 Top:Y12-250(T1)

1S13 1 5.800 5525.00 0.0000 0.0240 254.4/452.39


107/150 1.500 3400.00 0.4 2.9 Bottom: Y12-250(B2)

Support Mc = 0.4Support As = 282.74/452.39 Top:Y12-250(T1)

Slab Strip: X6 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.8Support As = 282.74/452.39 Top:Y12-250(T1)

1S13 1 5.800 3400.00 0.0560 0.0420 254.4/452.39


119/150 1.500 5525.00 6.8 5.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 28.57 < 52.0 *** Sufficient ***

Support Mc = 6.8Support As = 282.74/452.39 Top:Y12-250(T1)

1S8 1 5.800 3650.00 0.0412 0.0314 254.4/452.39


119/150 1.500 4325.00 5.8 4.4 Bottom: Y12-250(B1)
Deflection Check: L/d = 30.67 < 52.0 *** Sufficient ***

Support Mc = 5.8Support As = 282.74/452.39 Top:Y12-250(T1)

1S7 1 5.800 3725.00 0.0401 0.0304 254.4/452.39


119/150 1.500 4325.00 5.8 4.4 Bottom: Y12-250(B1)
Deflection Check: L/d = 31.3 < 52.0 *** Sufficient ***

Support Mc = 0.7Support As = 282.74/452.39 Top:Y12-250(T1)

Slab Strip: X7 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.7Support As = 282.74/452.39 Top:Y12-250(T1)

1S5 1 5.800 5500.00 0.0000 0.0240 254.4/452.39

Project: Charsle
Project: Charsle - OkeBen Services (*1LX-CWX8-822F-L6MU)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-3

107/150 1.500 4325.00 0.7 4.7 Bottom: Y12-250(B2)

Support Mc = 0.7Support As = 282.74/452.39 Top:Y12-250(T1)

Slab Strip: X8 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.5Support As = 282.74/452.39 Top:Y12-250(T1)

1S3 1 5.800 5950.00 0.0340 0.0260 254.4/452.39


119/150 1.500 6250.00 12.7 9.7 Bottom: Y12-250(B1)
Deflection Check: L/d = 50.0 < 52.0 *** Sufficient ***

Support Mc = 10.1Support As = 282.74/452.39 Top:Y12-250(T1)

1S1 1 5.800 4000.00 0.0320 0.0240 254.4/452.39


107/150 1.500 2900.00 2.8 2.1 Bottom: Y12-250(B2)

Support Mc = 0.3Support As = 282.74/452.39 Top:Y12-250(T1)

Slab Strip: X9 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.5Support As = 282.74/452.39 Top:Y12-250(T1)

1S3 1 5.800 5950.00 0.0340 0.0260 254.4/452.39


119/150 1.500 6250.00 12.7 9.7 Bottom: Y12-250(B1)
Deflection Check: L/d = 50.0 < 52.0 *** Sufficient ***

Support Mc = 11.2Support As = 282.74/452.39 Top:Y12-250(T1)

1S2 1 5.800 4000.00 0.0425 0.0324 254.4/452.39


119/150 1.500 4850.00 7.2 5.4 Bottom: Y12-250(B1)
Deflection Check: L/d = 33.61 < 52.0 *** Sufficient ***

Support Mc = 0.8Support As = 282.74/452.39 Top:Y12-250(T1)

Slab Strip: X10 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.8Support As = 282.74/452.39 Top:Y12-250(T1)

1S13 1 5.800 3400.00 0.0560 0.0420 254.4/452.39


119/150 1.500 5525.00 6.8 5.1 Bottom: Y12-250(B1)
Deflection Check: L/d = 28.57 < 52.0 *** Sufficient ***

Support Mc = 6.8Support As = 282.74/452.39 Top:Y12-250(T1)

1S12 1 5.800 3650.00 0.0000 0.0000 254.4/452.39


107/150 1.500 1200.00 0.0 0.0 Bottom: Y12-250(B2)

Support Mc = 0.0Support As = 282.74/452.39 Top:Y12-250(T1)

Slab Strip: X11 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.4Support As = 282.74/452.39 Top:Y12-250(T1)

1S6 1 5.800 4125.00 0.0320 0.0240 254.4/452.39


107/150 1.500 3125.00 3.3 2.5 Bottom: Y12-250(B2)

Project: Charsle
Project: Charsle - OkeBen Services (*1LX-CWX8-822F-L6MU)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-4

Support Mc = 3.3Support As = 282.74/452.39 Top:Y12-250(T1)

1S4 1 5.800 4000.00 0.0000 0.0000 254.4/452.39


107/150 1.500 1625.00 0.0 0.0 Bottom: Y12-250(B2)

Support Mc = 0.0Support As = 282.74/452.39 Top:Y12-250(T1)