8

2923
1033
I J K L M N O P
1034

25650
3700 3700 3700 3700 3700 3700 3700 2433
9
2912

2912
45°
OFFICE
46°
Slope 1:1
44° 45° 10
2912

2903
7482
Slope 1:1
toe wall 11

4511
Slope 1:1

1634
2912

53°
14187

53°
865
2912

Retaining wall Slope 1:1 3700


450 mm height
fair-face finish with brick toping
(see detail of retaining wall)
3700 P
9
37° 2483
3700 O

3700
37

N
°

3700 M
1349

3700 L
3700
K
J
PONDI

GOVERNMENT OF THE PEOPLES REPUBLIC OF BANGLADESH IMPROVEMENT of AKUIN CHARPARA GRAVEYARD & Ar. Manifa Rehnuma
EID-GAON
LOCAL GOVERNMENT ENGINEERING DEPARTMENT
UNDER SADAR UPAZILA, DIST:FARIDPUR. A K M Tanvir Hassan PROJECT DIRECTOR GSIDP/GRAVE/FAR/
GSIDP Manifa Rehnuma ENGR. MD. HAFIZUR RAHMAN EXECUTIVE ENGINEER, FARIDPUR. GSIDP, LGED. DATE: March, 2019 Decription SAD/AQN./ ARCH 14.1