Pavilion roof 2200 mm

950
CURVE WALL Ablution 1300 mm

900

Eid Gah F.F.L +0 mm (7.9 M topo)


Sitting
400

-350 mm
450
Pavillion F.F.L -800 mm (7.1 M topo) grave yard walk -800 mm

1350
way F.F.L
Slope 1:2
water over flow drain level -1350 mm (6.5 M topo)
Pond edge
water level -1700 mm (6.2 M topo) for plantation

300 x 300 x 100 block layer with soil medium

Geo textile/ fabric for shore protection

pond bottom -4900 mm (3.0 M topo) Toe wall

POND SECTION Blow up

GOVERNMENT OF THE PEOPLES REPUBLIC OF BANGLADESH


LOCAL GOVERNMENT ENGINEERING DEPARTMENT

GSIDP
IMPROVEMENT of AKUIN CHARPARA GRAVEYARD &
EID-GAON
UNDER SADAR UPAZILA, DIST:FARIDPUR. A K M Tanvir Hassan
Manifa Rehnuma
Pond section
ENGR. MD. HAFIZUR RAHMAN EXECUTIVE ENGINEER, FARIDPUR.
PROJECT DIRECTOR
GSIDP, LGED.
Ar. Manifa Rehnuma

DATE: March, 2019 Decription


GSIDP/GRAVE/FAR/
SAD/AQN./ ARCH 14.3