Plan of work and targets to be achieved.

I. In the first phase, Light Weight Aggregate and PCM has to be purchased. How much
percentage of PCM is immersed in LWA is to be studied. Collection of literatures for
research work has also to be completed. Mix proportions for various percentages of
phase changing material in LWA admixed concrete has to be done. Characterization
of properties of PCM has to be done in laboratories of nearby institute.
II. In the second phase, Strength, Thermal and Micro-Structural studies on LWA
admixed concrete with phase changing material have to be conducted.

S.No Activity Duration (Weeks)


1. purchase of LWA and PCM 2
2. Literature survey 12
3. characterization of properties 8
4. Strength and Thermal studies on LWA admixed 12
concrete with PCM
5. Micro-Structural studies on LWA admixed concrete 13
with PCM
6. Preparation of report 10

Activity Duration (Weeks)


1-2 3-8 9-12 13-16 17-20 21-24 25-30 30-35 35-40
purchase of LWA
and PCM
Literature survey

characterization of
properties
Strength and
Thermal studies on
LWA admixed
concrete with PCM
Micro-Structural
studies on LWA
admixed concrete
with PCM
Preparation of
report