Station Name : Farakka

SN Discussion Point & Information requested Unit


1 Make up water pipelines
a No. of pipelines Open channel

b No. of hrs the pipelines are under operation in a day NA

c Length of pipeline NA
2 Transmission lines NA
a No. of power circuit
b Power supply source NTPC/SEB
c Maintenance scope with NTPC/SEB

d
If power source from SEB what is the billing amount
in last 12 months

e
What is the rated KV of transmission line and
distance from plant boundary.

f
Contribution of the Make up water pumps towards
APC of the plant in percenatge
Capacity:2100MW