Nde-1711-T393-F0003 Bottom Plates Long Seam Jonts
Nde-1711-T393-F0003 Bottom Plates Long Seam Jonts
QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report
F0155-76-CON-M- F0330-76-CON-M-
J203-305 SMAW 18323, 18425 A36 6mm A36 6mm MET-06-95 Rev3 1070-652
F0017 NA NA NA NA VBT 1070-971
F0015 ACC
17382, 1811,
F0175-76-CON-M- F0330-76-CON-M-
J203-308 SMAW 1884, 18425, A36 6mm A36 6mm MET-06-95 Rev3 25710-712
F0021 NA NA NA NA VBT 1070-971
F0019 ACC
18262
F0162-76-CON-M- F0330-76-CON-M-
J203-309 SMAW 18465, 1884 A36 6mm A36 6mm MET-06-95 Rev3 24140-350
F0020 NA NA NA NA VBT 1070-971
F0019 ACC
18465, 0747,
F0150-76-CON-M- F0330-76-CON-M-
J203-310 SMAW 18425, 18913, A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971
F0019 ACC
1973, 18412
18465, 0747,
F0150-76-CON-M- F0330-76-CON-M-
J203-312 SMAW 1940, 18260, A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971
F0018 ACC
18498, 184324
QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 2 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:
QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report
F0162-76-CON-
18465, 18412, M-24140-350 F0330-76-CON-M-
J203-313 SMAW
18434, 18253
A36 6mm A36 6mm MET-06-95 Rev3 F0020 NA NA NA NA VBT 1070-971
F0017 ACC
F0162-76-CON-
1889, 18253,
M-24140-350 F0330-76-CON-M-
J203-314 SMAW 1940, 18236, A36 6mm A36 6mm MET-06-95 Rev3 F0020 NA NA NA NA VBT 1070-971
F0017 ACC
18260,18398
F0162-76-CON-M- F0330-76-CON-M-
J203-317 SAW 18247, 19191 A36 6mm A36 6mm MET-O5-05 REV.4 24140-350
F0020 NA NA NA NA VBT 1070-971
F0016 ACC
18329, 18317,
1884, 18425, F0150-76-CON-M- F0330-76-CON-M-
J203-318 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971
F0013 ACC
18424, 18434,
18462, 18262
QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 3 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:
QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report
F0020-76-CON-M- F0330-76-CON-M-
J203-319 SAW 18718, 18598 A36 6mm A36 6mm MET-O5-05 REV.4 24140-350
F0020 NA NA NA NA VBT 1070-971
F0013 ACC
17393, 18317,
1884, 18223, F0150-76-CON-M- F0330-76-CON-M-
J203-320 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971
F0013 ACC
18425, 18913,
18412
F0330-76-CON-M-
F0162-76-CON-M- F0012/
J203-321 SAW 18247, 18739 A36 6mm A36 6mm MET-O5-05 REV.4 24140-350
F0020 NA NA NA NA VBT 1070-971/ F0479-76- ACC
CON-M-1070-1186 F0021
18946, 0747, F0330-76-CON-M-
F0158-76-CON-M- F0011/
J203-322 SMAW 18465, 18260, A36 6mm A36 6mm MET-06-95 Rev3 1070-672
F0008 NA NA NA NA VBT 1070-971/ F0479-76- ACC
CON-M-1070-1186 F0021
18913, 18262
F0330-76-CON-M-
1889, 17393, F0155-76-CON-M- F0011/
J203-323 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-652
F0017 NA NA NA NA VBT 1070-971/ F0479-76- ACC
18260, 18425 CON-M-1070-1186 F0021
F0330-76-CON-M-
1884, 18412, F0156-76-CON- F0010/
J203-324 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-M-661
F0018 NA NA NA NA VBT 1070-971/ F0479-76- ACC
18329, 18946 CON-M-1070-1186 F0021
18946, 18424,
F0330-76-CON-M-
18434, 0747, F0156-76-CON- F0010/
J203-325 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-M-661
F0018 NA NA NA NA VBT 1070-971/ F0479-76- ACC
18465, 18412, CON-M-1070-1186 F0021
18498
QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 4 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:
QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report
F0330-76-CON-M-
18465, 18936, F0150-76-CON-M- F0010/
J203-326 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971/ F0479-76- ACC
19169, 1940 CON-M-1070-1186 F0021
18236, 1889,
F0145-76-con-m- F0330-76-CON-M-
J203-329 SMAW 18208, 18262, A36 6mm A36 6mm MET-06-95 Rev3 1070-618
F0015 NA NA NA NA VBT 1070-971
F0008 ACC
18263
18412,1884,
F0120-76-CON-M- F0330-76-CON-M-
J203-330 SMAW 18398,18424, A36 6mm A36 6mm MET-06-95 Rev3 24170-539
F0011 NA NA NA NA VBT 1070-971
F0008 ACC
18323,18317,
J203-331 SMAW 18225, 18329, A36 6mm A36 6mm MET-06-95 Rev3 F0145-76-con-m- F0015 NA NA NA NA VBT F0330-76-CON-M- F0007 ACC
Inspection Authority Sign-off:
Prepared By: METSCCO Reviewed By: AICC Reviewed By: KHATIB & ALAMI Reviewed By: SWCC
MURUGANANDAM. G
QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 5 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:
QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report
15144, 18424,
18434, 1973, 1070-618 1070-971
18156, 18262
18165, 18498,
F0145-76-con-m- F0330-76-CON-M-
J203-333 SMAW 18412,18208, A36 6mm A36 6mm MET-O5-05 REV.4 1070-618
F0015 NA NA NA NA VBT 1070-971
F0006 ACC
18465, 0747
18208, 1948,
F0120-76-CON-M- F0330-76-CON-M-
J203-334 SMAW 18262, 18498, A36 6mm A36 6mm MET-O5-05 REV.4 24170-539
F0011 NA NA NA NA VBT 1070-971
F0007 ACC
18253
18208, 19169,
18434, 1975, F0150-76-CON -M- F0330-76-CON-M-
J203-335 SMAW A36 6mm A36 6mm MET-O5-05 REV.4 1070-636
F0016 NA NA NA NA VBT 1070-971
F0005 ACC
1973, 18424,
18498
QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 6 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:
QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report
18498. 15144,
F0120-76-CON-M- F0330-76-CON-M-
J203-336 SMAW 18263, 18254, A36 6mm A36 6mm MET-O5-05 REV.4 24170-539
F0011 NA NA NA NA VBT 1070-971
F0005 ACC
18165, 18156
1975, 18434,
F0150-76-CON-M- F0330-76-CON-M-
J203-337 SMAW 18424, 18412, A36 6mm A36 6mm MET-O5-05 REV.4 1070-636
F0016 NA NA NA NA VBT 1070-971
F0005 ACC
1973,18156
18498, 15144,
F0120-76-CON-M- F0330-76-CON-M-
J203-338 SMAW 18263, 18254, A36 6mm A36 6mm MET-O5-05 REV.4 24170-539
F0011 NA NA NA NA VBT 1070-971
F0005 ACC
18165, 18156
18239, 18260,
F0142-76-CON -M- F0330-76-CON-M-
J203-339 SMAW 18424, 1973, A36 6mm A36 6mm MET-O5-05 REV.4 1070-606
F0013 NA NA NA NA VBT 1070-971
F0003 ACC
18498
17244,1932,
F0085-76-CON-M- F0330-76-CON-M-
J203-340 SMAW 1941,18946, A36 6mm A36 6mm MET-O5-05 REV.4 1030-468
F0004 NA NA NA NA VBT 1070-971
F0003 ACC
18940,18913
QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 7 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:
QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report
F0085-76-CON-M- F0330-76-CON-M-
J203-344 SMAW 1939,18941 A36 6mm A36 6mm MET-O5-05 REV.4 1030-468
F0004 NA NA NA NA VBT 1070-971
F0001 ACC
QC Engineer