KINGDOMOFSAUDIARABIA Page 1 of 7

Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019


STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:

QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report

F0155-76-CON-M- F0330-76-CON-M-
J203-305 SMAW 18323, 18425 A36 6mm A36 6mm MET-06-95 Rev3 1070-652
F0017 NA NA NA NA VBT 1070-971
F0015 ACC

18263, 18262, F0155-76-CON-M- F0330-76-CON-M-


J203-306 SMAW
18425
A36 6mm A36 6mm MET-06-95 Rev3 1070-652
F0017 NA NA NA NA VBT 1070-971
F0015 ACC

18412, F0155-76-CON-M- F0330-76-CON-M-


J203-307 SMAW
1973,1889
A36 6mm A36 6mm MET-06-95 Rev3 1070-652
F0017 NA NA NA NA VBT 1070-971
F0015 ACC

17382, 1811,
F0175-76-CON-M- F0330-76-CON-M-
J203-308 SMAW 1884, 18425, A36 6mm A36 6mm MET-06-95 Rev3 25710-712
F0021 NA NA NA NA VBT 1070-971
F0019 ACC
18262

F0162-76-CON-M- F0330-76-CON-M-
J203-309 SMAW 18465, 1884 A36 6mm A36 6mm MET-06-95 Rev3 24140-350
F0020 NA NA NA NA VBT 1070-971
F0019 ACC

18465, 0747,
F0150-76-CON-M- F0330-76-CON-M-
J203-310 SMAW 18425, 18913, A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971
F0019 ACC
1973, 18412

18465, 1973, F0150-76-CON-M- F0330-76-CON-M-


J203-311 SMAW
18434,
A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971
F0018 ACC

18465, 0747,
F0150-76-CON-M- F0330-76-CON-M-
J203-312 SMAW 1940, 18260, A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971
F0018 ACC
18498, 184324

Inspection Authority Sign-off:


Prepared By: METSCCO Reviewed By: AICC Reviewed By: KHATIB & ALAMI Reviewed By: SWCC
MURUGANANDAM. G

QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 2 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:

QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report
F0162-76-CON-
18465, 18412, M-24140-350 F0330-76-CON-M-
J203-313 SMAW
18434, 18253
A36 6mm A36 6mm MET-06-95 Rev3 F0020 NA NA NA NA VBT 1070-971
F0017 ACC

F0162-76-CON-
1889, 18253,
M-24140-350 F0330-76-CON-M-
J203-314 SMAW 1940, 18236, A36 6mm A36 6mm MET-06-95 Rev3 F0020 NA NA NA NA VBT 1070-971
F0017 ACC
18260,18398

1991 (SAW) F F0162-76-CON-


SAW M-24140-350 F0330-76-CON-M-
J203-315 SMAW
1884, 1975, A36 6mm A36 6mm MET-06-95 Rev3 F0020 NA NA NA NA VBT 1070-971
F0014 ACC
18253, 1973
18946, 1889,
18263, 18208, MET-06-95 Rev3 F0158-76-CON-M- F0330-76-CON-M-
J203-316 SMAW
18412, 18156,
A36 6mm A36 6mm MET-05-05 Rev 4 1070-672
F0012 NA NA NA NA VBT 1070-971 F0015 ACC
18398

F0162-76-CON-M- F0330-76-CON-M-
J203-317 SAW 18247, 19191 A36 6mm A36 6mm MET-O5-05 REV.4 24140-350
F0020 NA NA NA NA VBT 1070-971
F0016 ACC

18329, 18317,
1884, 18425, F0150-76-CON-M- F0330-76-CON-M-
J203-318 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971
F0013 ACC
18424, 18434,
18462, 18262

Inspection Authority Sign-off:


Prepared By: METSCCO Reviewed By: AICC Reviewed By: KHATIB & ALAMI Reviewed By: SWCC
MURUGANANDAM. G

QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 3 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:

QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report

F0020-76-CON-M- F0330-76-CON-M-
J203-319 SAW 18718, 18598 A36 6mm A36 6mm MET-O5-05 REV.4 24140-350
F0020 NA NA NA NA VBT 1070-971
F0013 ACC

17393, 18317,
1884, 18223, F0150-76-CON-M- F0330-76-CON-M-
J203-320 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971
F0013 ACC
18425, 18913,
18412
F0330-76-CON-M-
F0162-76-CON-M- F0012/
J203-321 SAW 18247, 18739 A36 6mm A36 6mm MET-O5-05 REV.4 24140-350
F0020 NA NA NA NA VBT 1070-971/ F0479-76- ACC
CON-M-1070-1186 F0021
18946, 0747, F0330-76-CON-M-
F0158-76-CON-M- F0011/
J203-322 SMAW 18465, 18260, A36 6mm A36 6mm MET-06-95 Rev3 1070-672
F0008 NA NA NA NA VBT 1070-971/ F0479-76- ACC
CON-M-1070-1186 F0021
18913, 18262
F0330-76-CON-M-
1889, 17393, F0155-76-CON-M- F0011/
J203-323 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-652
F0017 NA NA NA NA VBT 1070-971/ F0479-76- ACC
18260, 18425 CON-M-1070-1186 F0021

F0330-76-CON-M-
1884, 18412, F0156-76-CON- F0010/
J203-324 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-M-661
F0018 NA NA NA NA VBT 1070-971/ F0479-76- ACC
18329, 18946 CON-M-1070-1186 F0021

18946, 18424,
F0330-76-CON-M-
18434, 0747, F0156-76-CON- F0010/
J203-325 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-M-661
F0018 NA NA NA NA VBT 1070-971/ F0479-76- ACC
18465, 18412, CON-M-1070-1186 F0021
18498

Inspection Authority Sign-off:


Prepared By: METSCCO Reviewed By: AICC Reviewed By: KHATIB & ALAMI Reviewed By: SWCC
MURUGANANDAM. G

QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 4 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:

QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report

F0330-76-CON-M-
18465, 18936, F0150-76-CON-M- F0010/
J203-326 SMAW A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971/ F0479-76- ACC
19169, 1940 CON-M-1070-1186 F0021

18254, 18946, F0330-76-CON-M-


F0150-76-CON-M- F0009/
J203-327 SMAW 18476, 18476, A36 6mm A36 6mm MET-06-95 Rev3 1070-636
F0016 NA NA NA NA VBT 1070-971/ F0479-76- ACC
CON-M-1070-1186 F0021
1975, 18263
18946.
19169,
18323,
18412, F0120-76-CON-M- F0330-76-CON-M-
J203-328 SMAW A36 6mm A36 6mm MET-06-95 Rev3 24170-539
F0011 NA NA NA NA VBT 1070-971
F0009 ACC
18913,
18498,
15144

18236, 1889,
F0145-76-con-m- F0330-76-CON-M-
J203-329 SMAW 18208, 18262, A36 6mm A36 6mm MET-06-95 Rev3 1070-618
F0015 NA NA NA NA VBT 1070-971
F0008 ACC
18263

18412,1884,
F0120-76-CON-M- F0330-76-CON-M-
J203-330 SMAW 18398,18424, A36 6mm A36 6mm MET-06-95 Rev3 24170-539
F0011 NA NA NA NA VBT 1070-971
F0008 ACC
18323,18317,

J203-331 SMAW 18225, 18329, A36 6mm A36 6mm MET-06-95 Rev3 F0145-76-con-m- F0015 NA NA NA NA VBT F0330-76-CON-M- F0007 ACC
Inspection Authority Sign-off:
Prepared By: METSCCO Reviewed By: AICC Reviewed By: KHATIB & ALAMI Reviewed By: SWCC
MURUGANANDAM. G

QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 5 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:

QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report
15144, 18424,
18434, 1973, 1070-618 1070-971
18156, 18262

18498, 1973, F0120-76-CON -M- F0330-76-CON-M-


J203-332 SMAW A36 6mm A36 6mm MET-06-95 Rev3 24170-539
F0011 NA NA NA NA VBT 1070-971
F0007 ACC
18465, 1945

18165, 18498,
F0145-76-con-m- F0330-76-CON-M-
J203-333 SMAW 18412,18208, A36 6mm A36 6mm MET-O5-05 REV.4 1070-618
F0015 NA NA NA NA VBT 1070-971
F0006 ACC
18465, 0747

18208, 1948,
F0120-76-CON-M- F0330-76-CON-M-
J203-334 SMAW 18262, 18498, A36 6mm A36 6mm MET-O5-05 REV.4 24170-539
F0011 NA NA NA NA VBT 1070-971
F0007 ACC
18253

18208, 19169,
18434, 1975, F0150-76-CON -M- F0330-76-CON-M-
J203-335 SMAW A36 6mm A36 6mm MET-O5-05 REV.4 1070-636
F0016 NA NA NA NA VBT 1070-971
F0005 ACC
1973, 18424,
18498

Inspection Authority Sign-off:


Prepared By: METSCCO Reviewed By: AICC Reviewed By: KHATIB & ALAMI Reviewed By: SWCC
MURUGANANDAM. G

QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 6 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:

QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report

18498. 15144,
F0120-76-CON-M- F0330-76-CON-M-
J203-336 SMAW 18263, 18254, A36 6mm A36 6mm MET-O5-05 REV.4 24170-539
F0011 NA NA NA NA VBT 1070-971
F0005 ACC
18165, 18156

1975, 18434,
F0150-76-CON-M- F0330-76-CON-M-
J203-337 SMAW 18424, 18412, A36 6mm A36 6mm MET-O5-05 REV.4 1070-636
F0016 NA NA NA NA VBT 1070-971
F0005 ACC
1973,18156

18498, 15144,
F0120-76-CON-M- F0330-76-CON-M-
J203-338 SMAW 18263, 18254, A36 6mm A36 6mm MET-O5-05 REV.4 24170-539
F0011 NA NA NA NA VBT 1070-971
F0005 ACC
18165, 18156

18239, 18260,
F0142-76-CON -M- F0330-76-CON-M-
J203-339 SMAW 18424, 1973, A36 6mm A36 6mm MET-O5-05 REV.4 1070-606
F0013 NA NA NA NA VBT 1070-971
F0003 ACC
18498

17244,1932,
F0085-76-CON-M- F0330-76-CON-M-
J203-340 SMAW 1941,18946, A36 6mm A36 6mm MET-O5-05 REV.4 1030-468
F0004 NA NA NA NA VBT 1070-971
F0003 ACC
18940,18913

Inspection Authority Sign-off:


Prepared By: METSCCO Reviewed By: AICC Reviewed By: KHATIB & ALAMI Reviewed By: SWCC
MURUGANANDAM. G

QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.
KINGDOMOFSAUDIARABIA Page 7 of 7
Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019
STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:

QR No.: NDE-1711-T389-F0003
Non-Destructive Examination (NDE) SUMMARY QR Date: 19 / NOV / 2019
Mfr. Eq. No.: TK-393 (TK-03) Item: BOTTOM PLATES LONG SEAM JOINTS JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Welder/s
Joint No. Weld Type WPS No. RT RT
ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report

F0142-76-CON -M- F0330-76-CON-M-


J203-341 SMAW 18434, 18412 A36 6mm A36 6mm MET-O5-05 REV.4 1070-606
F0013 NA NA NA NA VBT 1070-971
F0002 ACC

15144,18913, F0085-76-CON-M- F0330-76-CON-M-


J203-342 SMAW A36 6mm A36 6mm MET-O5-05 REV.4 1030-468
F0004 NA NA NA NA VBT 1070-971
F0002 ACC
18498

18208, 18165, F0142-76-CON -M- F0330-76-CON-M-


J203-343 SMAW A36 6mm A36 6mm MET-O5-05 REV.4 1070-606
F0013 NA NA NA NA VBT 1070-971
F0001 ACC
18156

F0085-76-CON-M- F0330-76-CON-M-
J203-344 SMAW 1939,18941 A36 6mm A36 6mm MET-O5-05 REV.4 1030-468
F0004 NA NA NA NA VBT 1070-971
F0001 ACC

Inspection Authority Sign-off:


Prepared By: METSCCO Reviewed By: AICC Reviewed By: KHATIB & ALAMI Reviewed By: SWCC
MURUGANANDAM. G

QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.