This document outlines the schedule and equipment needs for a concert featuring Mr. Mikha and Mr. Roni. It includes a rehearsal schedule on Sunday with setup, sound checks, and band rehearsals. On Monday there is more sound checking, decorating, solo and group rehearsals. The concert begins at 7pm Monday evening, requiring lighting and sound equipment.
This document outlines the schedule and equipment needs for a concert featuring Mr. Mikha and Mr. Roni. It includes a rehearsal schedule on Sunday with setup, sound checks, and band rehearsals. On Monday there is more sound checking, decorating, solo and group rehearsals. The concert begins at 7pm Monday evening, requiring lighting and sound equipment.
This document outlines the schedule and equipment needs for a concert featuring Mr. Mikha and Mr. Roni. It includes a rehearsal schedule on Sunday with setup, sound checks, and band rehearsals. On Monday there is more sound checking, decorating, solo and group rehearsals. The concert begins at 7pm Monday evening, requiring lighting and sound equipment.
No Pukul/Hari Nama Kegiatan Konsep Durasi Peralatan 1. Minggu, Loading sound dan setting Masukkan 1 jam 15.00-17.00 lighting sound - keruangan 2. 17.00 s/d selesai Setting Menyiapkan 1 jam panggung/dekorasi kursi untuk 10 stand book pemain orkes 3. 18.00-19.00 Sound cek/latihan orkes Latihan orkes 1 jam Lighting 4. 19.00-20.00 Sound cek band Latihan 1 jam lighting trio/latihan 5. 20.00-21.00 Full band Latihan 1 jam Lighting 6. 21.00-21.30 Break Makan/bersih- 30 mnt bersih - 1. Senin, Cek alat sound 2 jam Sound 08.00-10.00 2. 10.00-12.00 Dekorasi 2 jam Dekorasi 3. 12.00-13.00 Makan siang 1 jam Konsumsi 4. 13.00-14.00 Cek sound solo (Mikha) Solo piano 1 jam Piano 5. 14.00-16.00 Solo (Roni) and band band 2 jam band 6. 16.00-17.00 Ansambel strings + piano Ansambel 1 jam 7. Ansambel strings + saxo Ansambel 8. Trio piano Trio 9. 17.00-18.00 Makan malam & pemain 1 jam - prepare 10. 18.30 Open gate 11. 19.00 s/d selesai Acara