[Type the document title] [Pick the date]

A.B.C
Technologies Pvt. Ltd

XYZ Department of Sales and Distribution


Point of Sale Software Development
Solicitation Number: 123-rt-4566

Submitted to:
Contract Officer – Mr. George Orwell
Email: gorwel@mail.com

Offeror:
A.B.C Technologies Pvt. Ltd.
12-40 Unknown Street Neverland, Building 404, US
www.abc.com

DUNS: 123456789
CAGE CODE: 12345

Note: Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Maecenas porttitor congue
massa. Fusce posuere, magna sed pulvinar ultricies, purus lectus malesuada libero, sit amet
commodo magna eros quis urna. Nunc viverra imperdiet enim. Fusce est. Vivamus a tellus.
Pellentesque habitant morbi tristique senectus et netus et malesuada fames ac turpis egestas.
ultricies, purus lectus malesuada libero, sit amet commodo magna eros quis urna. Nunc viverra
ABC Technologies Pvt. Ltd 17-May-2020
12-40 Unknown Street Never land, Building 404, US

Table of Contents
1. SUMMARY.........................................................................................................2

2. Key Personnel......................................................................................................2
3. Technical Approach.............................................................................................3
3.1.Software Development Methodology............................................................3
3.2.Requirement Analysis....................................................................................4
3.3.Planning..........................................................................................................4
3.4.Design............................................................................................................4
3.5.Coding............................................................................................................4
3.6.Testing............................................................................................................4
3.7.Deployment....................................................................................................4
3.8.Maintenance...................................................................................................4

Figure 1: Software Development Lifecycle..............................................3


ABC Technologies Pvt. Ltd 17-May-2020
12-40 Unknown Street Never land, Building 404, US

SUMMARY
A.B.C Technologies Pvt. Ltd is sincerely pleased to submit Awards and Accolades
the response for Solicitation Number: 123-rt-4566 required
by XYZ Department of Sales and Distribution for  Awarded the Techno
Giant of the Year
development of Point of Sale software. 2015.
 Named the most
A.B.C Technologies Pvt. Ltd is driven by technologically influential
driven individuals with accumulated experience of over 40+ technological
enterprise in 2016.
years. Our expertise in development of PoS software’s is  Awarded, “Break
backed by the incorporation of highly advanced and relative -through technology
technology focused on delivering value. We at A.B.C of the year 2018” for
ABC PoS Pro
Technologies recognize the need for constant improvement  Awarded the Techno
in technologies used in the development of PoS software’s. Giant of the Year
A.B.C Technologies understands the PoS needs of clients in 2019.
 Named as One of the
a better manner, hence outlining work-flows that result in most preferred place
impeccable outcomes. of work in the,
“Technocrat Annual
Team A.B.C Technologies strives to provide best value. Magazine
Our solution will not only enhance and simply the
transactions made on day-to-day basis, but further provide
room for improvements that might be needed in the future.

Key Personnel

Name Designation Experience Expertise


ABC Sr. Software Developer 10 Years .NET,JAVA,Laravel
DEF Sr. Software Developer 12 Years .NET,JAVA,Laravel
GHI Graphics Designer 5 Years Adobe Tools
JKL Tester 10 Years .NET,
Selenium,Ranorex
MNO Program Manager 5 Years Six Sigma Certification
Table 1: Key Personnel

ABC Technologies shall assign a team of 3 developers along with a testing specialist to work on
the solution and a Program Manager to communicate all the relevant and necessary detail with
the representatives of Agency.
ABC Technologies Pvt. Ltd 17-May-2020
12-40 Unknown Street Never land, Building 404, US

Technical Approach

Our technical approach demonstrates the succinctly outlined plan towards the fulfilling XYZ PoS
requirements that is utmost feasible. Team ABC Technologies acknowledges that solution of
such nature must be proactive and flexible to accommodate improvements in future. As such we
propose traditional SDLC, yet incorporating innovative work-flow approach to culminate the end
product.

Software Development Methodology

Requirement Planning Design


Analysis

Testing Coding

Maintenance

Figure 1: Software Development Lifecycle

The proposed PoS software shall be developed by adhering to traditional SDLC, which includes
the following steps:

 Requirement Analysis
 Planning
 Design
 Coding
 Testing
 Deployment
 Maintenance
ABC Technologies Pvt. Ltd 17-May-2020
12-40 Unknown Street Never land, Building 404, US

Requirement Analysis: This phase shall focus on the requirements outlined by the agency. It
covers the financial feasibility of the project and coding it into a real working program.

Planning: This step involves answering the question, “How will we get what we want?” At this
phase of the SDLC, things start by turning the software specifications into a design plan called
the Design Specification. The program manager shall get in touch with the agency to have
inputs on various relevant and important aspects.

Design: This portion of the SDLC is concerned with the design of the PoS solution. It decides on
the appearance of the UI. All the designing activities shall be communicated from Designer and
Program Manager to the Agency.

Coding: At this step, the prime focus is on the functionalities of the product i.e. the functions
that the program is supposed to perform in a real operational environment. Our team of
developers shall adhere to sequential steps to complete the entire coding process.

Testing: The proposed Testing approach shall be of Module Testing. Our testing team shall test
the each component of the PoS Solution to ensure we have built the right thing.

Deployment: The PoS solution shall be handed over to the agency after prior testing. Agency
shall be provided with documented information of the product, furthermore, a demonstrative
session shall be held to impart knowledge on the Training In-charges’ of the Agency

Maintenance: This portion addresses the following issues:


 Bug fixing - bugs are reported because of some scenarios which are not tested at all
 Upgrade - Upgrading the application to the newer versions of the Software
 Enhancement - Adding some new features into the existing software