i sygsK Installation & operation manual of 500KV transformer
1. GENARAL DESCRIPTION
9 . ELSE
/ -* \
•
f b
TSE/I mmmiL Installation & operation manual of 500KV transformer
f
1. General Description
Type of transformer: Power Auto-transformer with Single Phase and OLTC (off-circuit
tap-changer)
Range: Out door, HV 500kV
Tiptop work voltage: HV 500 / V 3 ± 8 X 1. 25%kV, LV 220/ V 3kV, Tertiary 22 kV
Height: < 1000m
Environment temperature: -10 °C ~ 50 °C
Cooling: ONAN/ONAF1/ONAF2 (62.5%/80%/100%)
Coolers number: 20units (2 sets for standby)
Structure description: ( 500 kV series winding terminal is OLTC , rated frequency 50Hz.
Core type , cylindrical tank , 500 kV is leading at the middle. The HV terminal should
be wrapped at insulation cylindrical for meliorate the electric field and insurance the
insulation strength. The instruction contains the transportation, acceptance,
installation, maintenance and other technical requires. Please refer to the drawings to
check the outline instruction and installation dimension.
2.1 The transformer is cylindrical type tank , the outline drawing shows the upper part
of tank and lifting of the main body. Lift main body with all the main lifting lugs.
Each sling shall bear equal force to prevent the main body overturn. The bearing
plate for jacks should be used to withstand the main body, all jacks should be
used when sling the main body, jacks should operate at the same and even
v speed to prevent main body inclining and rolling.
2.2 The main body transported with nitrogen, the large discreteness which should be
dismantled are: HV bushing, LV bushing, tertiary bushing, natural bushing,
coolers and connected oil ducts, tuber connecter of gas, control box
i
pressure-relief valve, conservator and ascending flanged base. The main body
transport without oil, only a little rudimental oil at the bottom of tank, fill with dry
nitrogen with air pressure is 19.6-29.4kpa , hallmark>99.99%, dew point < -40 °C .
The nitrogen pressure can’t less than 9.8kpa on the transport, and fill the
qualified nitrogen above at any moment.
2.3 Transportation requirements
2.3.1 For transformer loading, unloading, driving on road and pulling to the
foundation, the vibration and bumpiness shall not exceed 3g in longitudinal 2.5 g
in perpendicularity; the inclination angle along long axis shouldn’t exceed 15 ,
and 10 0 along short axis.
°
-2-
TBEJI mmmx Installation & operation manual of 500KV transformer
3.2.2.2 Requirement of nitrogen storage for pressure of main body and fill up
nitrogen, according to the instruction of 2.2.
3.2.2.3 Check nitrogen pressure more than 2 times everyday. Record the
pressure in the tank and fill up nitrogen. If nitrogen pressure decreases rapidly,
nitrogen wastage is large, there is leakage, Check immediately to prevent moistened.
3.2. 3 For transformer stored with oil
Stored more than 3 months or not satisfied clause 3.2.2.1, the transformer shall
be filled up with oil for storage .
3.2.3.1 Check according to 3.2.1.1 before fill up oil and remove nitrogen, remove
waste oil and dirt inside tank . Waste oil can’t be used in transformer once more.
3.2 . 3.2 Fill up oil and remove nitrogen: open up the DN100 copper butterfly valve
r
on tank cover (prevent dust from entering the tank) to remove nitrogen, transformer
oil should be filled from the DN100 copper butterfly valve at the tank bottom and any
flange hole installing cooler, oil should accord to the requirement below:
nitrogen pressure: 60KV(Standard Oil Vase Test)
water content:
^
gas content:
^ 10ppm .
<2 %
tg 6 (90 °C ): <0.5%
3.2.3.3 Check further if the transformer is moistened after leaving the factory.
The standard indicates the transformer is not moistened (test with oil) is , winding
to winding and winding to earth:
insulation resistance R6o ,
^ 70% of factory routine test (2500V megger )
absorptance” R 60/Ri 5 “ : T* 70% of factory routine test, and on less than 1.5(2500V
{ megger )
dissipation factor (tan5): <130% of factory routine test , (the same temperature )
(If not satisfied the standard above , "it indicates the transformer is moistened, the
product can ’t be run, it shall be drying treated and communicate with the
manufactory.)
3.2.3.4 Setting the temporary conservator system, adding oil spiccato, adjust the
oil level to little higher of the conservator normal oil level, and release the gas of the
conservator according to the instruction of the conservator.
3.2.3.5 Check the cover of the conservator usually while storage, if lower the
lowest level of the conservator, fill qualified oil accord with clause3.2. 3.2 to prevent
moistened .
3.2.4 Be well arranged the cannibalize fittings, prevent from rust and dirt, the
cannibalize fittings transported with oil must be stored in oil.
[
-4-
THEM mmmix Installation & operation manual of 500KV transformer
-6-
nse#a mmmT. Installation & operation manual of 500KV transformer
f
connecting to the vacuum pump, then open the butterfly valve which connect the
main body and the conservator, keep filling qualified oil accord with clause 6.1.1
by Vacuum Hot Line Oil Purifiers, the conservator oil level should be little higher
the normal level under the oil-curve.
6.4.2 Tightness test will be done after oil filling under vacuum
6.4.2.1 Test with static oil method, the oil is 8m-8.5m high, Keep internal static oil
pressure for 12 hours for leakage test.
6.4.2.2 Or test by oil pump: fill oil with Vacuum Hot Line Oil Purifiers , Keep
internal pressure of tank being 24-29kPa for 12 hours for leakage test.
6.4.2.3 All the two methods above should close the vacuum butterfly valves
connected the conservator, conservator can’t be test. (Keep conservator
nitrogen pressure of 0.02- 0.03MPa for 12 hours for leakage test .)
]
6.4. 3 Open the vacuum butterfly valves connected the conservator and main body
of transformer, transformer shall be placed quietly for 72 hours without leakage.
Then open all the butterfly valves to release gas, conservator operated accord
with the instruction.
6.4 .4 Transformer mustn’t be imposed voltage until placed quietly for more
than72hours.
-8-
TBEJI mmmi: Installation & operation manual of 500KV transformer
- 10 -
TBEA mmmJL Installation & operation manual of 500KV transformer
\
. {. J
10.5 During normal operation, insulation plate shall be located between the two
bushings of tertiary winding. Insulating plate assembly is shown in Fig. 2.
10.6 The installation position of surge arrestors for spare transformer and LOT1
transformer is shown in Fig.3. When the spare transformer is used for
replacement, a transition supporting frame shall be added between the surge
arrestor and the base plate. The arrestor shall be insulated according to
Fig 1.
10.7 During installation, lifting and handling, the force imposed on the connecting
aluminum pipe shall be uniform and avoid any crash, bending and insulation
failure.
- 12 -
Installation I operation manual of 500EV transformer i ITT.. 710.30099.4 SM
I
- i
>W» >tWlV« tW»
^V V>W%VWyW«ilv » »>*>%»yWteWW\<VWW y» MT4WWVm<H »W\WWMI
^ * *
I Total 1? ! Page 13
;
/
CiiDtcitor iif© : fin
lArreBior
Line terminal for aluminum bus bar # X (i ;•
*~r >
;c c H5
Earthing tarmisai for copper shield -^
C s
Capacitor »:o earth J ... . '"
•••• tapper)shield to earth
X? O
X
N
#
\
V
;
Connection cable 2/ Arrestor to earth
£ JA .
« , i. ,v. A,
A
A A. i fLS 1- Ul
ts s?
!
r
$
t
;
Fig, 1 firing diagram for tertiary winding(transformer used for replacement)
Notes:
connecti ng cable 1: between bushing and gorge arrestor connecting cable- 2: between arrestor mi capacitor
arrestor to ground: when the eartiling cable led oat through the hole h the bos cover, the arrestor am the fixing supporte
r on the tank cover
5
ahsII be kmkled. the insulating parts are sbo»n in Fig,2
!
\ ;
X / i
Bf - j ;
ii
Fixing if ; te for box wall I
$
:
l
Insulating plate
m 5 |
AL A r
t isg part 2 for base plate
XIbase plate
] w2 \w
Fixing part 1 for base plater
Fixing part 1 for base plate
\ base plate
Fixing part 2 for base plate
Fig. 211 lustralive diagram for insulation assembly along bushings of tertiary bushing
i
For LOT 1
Location for Used for replacement
i
T
Location for
surge arrestor
Loca tion for surge arres tor
TBE/I mmmjL Installation & operation manual of 500KV transformer
I
Transportation ( main body with nitrogen) according to iteml
I
Acceptance (according to item 2.1 ) Check
if moisten in the transportation (according to Moist
item 2.2.1.1)
Un-moist
1r
i7
- 14 -
V •
afcmtfjg
•
The installation progress at site and required tools and devices list for 500KV transformer
Loading
Main Working days(for reference)
Item Main Tools &
No.
Items inspection 1 2 2 2 2 3
contents Equipment 1-9 10 11 12-13 14-15 16-18
2
25-32
3
35-37 38-39 40 Remarks
items 9 0 1 2 3 4 3 4
Prepare the
Check the
installation
Preparation horizontal Installation Mi
1 for
installation
equipments,
tools, materia !
level
foundation
of equipments
level gauge
& *
and temporary
(rail)
equipments
Jack, tracking
Check the
and lifting
Put the main position of
Fix the equipment,
2 body on the main body
transformer rolling pole,
foundation, and nitrogen
pressure
pressure
indicator
See item 2.1.3
Check the
and 2.1.4 and
amount the Crowbar, saw,
Check the check if any
3 accessories and pliers , camera
boxes disfigurement
check the and etc.
on the
appearance
appearance
Mechanical
property and
alarm conditions Gas
Oil
Check the
of oil-level relay
treatment indicator of Oil container, oil must be
performance of
4 and relays, oil flow pipes line, oil m tested in
accessories,
accessories meter , filter drying air , related
oil treatment
inspection thermometer, laborato
electrical ry
performance of oil
in bushing.
Binding the Installation Jack, lifting
scaffold, install position and gourd by hand,
Installation
of
the bogie, seal crane, 6#and 8#
the
5 conservator , performance, torque wrench, &
auxiliary
cooler and oil check the electric and
parts
pipes line, position of water welding
press-relief valve auxiliary parts device
- 15 -
I EfeflZ# l JL Installation & operation manual of 500KV transformer
Main Working days(for reference)
Item Loading Main Toois &
No.
Items inspection
contents Equipment 1-9 10 11 12-13 14-15 16-18
1 2 2 2 2 2
25-32
3
35-37 38-39 40 Remarks
items 9 0 1 2 3 4 3 4
Filling oil and Check if the exhausting
Draining oii exhausting oil pipes line is Oil container, oil nitrogen,
.
r.
9
connector
Installation
of control
Install
lines of the
control box
the
connector and
Pliers,
screwdriver,
spanner,
m
box
Close the valve
Leakage Pump or
10 of relay See item5.4
test vacuum oil filter
connector
Oil-level
indicate
Adjust the regulate to Thermometer,
11 Fill or drain oil m
oil level more than 5°C . vacuum oil filter
of the true
temperature
- 16 -
r \
\
/
Testing and
Related test
Inspection
12 See item6 See Item 6 equipments and
Before
power
operation
Dismantle the
scaffold and Ejection gun
13 Patch paint
others, patch paint
paint
Reference method: Check if there are leakage on the connector when vacuumize. Make the smoke of anti-mosquito incense move slowly
around the flange. Use a plate to prevent the smoke from diffusing when check the top and make the smoke around
the flange. If the smoke enters the connector, then the flange is leakage. Or if there are some noisy, the flange is
leakage.
Reference equipment specification: Vacuum pump outlet air capacity>150L/S, the residual pressure< 3Pa.
heating temperature of vacuum filter >60 °C , oil flow capacity > (8-10)t/h, dehydration capacitydOppm,
degas capacity< 0.1%, the weight of lifting >200t, the height of lifting> 12m.
hydraulic pressure Jack 50t .
- 17 -