Professional Documents
Culture Documents
Bi-Senaraisemak PB PDF
Bi-Senaraisemak PB PDF
2-2015
Application Title :
Applicant’s Name :
Applicant’s Address :
Architect/Consultant
Engineer’s Name :
Consultant Address :
1
(MPN/B/KP-04-01)rev.2-2015
Vol Item Applicant Office
(√) (√)
1. 4 set of A1 size plan ( 1 set of linen entirely
coloured + 3 set of papers with only the site plan
is coloured ) should include :
2
(MPN/B/KP-04-01)rev.2-2015
Vol Item Applicant Office
(√) (√)
3
(MPN/B/KP-04-01)rev.2-2015
Vol Item Applicant Office
(√) (√)
6. The Building plans scale must be in the scale of 1 :
100 ( Scale 1 :150 may be allowed depending on the
suitability of the building)
4
(MPN/B/KP-04-01)rev.2-2015
Vol Item Applicant Office
(√) (√)
20. The gate height for the housing area type should be
less than 1,500mm
21. The open area for housing lot and the street line as
well as the current hill slope that has been levelled, a
spot turfing should be provided..
23. For certain type of stair, the height for the stair should
not more than 180 mm and the step is less than 255
mm.
26. The facility for the disable person such as the toilet,
ramp (1:20) and parking lot should be provided
5
(MPN/B/KP-04-01)rev.2-2015
Vol Item Applicant Office
(√) (√)
30.1 The porch roof projection need to be above the
border line of the facing lot under the condition
that the lighting/ventilation from above has to
be provided with a minimum of 5% from the
overall porch roof
6
(MPN/B/KP-04-01)rev.2-2015
Vol Item Applicant Office
(√) (√)
7
(MPN/B/KP-04-01)rev.2-2015
APPLICATION FOR NEW FACTORY AND ADDITIONAL FACTORY PLEASE
COMPLY THE FOLLOWING ADDITIONAL RULES
Vol Item Applicant Office
(√) (√)
34. Only one entrance is allowed for each factory lot
except if its involved more than 2 acres of ground
area
8
(MPN/B/KP-04-01)rev.2-2015
FOR THE TRANSMISSION TOWER APLLICATION THE FOLLOWING
ADDITIONAL RULES SHOULD BE FOLLOWED
9
(MPN/B/KP-04-01)rev.2-2015
Applicant Office
Vol Item (√) (√)
50. For the soil surface exposed due to the construction
works, the stability measure should be taken
immediately to avoid from any erosion.
Description:-
i)The distance measurement in this schedule is
designatedin order to ensure the minimum distance to
meet the aesthetic requirement and also to ensure
the safety of the building resident (for example
preventing the equipment tools from falling out from
the tower, and not because of the sun ray from the
tower as the level of the ray is low. This measurement
10
(MPN/B/KP-04-01)rev.2-2015
is based on the standard of Regulatory Framework
On The Sharing Of Radiocommunications
Infrastructure (REG-R002) Telecommunication
Department Malaysia, 1st August 1998).
11
(MPN/B/KP-04-01)rev.2-2015
12
(MPN/B/KP-04-01)rev.2-2015
………………………………
Applicant
Name :
Registration No. :
Official Stamp :
Name of Recipent :
Position :
Date :
13
(MPN/B/KP-04-01)rev.2-2015
14