Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Attachment B

FORM JKT/B/BT/1
CONFIRMATION OF 60% USAGE OF LOCAL MATERIAL DURING PLAN
APPROVAL APPLICATION

Date : ……………………

Yang DiPertua
Nilai Municipal Council
No. 1, Komplek Pentadbiran Kerajaan
Persiaran Pusat Bandar, Putra Nilai
Peti Surat No.52, 71800 NILAI

*I / we certify and agree to take full responsibility to ensure that the construction
works of a building / buildings which is
……………………………………...…………………..................................................
……………………………………………………………………………………………...
at *Lot/lot-lot...…………………………………………………Section…………………
Road ……………………………………………………………..………………………..
For……………………………………………………………………………………….....
will be using at least 60% of the local materials. The percentage estimation of the
material used is as per detached Attachment B1

………………………………
Applicant

Name : …………………………………………………………………….
Address : …………………………………………………………………….
Registration No. : …………………………………………………………………….
Class : …………………………………………………………………….
Attachment B1
FORM JKT/B/BT/1-A
THE PERCENTAGE ESTIMATION OF LOCAL MATERIAL USAGE

Project:
……………………………………………………………………………………..............
………………………………………………………………………………………………
………………………………………………………………………………………………
*I / we confirmed that the percentage estimation of the local material based on
the cost that will be used for the above project are as follows:

Basic Material Finishing M&E Equipment Overall


(brick, sand, iron, Material (Wiring, lift, (weighted
wood, tiles, etc.) (paint, sanitary escalator, air- average)
fittings, floor tiles, conditioning, etc.)
carpet etc.)

Local Material: Local Material: Local Material: Local Material:


% % % %

Below is the list of material / equipment that is required to be imported due to the
reasons;
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………

………………………………
Applicant

You might also like