Professional Documents
Culture Documents
Lesson Plan Information Sheet: General Review of The MPM Version Date: 07/30/2012
Lesson Plan Information Sheet: General Review of The MPM Version Date: 07/30/2012
Lesson Overview:
This lesson details how to perform an in-depth review of the AMO Procedure Manual.
Visuals:
SL05-1-MPM through SL05-29-MPM
Training Aids:
N/A
Other Files:
Date Revision
Description of Changes: Change Person:
Revised: No.:
Updated template to conform to current AFS 500 Style Guide
01/2011 2.0 Serco CTR
version.
Updated graphics and ppt. template to a more current
01/2011 2.0 Serco CTR
theme.
01/2011 2.0 Updated references according to latest version of MCARS Serco CTR
07/2012 2.1 Updated MCAR references using version 2.6 dated Nov 2011 S. Wagner
I. Introduction .......................................................................................... 5
A. Review ............................................................................................. 5
B. Purpose............................................................................................ 5
C. Objectives ........................................................................................ 6
D. Overview .......................................................................................... 7
II. Body ..................................................................................................... 8
A. Using the Statement of Compliance ................................................... 8
B. MPM Structure ................................................................................. 11
C. The MPM Review ............................................................................. 16
D. MPM Subjects .................................................................................. 28
III. Summary ............................................................................................. 32
A. Review ............................................................................................ 32
B. Objectives ....................................................................................... 33
C. Mastery Test ................................................................................... 33
D. Preview ........................................................................................... 34
I. INTRODUCTION
SL-1-MPM
A. REVIEW
B. PURPOSE
C. OBJECTIVES
SL-2-MPM
D. OVERVIEW
SL-3-MPM
The Documentation Phase
• Manual Control
• Manual Introduction
• List of Effective Pages
• Record of Revisions
• Organisational Structure
• Duties and Responsibilities
• Instructions for Reviewing the MPM
II. BODY
SL-4-MPM
Using the Statement of Compliance
Statement of Compliance
IML MPM
Pages 15-22
(a) In accordance with MCAR Part 6, all precision inspection and test
equipment used in this AMO shall be checked at regular intervals and
reset, re-calibrated, or reworked as necessary to assure correct
calibration, and no personal precision measuring equipment is
allowed. Procedure is located in secondary level manual, MOE
section 1.2.2.
B. MPM STRUCTURE
SL-6-MPM
MPM Structure
Part I Management
Part II Maintenance
Part IV Documentation
Part V Appendices
1. Administrative Requirements
SL-7-MPM
AMO Organizational Chart
SL-9-MPM
Administrative Requirements
Training:
– Initial
• All Staff
• Additional for Certifying Staff
– Continuation
• All Staff
• Certifying Staff
– Human Performance
• All Staff
SL-11-MPM
SL-12-MPM
Sample MPM Format
Part V Appendices
Part IV Documentation
Part I Management
12
SL-13-MPM
Policy or Procedure?
13
WHAT
What is the policy about?
14
SL-15-MPM
Policy Review
WHY
Why do you do it in this way?
15
1. Procedure Review
SL-16-MPM
Procedure Review
WHERE
Where will the procedure be accomplished:
16
SL-17-MPM
Procedure Review
WHEN
When will the procedure need to be accomplished:
Calendar
Hours
Cycles
17
SL-19-MPM
Procedure Review
WHO
Who is responsible for the task?
19
2. Knowledge Check
SL-20-MPM
Answ er:
Answ er:
Question:
In reviewing any manual, a policy and/or
procedure should tell the ______, ______,
______, ______, ______, and, ______.
Answ er:
SL-23-MPM
General Subject Titles
23
• Table of Contents
• List of Effective Pages
• Record of Revisions Page
Control Pages
• Contents page
• Records of revision
• List of effective pages
24
25
Ratings Requested?
Performance of maintenance specific to the AOC
that the AMO is associated with?
Is AMO intended to contract out maintenance to
other organisations, approved or not?
Manufacturer's repair, overhaul, and
calibration instructions?
26
D. MPM SUBJECTS
• Manpower resources
• For the scope of work
• Compare to ratings requested
• Manual revisions
• Notification procedure to the Authority
regarding changes to the organisation’s
activities, approval, location, and personnel
1. Group Activity
Estimated Time:
Total Time = 30 minutes (20 minutes to complete
the activity and 10 minutes to debrief)
Materials Needed:
• AMO-MD
• AMO-MPM
• MCAR Part 6 and IS Part 6
Purpose:
This Group Activity benefits participant learning
because it:
• Provides a partial review of the AMO formal
application process early in the course.
• Defines the role of the CAA certification team
and the role of the PM.
• Models desired inspector conduct through the
use of material review scenarios.
• Provides practice in conducting a structured
meeting that results in CAA action.
Directions:
• This exercise requires the class to be divided
into two groups.
III. SUMMARY
SL-27-MPM
Summary
Using the Statement of Compliance
MPM Structure
MPM Subjects
28
A. REVIEW
B. OBJECTIVES
SL-28-MPM
C. MASTERY TEST
Estimated Time:
Total Time = 1 hour (40 minutes to complete the
test and 20 minutes to debrief)
Materials Needed:
• AMO Lesson 5 Mastery Test (student copy)
• AMO Lesson 5 Mastery Test Answer Key
(instructor copy)
• AMO-MD
• AMO-MPM
Directions:
• Students are to evaluate the Introduction and
Sections I-IV of the applicant’s MPM. Are the
following MCARs identified as either policy or
procedure?
Debrief:
• Review students’ answers and discuss why
they are acceptable or unacceptable.
D. PREVIEW