Professional Documents
Culture Documents
Initial Environmental Examination (Iee) Checklist: 1. General Information
Initial Environmental Examination (Iee) Checklist: 1. General Information
1. GENERAL INFORMATION:
(Attach location map with important landmarks and access points indicated as Annex 1)
Page 1 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
2. PROJECT DESCRIPTION
a. Water demand
Estimated daily water requirement of the proposed or existing project : _______ cu. M
per day
b. Water supply/sources
Existing public water supply []
Surface water
Volume of
Water Source Name of water Location Distance Mode of extraction
body (km) dev’t/ (cu. M/ day)
Page 2 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
distribution
1. Creek
2. Spring
3. Stream
4. River
1. Others,
specify
_____________
__
Deep well
Rainwater
Collection and storage No. of tanks/reservoir Capacity
1. Collected in storage tanks
2. Collected in Reservoir
a. Water Treatment
If your water supply sources are surface water, deep well or rainwater, will there be
water treatment?
[ ] yes [ ] no
Page 3 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
Sewage disposal
[ ] Discharge to an existing public sewerage system
[ ] Treated in a community disposal plant or communal septic tank
[ ] Treated in individual septic tanks with disposal by absorption field or leaching
pit
[ ] Others, please specify: _____________________________________
Disposal system
[ ] open dumpsite outside of the project area
[ ] municipal/city landfill area
[ ] Others, specify: _______________________
Page 4 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
Page 5 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
6. Air Conditions/Quality
[ ] good [ ] fair [ ] poor
7. Are there existing water bodies within If yes, indicate the name
1.5 km of the proposed building, e.g. and distance of the water
creeks or streams? body.
Page 6 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
___________________
___________________
___________________
16. What is the present land use of the Indicate the present land
area? use within:
[ ] prime agricultural land (productive) 50 m radius
[ ] prime agricultural land ( idle or 100 meter
abandoned) radius
[ ] grassland 200 meter
[ ] built-up (commercial, industrial) radius
[ ] built-up (residential)
[ ] orchard
[ ] marshland/mangrove
[ ] others, specify :
_______________
Page 7 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
22. Are there existing trees and other If yes provide examples:
types of vegetation in the site
23. Are there birds and other forms of If yes provide examples:
wildlife found in the area and which
has significant value
24. Are there fishery resources in the If yes provide examples:
water bodies near or within the site?
25. Are there existing settlement in the If yes, indicate the number:
proposed project site who will be Households: _____
affected? Legitimate landowners: _
Tenants: ____________
Squatters: ___________
Page 8 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
Page 9 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
Page 10 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
Page 11 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
Page 12 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
6. PROPONENT’S COMMITMENTS
Page 13 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
ACCOUNTABILITY STATEMENT
This is to certify that all the information and commitment in this Initial Environmental
Examination (IEE) Checklist are true, accurate and complete. Should I/we learn of any
information which would make the IEE more accurate, I/we shall bring the said information to
the appropriate EMB DENR Regional Office.
I/We hereby bind myself/ourselves jointly and solidarily for any penalties that may be
imposed from any misrepresentations or failure to state material information in the IEE.
In witness whereof, I/we hereby set our hands this ______ day of
_________________________ at ____________________________.
______________________
Project Proponent
______________________
Title/Designation
ACKNOWLEDGMENT
___________________________
Notary Public
Page 14 of 15
IEE CHECKLIST for
Buildings with 4 to 10 Stories
SUPPORTING DOCUMENTS:
i) Letter request []
ii) Locational Clearance []
iii) Site Development Plan []
(showing all project facilities)
iv) Colored pictures (panoramic view) []
(preferably with captions)
v) CENRO certification as to the land []
classification
vi) Proof of social acceptability
a) Barangay Resolution []
b) City/Municipal Resolution
vii) Topographic Map []
viii) Approved Sketch Plan and Vicinity Map []
within 500 meters influence area
ix) Photocopy of TCT []
x) Compliance of PD 984
Authority to Construct (A/C),
Permit to Operate (P/O)
- Gen Set Installation []
- STP/WTF (applicable only if[ ]
building accommodates more than
500 occupants or 100 rooms)
xi) Fees:
Filing Fee: P 310.00
Research Fee: 70.00
Processing Fee: 1,750.00
_________
Total: 2,130.00
Page 15 of 15