Professional Documents
Culture Documents
Fastfood Project: (Project Name or Title)
Fastfood Project: (Project Name or Title)
Fastfood Project: (Project Name or Title)
For
Below is the IEE Report checklist for Fastfood project proponents. Read the questions carefully
before answering in the space provided. Use additional sheets, if necessary, and indicate this in
the appropriate space.
Misleading or erroneous answers shall be used as basis for legal action and/or denial of
ECC.
PROJECT LOCATION :
_________________________________________________________________
(no., street, barangay, city/municipality, province)
GEOGRAPHIC COORDINATES :
_________________________________________________________
[attach location map as Annex 1 ]
NAME OF PROPONENT/OWNER :
_______________________________________________________
NAME OF CONTACT PERSON :
_________________________________________________________
ADDRESS :
___________________________________________________________________________
( no., street, barangay, city/municipality, province )
TELEPHONE NO. :
_____________________________________________________________________
FACSIMILE NO. :
______________________________________________________________________
E-MAIL or ADDRESS :
__________________________________________________________________
A. GENERAL INFORMATION
1. Project ownership
[ ] Single Proprietorship
[ ] Partnership
[ ] Corporation
4. land
Total land area : __________________________ sq. m.
Right over land : [ ] owner [ ] leased
If leased, indicate the period covered : _____________________________________
[ attach a copy of lease contract of agreement ]
6. Alternatives
Alternative use of the proposed project site :
__________________________________________________
Alternative site for the proposed project :
____________________________________________________
B. PROJECT DESCRIPTION
a. Pre-construction/construction phase
[ ] Activity(ies) Timeframe
[ ] Plans / design
[ ] Permits / clearances
[ ] Site development
[ ] Structure preparation
[ ] Concrete works
[ ] Masonry works
[ ] Roofing works
[ ] Carpentry works
[ ] Ceiling works
[ ] Metal works
[ ] Glass works
[ ] Floor works
[ ] Painting works
[ ] Plumbing works
[ ] Electrical works
[ ] Sewage/wastewater treatment facility
[ ] Others, pls. Specify
a.1 Machinery/Equipment
No . of units Machinery / Equipment Specifications
Backhoe
Payloader
Jackhammer
Cement mixer
Others, pls. Specify
a.3 Others
b. Operation phase
Project capacity : __________________________________________
c. Abandonment phase
Facilities to be Waste generated Mode of disposal Restoration plan
abandoned
2. Facilities requirements
a. Water supply
No. of units Source of water supply Consumption/day
Local water district
Surface water
Deepwell
Others, pls. Specify
b. Power supply
No. of units Source of power supply Consumption/day
Local electric utility
Generator
Others, pls. Specify
PHYSICAL ENVIRONMENT
Topology / Slope
[ ] flat/level ( 0 – 3 % )
[ ] level to undulating ( 3- 8 % )
[ ] undulating to rolling ( 8 – 18 % )
[ ] rolling to moderately steep ( 18 – 30 % )
[ ] moderately steep to steeply mountainous ( 30 – 50 % )
[ ] very steeply mountainous ( above 50 % )
Soils Drainage
Air quality
[ ] poor
[ ] fair
[ ] good
4. Will the required benefits under the Labor Code and other regulations be enjoyed by the
staff ?
[ ] yes [ ] no
If yes, please elaborate:
5. Will the cultural norms/morals and lifestyle of the local inhabitants ( especially indigenous
people ) be affected by the project
[ ] yes [ ] no
If yes, please elaborate:
Attach photo of area topography
Abandonment Phase
Will there be facilities to be abandoned or
demolished at the end of project life ?
Please provide details.
Will any of the facilities be rehabilitated
after a certain period of time ?
DESCRIBE YOUR MITIGATION / Parameters Area / Frequenc Procedur Responsible
ENHANCEMENT MEASURES to be stations y es to be Persons
monitored used for
sampling
and
laborator
y
analysts
Pre-Construction /
Construction Phase
Land clearing
Vegetation clearing
Tree-cutting
Topsoil removal / replacement
Excavation works and cut &
fill activities
Other earthmoving activities
Stockpiling of sand/gravel
materials in the project area
Drilling, boring and
hammering activities
Slope modification or ground
leveling
Increase in traffic
(vehicle) movement in the
area
Alteration of public /
community access to/through
the area’s resources
Increase economic activity
Increase availability of
employment
Raise in associated project
activities
Displacement of people in the
area
Encroachment on ancestral
domain
Effect on indigenous or local
people
Effect on women and other
vulnerable groups
Solid waste generation
Toxic and hazardous waste
generation
[ ] Garbage Pit
volume per burial :
_____________m3/day
frequency of burial :
______________ /wk
D. ATTACHMENTS
DESCRIPTION ATTACHED?
DESCRIPTION ATTACHED? Map / Delineation of primary and
Transfer Certification of Title secondary impact areas
Colored photos of the site Endorsement from the Local
(different perspectives ) Government Unit / Proof of the
Project Vicinity Map/Sketch project’s social acceptability
Project Lay-out Plan Construction schedule in chart
Sewerage and Drainage Plan form
WT. Plan Lease Contract of Agreement
ACCOUNTABILITY STATEMENT
This is to certify that all the information and commitments in the Initial Environmental Examination (IEE) Report are true, accurate and
complete. Should I/we learn if any information which would make the IEE inaccurate, I/we shall bring said information to attention of the
Environmental Management Bureau of DENR Regional Office.
I/We hereby bind myself/ourselves jointly and solidarity for any penalties that may be imposed arising from and misrepresentations or
failure to state material information in the IEE. As permitted under section bc of Article
_________________________________________________
Project Proponent
_________________________________________________
Title/Designation
_________________________________________________
Date
ACKNOWLEDGMENT
Witness my hand and seal on the place and date above written.
____________________________
Notary Public
Doc. No.____________________
Page No.___________________
Book No.___________________
Series of __________________