Choke Drill Procedure

1- Trip in hole above top of cement “FC”

2- Fill the pipe and circulate mud for few minutes

3- Close annular preventer or upper rams preventer

4- Pressure up annulus to 200 psi

5- Line up the pump

6- Pump slowly to bump the float and obtain shut in drill pipe
pressure

7- Bring the pump slowly to kill rate by holding casing pressure


constant – personnel need to adjust the choke – until achieved
the kill rate selected

8- Measure lag time for the drill pipe gauge after the adjustment of
choke is made.

9- Continue circulation, keep constant kill rate, and keep constant DP


pressure by adjusted the choke.

10-Bleed off pressure and line up for drilling operation