Samrat Cement Private Limited Lamahi -7, Dang.

Daily Work Progress Report


Civil Department
Date:03.06.2020
S.N. Name of Structure Work progress Status

1 Lime Stone Crusher

2 Additive Crusher Shuttering and R/F works for pedestal in coal trippler area.

3 Lime Stone Stacker and Reclaimer Tie beam shuttering for shed is on progress.

Tie beam shuttering , R/F and concreting works on progress. Retainign wall one lift concreting works
4 Additive Stacker and Reclaimer
on progress.
5 Belt Conveyors
6 Raw Mill Hopper
7 Raw Mill Building

8 Coal Mill Building / Booster Fan PCC for booster fan foundation.

9 Raw Mill Bag House & Fan Foundtion


10 Duct Complex
11 Hot Dust Bin
12 Blending Silo

13 Pre Heater
14 Pre Heater Fan and Boiler

15 Kiln Half grouting in kiln main gearbox is on progress.


16 Cooler
17 ESP
18 Bulk Loading Silo

19 CSP Flooring works on progress.

20 CCR

21 MRSS/ Load Centre Cable trench area PCC works on progress.

22 Store Building plaster works for toilet on progress.

23 New Batchelor Quarter Brickworks in second floor is on progress. Plaster works in ground floor is also on progress.

24 Miscellaneous Works Security guard quarter PCC and plaster works on progress.

25 Water Tank

26 DG building Brick works upto plinth level is on progress. Back filling works on progress.

27 Cooling tower

28 Air Compressure Dishuttering works on progress.

29 TG building Column concreting upto tie beam is on progreass.Tie beam shuttering works on progress.

30 Clay Yard Back filling works on progress.