Ponc e - LL Oyd@ Ya Hoo. Com. PH

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 12

RESUME

PERSONAL DATA
Position Desired
: MATERIALS ENGINEER
Name
: LLOYD R. PONCE
Address
: Siari, Sindangan, Zamboanga del Norte
Height
: 5¶5´
Weight
: 76 kg.
Date of Birth
: April 14, 1978
Place of Birth
: Siari, Sindangan, Zamboanga del Norte
Civil Status
: Single
Sex
: Male
Religion
: Roman Catholic
SSS Number
: 10-0889367-4
TIN Number
: 923-278-627
Cellphone Number
: 09097135390
E-mail Address
:ponc e_ll oyd@ ya hoo. com. ph
EDUCATIONAL ATTAINMENT
ELEMENTARY
: Siari Elementary School
Siari, Sindangan, Zamboanga del Norte
Philippines
(Graduated School Year 1990 ± 1991)
SECONDARY
: Saint Joseph College

Sindangan, Zamboanga del Norte


Philippines
(Graduated School Year 1994 ± 1995)

COLLEGE

: Bachelor of Science in Civil Engineering


Andres Bonifacio College
College Park, Dipolog City

Philippines
(Graduated School Year 1999± 2000)
ACCREDITATION

- 2-
Career Service Sub professional, Philippines
August 24, 1999
No. 09020381
Registered Civil Engineer, Philippines
Nov. 18, 2000
License No. 88990
SEMINARS & TRAINING ATTENDED
Water Supply Technology Capability Enhancement Training
Variety of quality control test and Construction Method
Sponsor

: DSWD-KALAHI CIDSS
Venue
: La Veña Hotel Zamboanga City (January 16-20, 2005)
MEMBERSHIP IN PROFFESIONAL SOCIETY
PICEM e mb er
Philippine Institute of Civil Engineer
Cebu Chapter (January 2001)
LANGUAGE & DEGREE OF PROFICIENCY
English
Good
Tagalog
Good
Visayan
Good
COMPUTER LITERACY
Computer Software Operation
(Microsoft Word and Microsoft Excel)
WORKING EXPERIENCE:
_____________________________________________________________ ________________
I. EMPLOYER:
ENGINEERING AND DEVELOPMENT CORPORATION OF THE PHILIPPINES (EDCOP)
PERIOD
: March 18, 2009 to December 31, 2009
POSITION
: CONSULTANT MATERIALS ENGINEER
PROJECT

: 42.5 MW - SIBULAN HYDRO ELECTRIC PROJECT (SHEPP)


Sta. Cruz, Davao del Sur
Project Cost ± 5.1 Billion Php

PROJECT DESCRIPTION:

The SHEP Project consist of a cascade of two independent hydroelectric projects namely an upstream Plant A and a downstream Plant B with an
installed capacity of about 16.5MW & 26 MW respectively, giving a combined output of 42.5 MW.

Accredited Materials Engineer II for Consultants and Contractors


Department of Public Works and Highways-Philippines
November 15, 2006
Accreditation No. 1559 (Upgraded)

Accredited Materials Engineer I for Consultants and Contractors


Department of Public Works and Highways-Philippine
March 04, 2002
Accreditation No.1559

ELLIGIBILITY
- 3-
Civil Works:
y
Construction and Rehabilitation of Access Roads including 20m RCDG Bridge,
Box Culverts, Flume Bridge, cross drainage and slope protection.
y
Construction of earth fill dam.
y
Installation of HDPE liner
y
Tunnel construction
y
Steel Conveyance Pipelines
y
Penstock
y
Temporary skylines and temporary facilities
y
Desanders
y
Headponds
y
Steel conveyance pipelines
y
Powerhouse and substation
y
Intake Weirs
DUTIES & RESPONSIBILITIES:
y

Review and strictly implement the Project Technical Specifications, pertinent notes indicated on the latest issued plans, engineering change notice
e.g Site Instructions, Supplemental Specification and testing procedures.

Conducts initial inspection as soon as representative segment of the particular item of work has been accomplished and to include examination of
quality workmanship and a review of control testing for compliance with the contract requirements.

y
Issues Non-conformance and Corrective Action when work has not been executed in full
compliance with the contract documents.
y

Review and update quality records of Non-Destructive Test (NDT), such as Radiographic Test, Dry Film Thickness using elcometer and Holiday Test
for lining and coating for pipeline.

y
Ensure completeness of project documentation for project close out.
y
Supervise quality assurance and quality control inspection of a project.
y
Evaluate and recommend solutions on inspection problems.
y

Control, monitor the concrete production in order to ensure that concrete proportioning is accurate for a specific structure and uniformly
proportioned throughout its batching operation.

y
Review and check Minimum Materials Testing Requirement (MMTR) to make sure that the materials incorporated into its permanent works were
being tested to the required minimum test frequency.

y
Check and evaluate the accuracy of submitted Mill Test Certificate.
y
Supervise, coordinate and initiate calibration of plant equipments, testing machines and
Materials Laboratory Testing Apparatus.
y
Witness and evaluate test results on cement, reinforcing bars, shotcrete toughness indices
tested by any other accredited testing laboratory.
y
Reject works and materials not in accordance with the specifications.
y
Shall verify all materials to be furnished by the Contractor if it is in accordance with the
specifications. Likewise, witness and monitor the required test if properly conducted.
y
Records all inspection and test results using the Quality Control Inspection Report (QCIR)
y
Interface with the Resident Engineer to cause the implementation of Quality Control
disposition

_____________________________________________________________________________
II. EMPLOYER
: HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO., LTD.
PERIOD
:
April 25, 2006 to March 18, 2009
POSITION
:
MATERIALS ENGINEER II
PROJECT
:
MIRIDP-Metro Iligan Regional Infrastructure Development Project
(Roads Component)
Segment-1
:
(Fatima ± Tagoloan ± Baloi Road) 15.71 Km
Segment-2
:
(Linamon ± Matungao ± Baloi Road) 12.79 Km
Segment-3
:
(Kauswagan ± Delabayan ± Munai Road) 25.26 Km

JBIC L/A No. PH-P191


Provincial Government of Lanao del Norte
Project Cost ± 1.07 Billion Php

PROJECT DESCRIPTION:
The Project is Located in the Municipality of Tubod, Province of Lanao del Norte. The Project is
divided into three segments which cover a total length of 53.76 Km.
It is delineated in the following works:

y
Earthworks
y
Subbase and Base Course
y
Lean Concrete (Base Course)
y
Removal & Replace of Existing PCCP
y
Construction of new Portland Cement Concrete Pavement
y
Construction of two(2) PSCG Bridges
y
Construction of one(1) RCDG Bridges
y
Reinforced Concrete Box Culvert
y
Slope Protection: Gabions, Reinforced Retaining wall, Stone Masonry Wall,
Geoworks System Wall.
y
Drainage Structure including Head Wall/ Wing Wall & Catch Basin Concrete.
y
Roads Signs & Pavement Markings
DUTIES & RESPONSIBILITIES:
y

Responsible for the Project Quality Control of the three segments which is the Segment-1, Segment-2, and Segment-3.Monitor and control the
Quality of all materials involve in construction activities such as, Soils, Aggregates, Concrete, Cement, Steel bars etc., in compliance with the
specification and standard testing procedures (AASHTO,ASTM,ACI and DPWH Standards).

Prepares Quality Control Program on all items of works applicable for the project implementation, review and evaluate pertinent notes specified
on the contract plans. Making sure it will correlates to the given Special Provisions, Addendum and Supplemental.

y
Prepares daily laboratory activities, supervise and perform all material related testing
activities at field as well as in the project testing laboratories.
y

Source-out and investigate probable sources of materials needed for the project and conduct immediate and necessary quality test and advice the
Project Manager the suitability of the materials before incorporating into a permanent work.

y
Prepares Conrete Mix Design in accordance with the ACI.211 for major and minor
concrete structures

- 5-
y

Check and investigate any failed test results of the quality test of concrete and troubleshoots using a sound engineering
judgement and introduced any other alternative means of testing relative to standard specifications.

Prepare Monthly Materials Report to ensure that all works accomplished complies with the specification requirements and
update the minimum test requirements reflected in the status of test.

____________________________________________________________________________
III. EMPLOYER
:
DSWD-KALAHI CIDSS (REGION-IX)
Loan Ph-P 7147
POSITION
:
DEPUTY AREA COORDINATOR
PROJECT
:
KALAHI CIDSS:KKB
Kapit Bisig Laban sa Kahirapan
Comprehensive and Integrated Delivery of Social Services
Kapangyarihan at Kaunlaran sa Barangay
Field Location
:
Municipality of Dinas, Zamboanga del Sur
Sub-Project
:
Barangay Road Construction, Rehabilitation, and Concreting
Construction of Water Systems Level-II
Construction of Barangay Health Stations
Period
:
September 24, 2004 to February 07, 2006
Field Location
:
Municipality of Siayan, Zamboanga del Norte
Sub-Project
:
Barangay Road Construction and Road Rehabilitation
Construction of Water Systems Level-II
Construction of two (2) Hanging Bridges
Period
:
April 10, 2004 to September 24, 2004
PROJECT DESCRIPTION OF KALAHI-CIDSS:KKB PROJECT
y

Improves literacy on the human development index and induced strong feeling of
belonging, ownership and citizenship on the participation in governance to the community
level.

Economic Support Infrastructure

o Communal irrigation systems rehabilitation

o Communal irrigation systems construction

o Production and post harvest facilities, etc.

Physical Infrastructure
o Road Rehabilitation

o Road Construction

o Construction of Hanging Bridges, etc.

Basic Service Infrastructure

o Water System (Level-I, and Level-II)

o Barangay Health Station

o School Buildings and Basic Education Facilities, etc.

Capability Building Activities


o Training for enterprise development, such as, fishing techniques,technology
demonstration on farming, etc

- 5-
y

Check and investigate any failed test results of the quality test of concrete and troubleshoots using a sound engineering
judgement and introduced any other alternative means of testing relative to standard specifications.

Prepare Monthly Materials Report to ensure that all works accomplished complies with the specification requirements and
update the minimum test requirements reflected in the status of test.

____________________________________________________________________________
III. EMPLOYER
:
DSWD-KALAHI CIDSS (REGION-IX)
Loan Ph-P 7147
POSITION
:
DEPUTY AREA COORDINATOR
PROJECT
:
KALAHI CIDSS:KKB
Kapit Bisig Laban sa Kahirapan
Comprehensive and Integrated Delivery of Social Services
Kapangyarihan at Kaunlaran sa Barangay
Field Location
:
Municipality of Dinas, Zamboanga del Sur
Sub-Project
:
Barangay Road Construction, Rehabilitation, and Concreting
Construction of Water Systems Level-II
Construction of Barangay Health Stations
Period
:
September 24, 2004 to February 07, 2006
Field Location
:
Municipality of Siayan, Zamboanga del Norte
Sub-Project
:
Barangay Road Construction and Road Rehabilitation
Construction of Water Systems Level-II
Construction of two (2) Hanging Bridges
Period
:
April 10, 2004 to September 24, 2004
PROJECT DESCRIPTION OF KALAHI-CIDSS:KKB PROJECT
y

Improves literacy on the human development index and induced strong feeling of
belonging, ownership and citizenship on the participation in governance to the community
level.

Economic Support Infrastructure

o Communal irrigation systems rehabilitation

o Communal irrigation systems construction

o Production and post harvest facilities, etc.

Physical Infrastructure

o Road Rehabilitation

o Road Construction

o Construction of Hanging Bridges, etc.

Basic Service Infrastructure


o Water System (Level-I, and Level-II)

o Barangay Health Station

o School Buildings and Basic Education Facilities, etc.

Capability Building Activities


o Training for enterprise development, such as, fishing techniques,technology
demonstration on farming, etc.

- 6-
DUTIES & RESPONSIBILITIES (DEPUTY AREA COORDINATOR):
Social Aspects:
y

Facilitate Social Preparation, Capacity building and Technical Implementation Support in


all stages of the Project Cycle
Technical Aspects:
(Engineering)
y

Prepares Program of Works and detailed estimates for various infrastructure projects.
y

Supervise the construction procedure, proper use of equipments, and proper utilization of
materials to minimize cost without sacrificing the essential value of work.
y

Prepare and update weekly and monthly construction schedule and quantifies all work accomplished and compares to the
scheduled Physical Accomplishments versus actual Physical Accomplishment using S-Curve.

Established vertical alignment and horizontal elevation control in Roadway Construction and Piping System (Water System
Level-I and Level-II) using the engineer¶s transit and GPS.

Ensures that al completed works and materials procured and incorporated into a permanent
work are in accordance to the contract Plans and Specifications.
y

Prepares Variation Order and Changed Order per infrastructure project to suit field
condition without affecting the specified quality of works.
y

Prepares and evaluate Bid documents, Contract documents, in accordance with the guidelines of World Bank Procurement
manual and the Philippine Government Procurement manual (P.D. 1594).

Ensure that all material complies with the given specification thru quality test applicable
mill test certificate as required.
y

Check and inspect the materials being used in the sub-project to ensure it conforms to the
specification requirement of the project.
y

Kept and update daily records for the utilization and the delivery of materials on site.
_____________________________________________ _________________________ _______
IV.
EMPLOYER
: SHINSUNG CORPORATION
PROJECT

: IBRD ± Assisted National Road Improvement and Management Program


Rehabilitation of Zamboanga ± Pagadian Road
Buug ± Kabasalan Road Section
Contract Package-2
Project cost ± 1 Billion Php

POSITION
: MATERIALS ENGINEER (Supplied to the Consultant)
PERIOD
: March 04, 2002 to March 20, 2004
POSITION
: LABORATORY TECHNICIAN (Supplied to the Consultant)
PERIOD
: June 04, 2001 to March 04, 2002
PROJECT DESCRIPTION:
y

Construction 52 km Road consisting of two(2) lane Portland Cement Concrete


Pavement (PCCP) with Cement Treated Base Course (CTB)

- 7-
y

and Rehabilitation of Road &Bridges


y

Construction of one(1) PSCG Bridge


y

Construction of two(2) RCDG Bridge


y

Rehabilitation of existing 14-Reinforced Concrete Deck Girder


y

Construction of RC Pipe, Box Culvert and Slope Protection


y

Retrofitting/strengthening Concrete Girder (existing Bridges)


DUTIES & RESPONSIBILITIES-
Materials Engineer (Supplied to the Consultant)
y

Sampling and Testing of PCCP & CTB


y

Assist the Consultant Material Engineer in the checking and evaluation of Monthly
Materials Report.
y

Supervise Quality test performed and assist in the sampling of materials in-place, on
stockpile and proposed sources of quarry to be used in the project implementation.
y

Assigned by the Consultant Materials Engineer to act as a Materials Engineer of the consultant in the absence of the
Consultant Materials Engineer and supervise all related project activities.

Assist the Consultant Materials Engineer in the inspection and monitoring of field
activities.
y

Prepare daily, weekly and monthly Materials Quality Control Report and summary of
back-up test results.
y

Check and inspect on site the material used if it represents to the materials previously
approved and accepted conforming to the specification stipulated in the contract.
y

Conduct Soil Classification in every change of soil strata per borehole of the bored pile
using Unified and AASHTO Soil Classification
y

Assist to the accredited independent testing laboratory personnel in the conduct of Pile
integrity testing (PIT) and Pile Dynamic Analysis (PDA) conducted in the project site.
y

Assist and kept record in the conduct of concrete girder post tensioning eg., elongation
and jacking force.
y

Inspects the integrity and soundness of the carbodur plate installed at flexural member of the Reinforced Concrete Girder
and the Sika Wrap at defective shear location for shear strengthening.

Conduct ocular inspection at CTB Batching Plant as well as Concrete Batching Plant to
ensure a correct batch weight proportioning compliance with the standard specification.
DUTIES & RESPONSIBILITIES-
Laboratory Technician (Supplied to the Consultant)
y

Assist all materials sampling and testing performed in the Project laboratory using available facilities in private and
government testing laboratories accredited by DPWH as permitted by the Consultant.

Assigned as a Concrete Batching Plant Inspector to ensure that the approved Concrete Mix Design for batch weight in
production of concrete was used, and to ensure that the mixing and handling of concrete conforms to the AASHTO,
ASTM & ACI standard specifications.

Kept and update weekly and monthly record relative to materials testing activities,
quality test results and material deliveries on site.
y

Check and inspect on site the material being used whether it represents to the approved
materials previously tested and accepted.
y

Prepares daily accomplishment report and others which is related to laboratory and civil
works.
y

Responsible and in charge in all Concrete Test and Drilled Cored Test for PCCP
thickness determination.

- 8-
y

Supervise material testing performed for construction work. Evaluate material testing
results, record modification to meet standard specification.
y

Responsible and in charge in sampling and testing of the quality test of Soils,
Aggregates and Concrete.
y

Supervise the fabrication of concrete guardrail and reinforced concrete pipe culvert, checked the installation of reinforcing
bars and to ascertain the proper mix proportioning closed conformity with approved Concrete Mix Design.