Professional Documents
Culture Documents
Ni 0047 PDF
Ni 0047 PDF
N-47
N REV. J EN
NGLISH 09 / 2012
Georefe
erenced
d Topog
graphic
c Survey
y
Procedure
Techhnical Requi rement: A prrovision estab blished as thee most adequ uate and
whic
ch shall be ussed strictly in accordance with
w this Stanndard. If a de ecision is
CON
NTEC taken not to follow
w the requirem
ment (“non-con
nformity” to thiis Standard) itt shall be
Comissão de
e Normalização
o ed on well-fou
base unded econom mic and mana agement reasoons, and be approved
a
Téccnica and registered by the Departme ent of PETRO
OBRAS that usses this Stand dard. It is
charracterized by im
mperative natture.
Recoommended P ractice: A pro ovision that ma
ay be adoptedd under the co
onditions
of this Standard, but which ad dmits (and dra aws attention to) the posssibility of
there
e being a morre adequate alternative (not written in tthis Standard d) to the
partic
cular applicati on. The altern
native adoptedd shall be appproved and re
egistered
by th
he Departmentt of PETROBRAS that uses this Standaard. It is chara acterized
by verbs
v of a n nonmandatory y nature. It is indicated by the exp pression:
[Recommended P Practice].
Copiees of the regisstered “non-co
onformities” to
o this Standarrd that may co
ontribute
to the improveme ent thereof sh hall be submiitted to the CCONTEC - Authoring
A
SC - 04 Subccommittee.
Civil Con
nstruction Prop
posed revision ns to this Sttandard shall be submitteed to the CO ONTEC -
Auth
horing Subcommmittee, indica ating the alphanumeric idenntification and
d revision
he Standard, the section, subsection and
of th a enumeratte to be revised, the
prop
posed text, an
nd technical/economic justiffication for reevision. The proposals
p
are evaluated
e duriing the work fo
or alteration of this Standardd.
In
ntroduction
n
PETRO OBRAS Tech hnical Standa ards are prep pared by Wo
Working Group ps - WG
(consistin
ng specializzed of Tech hnical Collaaborators frrom Company and itss Subsidiarie es), are
commentted by Comp pany Units and
a its Subsiidiaries, are approved by y the Authoriing Subcomm mittees -
SCs (con nsisting of te
echnicians froom the same e specialty, representing
r the various Company Units
U and
its Subsid
diaries), andd ratified by the
t Executive e Nucleus (c consisting of representatiives of the Company
C
Units andd its Subsidiaaries). A PETTROBRAS T Technical Staandard is subbject to revisiion at any tim
me by its
Authoringg Subcommiittee and sha all be review
wed every 5 years
y to be revalidated,
r rrevised or caancelled.
PETROB BRAS Techn nical Standa ards are prrepared in accordance with PETR TROBRAS Technical
T
Standardd N-1. For co omplete inforrmation abou ut PETROBR RAS Technic cal Standardds see PETR ROBRAS
Technicaal Standards Catalog.
PROPER
RTY OF PET
TROBRAS 27 pa
ages, Index oof Revisions and WG
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
Summary
d...................................................................................................................... .............................. 4
Foreword
1 Scope....................................................................................................................... .............................. 4
2 Norma nces ............................................................................................ .............................. 4
ative Referen
ons............................................................................................. .............................. 5
3 Terms and Definitio
al Conditionss ................................................................................................. .............................. 6
4 Genera
1 Execution Procedure ................................................................................. .............................. 6
4.1
2 Equipmentt ................................................................................................. .............................. 7
4.2
3 Basic Support ............................................................................................ .............................. 7
4.3
4.4 hic References ........................................................................... .............................. 7
4 Topograph
kers ........................................................................ .............................. 7
4.4.1 Topographic Mark
4.4.1.1 Types
T arkers ...................................................................... .............................. 7
of Ma
4.4.1.2 Use of Markers .......................................................................... .............................. 8
eodetic Monoographs ................. 8
n of Markers and Contentts of their Ge
4.4.1.3 Identification
4.4.1.4 Location of Markers
M .................................................................. .............................. 8
4.4.1.5 Seating and Specification s ...................................... .............................. 9
n of Markers
4.4.1.6 Preservation
n of Topograp s...................................... .............................. 9
phic Markers
ets ............................................................................................... ............................ 10
4.4.2 Picke
4.4.3 Core Sampling Sttake ........................................................................ ............................ 10
4.5
5 Principal Polygonal
P .................................................................................... ............................ 10
6 Secondaryy Polygonal ................................................................................ ............................ 10
4.6
7 Distances and Angles ............................................................................... ............................ 10
4.7
4.7.1 Linea
ar and Angula ments .................................................. ............................ 10
ar Measurem
etry ............................................................................................ ............................ 10
4.7.2 Altime
4.8
8 Tolerancess - Topograp phic Survey in Areas or Strips Earm marked for thhe Implemen ntation of
the Definittive Design ................................................................................. ............................ 11
ar Closing ................................................................................... ............................ 11
4.8.1 Linea
ar Closing of Strips ..................................................................... ............................ 11
4.8.2 Linea
4.8.3 Angular Closing ................................................................................. ............................ 11
etric Closing .............................................................................. ............................ 11
4.8.4 Altime
5 Specific Conditionss ................................................................................................. ............................ 11
5.1 ey of Areas ......................................... ............................ 11
1 Georeferenced Topogrraphic Surve
altimetry..................................................................................... ............................ 11
5.1.1 Plania
5.1.2 Restitution and Presentation ............................................................. ............................ 12
5.1.2.1 Macro Locattion Drawing .......................................................... ............................ 12
5.1.2.2 Area
A Plan .................................................................................. ............................ 12
c Plan(s).................................................................. ............................ 12
5.1.2.3 Topographic
T
as ....................................................... ............................ 13
5.1.2.4 Drawings of Special Area
5.1.2.5 Drawing of th
he Scheme o
of Support Polygonals
P an Polygonals .......... 13
nd Principal P
5.1.2.6 Supplementa nts...................................................... ............................ 13
ary Documen
2
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
Figures
3
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
Foreword
This Stan
ndard is the English verrsion (issued
d in 04/2014 4) of PETRO
OBRAS N-477 REV. J 04//2012. In
case of d
doubt, the Po
ortuguese ve
ersion, whichh is the valid document fo
or all intentss and purpos
ses, shall
be used.
1 Scope
e
1.3 Servvices to be
e performed
d with sup
pport of GNSS stations shall foollow PETR
ROBRAS
N-2698.
2 Norm
mative References
The follow
wing referennced docume ents are indisspensable fo
or the applica
ation of this ddocument. For
F dated
referencees, only the edition
e cited applies. Forr undated references, the
e latest editioon of the refferenced
documen nt applies.
Ministério do
d Desenvolv
vimento Agrrário (MDA) - Norma Téc
cnica para G
Georreferenc
ciamento
de Imóveis Rurais;
PETROBRA
AS N-381 - Execution
E of Drawing and
d Other Gene
eral Technicaal Documentts;
PETROBRA
AS N-845 - Geotechnical
G l Investigatio
on;
AS N-2726 - Dutos;
PETROBRA
NOTE For documents referred in this Sttandard and for which only the Poortuguese ve ersion is
available, th
he PETROBR RAS departm ment that use es this Stand
dard should be consulted
d for any
information required for the specific application.
4
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
3 Terms
s and Defin
nitions
3.1
azimuth
al angle meassured in the clockwise diirection from north to the reference allignment
horizonta
3.2
“benchmmark”
deep leve
el reference
3.3
meridian n convergen nce
relationsh
hip between n the true azimuth
a (in reference to
o the true north)
n and tthe grid azim
muth (in
referencee to the north
h of the grid)
3.4
“DATUM M”
Surface rreference forr horizontal (X
X, Y) and ve
ertical (Z) con
ntrol of points
s
3.5
magnetic c declination
variable a
angle formedd between th
he magneticc meridian an
nd the geogrraphic or asttronomic me
eridian of
the Earth
h
3.6
georeferrencing
Assignme ent of geode
etic coordinattes to the ele daries of prooperties and rights of
ements setting the bound
way
3.7
magnetic c north
site in the North-Sou uth direction, whose direection points at the north
hern magnettic pole of th
he Earth,
that is, itt is the direcction indicate eedle of a compass in the absence of friction and
ed by the ne a local
sources o of attraction
3.8
grid nortth
direction perpendicula
ar to the equ
uator on carto
ographic plan
ns
3.9
true nortth
the directtion of the ge
eographical north
n pole off the Earth
3.10
support polygonal
polygonaal which has the goal of conveying
c co
oordinates an
nd altitudes from basic suupport station
ns to the
relevant vvertices of th
he principal polygonal
p
5
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
3.11
principal polygonal
polygona al that servess as support and planialtiimetric contro
ol for all surv
veys to be caarried out in the area
or strip
3.12
secondaary polygonaal
al which has its origin and
Polygona d its end on tthe vertices of pal polygona l
o the princip
3.13
restitutio
on
stage in ttopographic survey cons
sisting of plottting an area
a or strip in planialtimetry
p y, to a uniform scale,
by using photogramm metric method
ds or direct ffield survey
3.14
Deep Lev vel Reference (DLR)
unsettlab
ble fixed poin ontrol of settl ements
nt used for co
3.15
Referenc ce Geodesicc System for South Am erica (SIRGAS 2000)
official re
eference systtem of “DATU
UM”
3.16
topo-batthymetry
determinaation of the relief
r of the bottom
b of a riiver, lake or sea
3.17
“Global Navigation Satellite Sysstem (GNSS S)”
ocating the coordinates of a point based on th
system ccapable of lo he informatioon conveyed
d on the
electroma
agnetic wavees of a netwo
ork of satellittes
4 General Conditiions
For the purposes ofo this Standard, the g general cond ditions set out
o in ABN T NBR 131 133 and
PETROB BRAS N-2698 are adopte ed, as well a
as the generral considera
ations indicaated in the Technical
T
Standard
d for Georefe
erencing of Rural
R Propertiies, complem
mented by 4.1 to 4.8.
For geote
echnical serrvices for ins
stallation of D onditions set out in PETR
DLR, the co ROBRAS N--845 are
adopted.
4.1 Exec
cution Proce
edure
a) objectivee: definition of
o the basic g
goal of the su
urvey;
b) applicab ble standards s and docum ents;
c) terms an nd definitionss;
d) equipme ent used;
e) n of basic support networrk;
definition
f) topograp phic referenc ces (type and
d usage);
6
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
g) tolerancees;
h) methodo ology for perfformance of services;
i) results of
o services;
j) safety, occupational
o health and e
environmenta al requirements;
k) technicaal staff emplo
oyed in the exxecution of services.
s
4.2 Equiipment
4.2.2 In a
addition to th
he equipmennt mentioned in the ABNT T NBR 13133 S shall be included as
3, the GNSS
basic equ
uipment for loocating planimetric and a
altimetric coo
ordinates.
on certificate for the devices shall be valid for upp to six montths as of
4.2.3 The gauging and calibratio
their date
e of issuance
e.
4.4 Topo
ographic Re
eferences
4.4.1 To
opographic Markers
M
4.4.1.1 T
Types of Ma
arkers
Dependin ng on the gooal that they are designe e, the topographic markeers shall fall into the
ed to achieve
following categories:
7
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
4.4.1.2 U
Use of Marke
ers
dentification
4.4.1.3 Id n of Markers
s and Conte
ents of theirr Geodetic Monographs
M s
4.4.1.3.1 Topographic markers of o types A, B and C sha all be identiffied through bronze or stainless
s
steel plattes containing the informa
ation indicate
ed on the de
etail of Figure
e A.3
4.4.1.3.2 Monograph
hs of topogra
aphic markerrs of types A,
A B and C sh
hall contain aat least the following
f
informatio
on:
a) numbering of markerr;
b) altitude and coordin
nates in the UTM (Unive ersal Transv
verse Mercaator) and geo
ographic
systems, in “DATUM M” SAD 69, SSIRGAS 2000;
c) sketchess showing loc
cation and d escription off access;
d) date of im
mplementation and persoon responsib ble for execution.
4.4.1.3.4 In the desccriptive part of DLR marrkers, there shall be all information about the sounding
s
performaance, driving of DLR, and other notes .
4.4.1.3.5 In the locattion drawing of DLR markkers, it shall be provided the coordinaates and elevation of
DLR head.
4.4.1.3.6 In the sch hematic proffile drawing for installattion of DLR R, it shall bbe provided all pipe
installatio
on elevationss, indicated on
o the side off the respecttive sounding
g profile perfo
formed.
4.4.1.4 L
Location of Markers
a) points which
w settlem
ments are to be measured s necessary tthe smallestt number
d, so as it is
of auxilia
ary pickets to
o read the se
ettlements;
8
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
4.4.1.5 S
Seating and Specificatio
on of Marke
ers
4.4.1.5.1 When seatting the mark on shall be paid to theirr foundation conditions, so as to
kers, attentio
prevent aany possible displacemen
nts.
4.4.1.5.3 DLR shall be b made of two concenttric galvanize es. The exte rnal pipe of 2 1/2”
ed steel pipe
or 3” - coating - is intended to protect
p the in o 1” - stem -, as indiccated in Figure A.4 of
nternal pipe of
Annex A..
4.4.1.5.4 The DLR stems shall have its loweer extremity (seating ele
evation) seatted on the elevation
e
corresponding to the impenetrable area obta ained in the coating
c allation, or if percussion strength
insta
rates equual to or abovve 30/30 are obtained in the last 4 m.
4.4.1.5.7 It shall be injected throough the ste em, under pressure, a cement
c slurry
ry with waterr/cement
content oof 0,5 (five te
enths) which shall overflo
ow to the gro ound through
h holes locateed in the ste
em edge,
so that itt allows the formation ofo a wide ba ase, fixing th he stem on ground, andd other stem m fixation
techniquees may be used.
u That cement
c slurrry shall fill all
a the inner part of the sstem, until its upper
extremityy.
4.4.1.6 P
Preservation
n of Topogra
aphic Marke
ers
9
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
ckets
4.4.2 Pic
4.4.3 Co
ore Sampling
g Stake
4.5 Princ
cipal Polygo
onal
4.5.3 The vertices ofo the principal polygon nal which cooincide with the verticees of the se
econdary
polygona
al,(see 4.7), shall
s pographic and UTM syste
refer to the local top em.
ondary Poly
4.6 Seco ygonal
4.6.1 Du
uly tied to thhe vertices of the basicc support orr of the prinncipal polygoonal, the se econdary
al shall be implemented, in
polygona i a number sufficient forr the compila
ation of all neecessary deta
ails.
4.7.2 Alttimetry
10
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
erances - To
4.8 Tole opographic Survey in A
Areas or Strrips Earmarrked for thee Implementtation of
the Definitive Design
D
4.8.1 Lin
near Closing
g
near Closing
4.8.2 Lin g of Strips
4.8.3 An
ngular Closing
5 Speciific Conditiions
5.1.1 Pla
anialtimetry
y
11
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
e) the botto
om elevation ns may be ta aken with a measuring rod, controllled by plumb b line or
bubble le
evel;
f) distance
es may be de etermined witth a tape me
easure or tota
al station;
g) the posittioning of the measurem ment points for
f bottom elevations maay be determ mined by
triangula
ation, total sta
ation, or GNS
SS;
h) for vast segments of the water p part, or unde
er adverse conditions
c off depth and currents,
c
the echoo sounder shall be used.
5.1.1.4 A
All improvem ments, poles, towers, and other details
s deemed immportant shal l be georeferenced if
found witthin a strip of
o 15 m arou und the physsical boundaaries of the area,
a unlesss the design requires
greater w
width.
estitution an
5.1.2 Re nd Presentattion
5.1.2.1 M
Macro Locattion Drawing
g
This sha
all be presennted over a cartographicc base or beb the result of aerial suurveying, to a scale
compatibble with the extension of
o the area o of interest defined
d by PETROBRAS
P S, with the following
f
informatio
on:
a) hydrograaphy;
b) highwayys and railways of the reg
gion;
c) municipaal and state boundaries;
b
d) units and
d pipelines of
o PETROBR RAS.
5.1.2.2 A
Area Plan
It shall be
e presented over a cartographic base e or resulting
g from aerial surveying, too a scale compatible
with the eextension of the area, pro
oviding the fo
ollowing information:
5.1.2.3 T
Topographic
c Plan(s)
12
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
b) flat regio
ons, depressions and ele evations whic ch mark the ground, tran slated as po
oints with
indicated d elevations;
c) aindication of points s of interestt, geographic c features, buildings,
b im
mprovementss, buried
interferences, and vegetation
v u
until the limitts of a 15 m strip (unleess a largerr strip is
specifiedd by the des sign) aroundd the entire area. The te erminology uused for reg
gistration
shall commply with PEETROBRAS N N-1041.
d) location of topograph hic markers a and their identification;
e) network of coordinates at every 1 10 cm;
f) list of ma
arkers with coordinates
c a
and elevationns;
g) articulatiion of sheets
s;
h) length inn meters of surveyed area a;
i) location of axes and cross sectio ons;
j) reduced circulation and
a area plan ns;
k) the true e north, the magnetic n north, grid north, magn netic slope, date and meridian
converge ence;
l) key with conventions s used;
m) coordina a limits, whenever these are pre-estaablished, in the
ates with verrtices of area t UTM
system;
n) local toppographic and d coordinatees (UTM) sys stem adopted d;
o) numerica al scale and graphic scalle;
p) location and identiffication of the geotech hnical tests and compplementary services,
s
wheneve er these are conducted in n the area.
5.1.2.4 D
Drawings off Special Are
eas
5.1.2.6 S
Supplementtary Docume
ents
The follow
wing supplem uments shalll be presente
mentary docu ed:
a) field boooklet;
b) final repo ort containing at least the e following in
nformation:
— descrription of bas sic support a nd support polygonals;
p
— paper on topographic markerss implemente ed and officiaal markers u sed in the su
urvey;
— list off all documen nts issued;
— opera ational metho odology used d in each fielld service (by
y discipline);
— calcu ulation notes s: leveling, lin
near measurrements, ang gular measuurements, are eas, and
verificcation of clos
sing tolerancces;
— list off equipment used (brand names and models).
a) researchh, verification
n, and selectiion of basic support;
s
b) impleme entation of mainline;
c) location of mainline;
d) leveling of strip cente
erline;
e) analysis of variants;
13
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
f) physical register;
g) survey ofo land and water
w crossinggs;
h) georeferrenced record of rights off way and ac
ccesses;
i) restitutio
on of strips.
5.2.2 Implementatio
on of Mainlin
ne
5.2.2.1 P
Principal Po
olygonal
a) the sides of the prin ncipal polygo onal shall bee roughly 5 km k in lengthh, and sides of 7 km
shall be tolerated, materialized byy a type A marker
m on theeir intermediaate vertices;
b) the princcipal polygon nal shall be cclosed, return
ning, outside the adoptedd routing, to thet point
of origin
n of the sec ction. Framin ng can also be perform med, reachin g a point of o known
coordinaates located at a the oppossite end of the e origin of the survey;
c) the veriffication of the
e planialtimeetric closing of
o the vertice es of the prinncipal polygoonal with
the basicc support sta ations of the region shall be executed, at least, evvery 50 km.
5.2.2.2 S
Secondary Polygonal
P
A seconddary polygon nal shall be implemented t mainline of the routee, in accordance with
d, following the
the provissions of 4.7 and
a the follow wing conditio
ons:
5.2.3.2 T
The progresssive staking of the secon ndary polygo
onal shall be
e done everyy 50 m, begiinning at
stake zerro for the prin
ncipal strip and branchess.
5.2.3.3 T
The strip shaall be surveye ed by total sttation with maximum
m measurement oof 120 m. The details
outside th
he strip shalll be referenced to the proogressive staaking.
14
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
5.2.4 Lev
veling of Sttrip Centerlin
ne
5.2.4.1 T
The leveling of the centerrline shall be
e geometric, with
w runs as described inn ABNT NBR
R 13133.
5.2.4.2 A
At the optionn of PETROB BRAS, trigon
nometric leve
eling of the axis
a is admittted on steep
p ramps,
provided total stationss are used.
5.2.4.3 A
All horizontal and vertical stakes and IP shall be le
eveled.
5.2.4.4 WWhenever the crosswise inclination oof the strip is higher than 15 %, the ssides shall be
e leveled
at points corresponding to the pro
ogressive sta
aking in this segment.
s
5.2.5 Ph
hysical Regis
ster
It shall be
e undertaken
n in accordan
nce with PET
TROBRAS N-1041.
N
5.2.6 Su
urvey of Lan
nd and Water Crossings
s
5.2.6.1 A
At the discre
etion of PETRROBRAS, eiither of two types
t vey shall bee conducted for each
of surv
land and water crossiing, namely:
5.2.6.4 C
Complete Ge
eoreferenced
d Topographiic Survey forr Land Cross
sings
a) a planialltimetric surv
vey shall be conducted on o a strip 25 m in length on both side es of the
mainlinee, at every 100 m of the axxis of the crosssing;
b) all details shall be signaled,
s succh as: pavement, railwa ay tracks, brroken rock, drainage
d
devices, fences, cres sts and slopee sides, platfform bounda aries, shouldeers and othe
er details
at the disscretion of PETROBRAS
P S;
c) the nammes of the cities
c immed diately beforre and after the point oof crossing shall be
indicatedd, and the dirrection of su ch cities sha
all be indicate
ed by meanss of arrows;
ance in kilometers of the rroad or railw
d) the dista way shall be indicated.
5.2.6.5 C
Complete Ge d Topographiic Survey forr Water Crossings
eoreferenced
15
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
5.2.6.6 S
Simplified Ge
eoreferenced
d Topographiic Survey
It comprises the exe ecution of, at least, thrree longitudinal sectionss, one of thhem being over
o the
centerline
e of the main
nline and the other two on
n the sides of
o the strip.
a) at the discretion
d of PETROBRA AS, the num mber of secttions to be surveyed sh hould be
increase
ed;
b) unless otherwise
o sp PETROBRAS, the sections shall beegin and en
pecified by P nd 20 m
before and after the right-of-way of the agenccy responsible for the inteerference cro
ossed;
c) the sectiions shall be surveyed w
with leveling every
e 5 m.
5.2.7 Ge
eoreferenced
d Recording
g of Accesse
es to Pipelin
ne Right of Way
5.2.7.1 G
Georeference ed mapping shall be perrformed of ro
oads allowing
g access to noteworthy points
p of
the pipeline right of way.
w
5.2.7.2 G
Georeference
ed recording and mappin
ng shall include:
a) all notewworthy points including g: areas of valves, stations, gas ddistribution stations,
compresssion stations s, pumping sstations, city gates, rectiffiers, anode beds, corros sion box,
pig launcchers and receivers; opti c fiber lines with
w their res spective pull boxes;
b) the communities nea ar the rights oof way within
n the areas ofo direct and indirect influ
uence as
defined by
b the Installlation Licensse (LI) and Operation
O ense (LO) foor the project;
Lice
c) highwayys, urban roa ads and coun ntry roads pe ertaining to access
a to nooteworthy pooints and
commun nities defined
d by items a) and b) abov ve.
5.2.7.3 TThe field survvey shall be performed w with a GNSSS for cadastral services with code CA
C or L1,
with kine etic relative positioning or static rrelative posiitioning, pos st-processedd by the diffferential
correctionn method ussing the activ
ve stations off Rede Brasileira de Mon nitoramento Contínuo (R
RBMC) of
Brasileiro de Geografia e Estatística ((IBGE) or ce
Instituto B ertified by IBG
GE.
16
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
5.2.8 Re
estitution an
nd Presentattion of Georreferenced Topographic
T c Surveys o
of Strips
5.2.8.1 M
Macro Locattion Drawing
g - General Plan
a) plan of the macro location of ro routing, on a cartograph hic base or rresulting from aerial
surveyinng, to a scalle compatibl e with the extension
e off the routing , in the stan
ndard or
multiple A1 size, withh emphasis o wing information:
on the follow
circullation of the region;
municcipal and sta ate boundarie es;
urban n limits;
areass subject to military
m restri ctions;
hydro ography;
conce essions for mineral
m explooration, prote
ection of wate
er springs, foorest reserve
es, areas
of permanent pre eservation, da am reservoirrs and other areas of inteerest at the option
o of
PETRROBRAS;
b) the drawwing shall be prepared to o a scale com h the availabble cartographic base
mpatible with
and shalll not be sma aller than 1:1 000000;
c) all PETR ROBRAS un nits shall bee plotted in this drawing g, together w with the pipeelines in
existencce in the areaa under conssideration;
d) place thee progressiv ve kilometer at every 1 km on the strrips up to 500 km, at everry 10 km
on the sttrips up to 25
50 km, and a at every 20 km on the remmaining stripss;
e) the identification andd UTM and D DATUM coordinates of the geodetic marker belo onging to
the Brazzilian Geode esic System used as the origin of the e other installled markers shall be
inserted in the “Notes” field.
5.2.8.2 K
Key Plan Dra
awings
a) key plan n drawings shall be prrepared in size s A1, standard or m multiple type,, over a
cartographic base, to a scale co ompatible with the extension of the rright of way and not
smaller than 1:1000 000, contain ning the datta mentioned d in 5.2.8.1 a) as well as the
followingg ones:
— total areas
a of land
d access to tthe strip;
— vertex transmissio on lines of th
he geodetic grid
g and princ cipal polygonnal;
— highliighting of municipal
m bou undaries on a strip 10 km wide onn both sides of the
mainline, including symbologyy;
b) the imple emented as well as officiial topograph hic markers shall
s be plottted, and a ta
able shall
be includ ded in the coolumn of note es with the fo
ollowing data
a:
— numb ber of marker;
— UTM coordinates;
— topog graphic coord dinates;
— eleva ations;
c) the title of
o the drawin ng shall conttain the municipalities of the limits of the sheet as s well as
the progressive kilom meter;
d) place the e progressiv ve kilometer at every 5 km k on the sttrips up to 4000 km, and at every
10 km on n the remainning strips;
e) in the fie
eld known as s “Reference Drawings,” indicate the numbers perrtaining to th he macro
location and general plan and pro ofile drawing
gs;
f) the identification and d UTM and D DATUM coordinates of the geodetic marker belo onging to
the SGB B used as the e origin of thhe other insta
alled markerss shall be insserted in the
e “Notes”
field.
17
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
5.2.8.3 A
Articulation Plan
5.2.8.4 P
Plan Drawing and Gene
eral Profile
5.2.8.5 G
General Proffile Drawing
g
5.2.8.6 P
Plan and Pro
ofile Drawin
ngs
18
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
5.2.8.7 S
Special Surv
vey Drawing
gs
5.2.8.8 F
Final Reportt
a) extensio
on of progressive and devveloped routiing;
b) calculation notes of the
t develope ed kilometer containing thhe following iinformation:
— numb ber of the pla
an and profile
e drawing annd its revision
n;
— initial and final sta
akes;
— difference in level;
19
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
5.2.8.9 R
Report of IP Coordinate
es
Each field
d booklet sha he following i nformation on
all contain th o its cover:
a) progresssive km.................. up
p to progress
sive km;
b) stake..........................…..... up
p to stake;
c) IP....................................... up
p to IP;
d) Municipa ality....................... up
p to Municipa
ality;
e) booklet number.
n
5.3 Topo
ographic Su
urvey with Arbitrary
A Coo
ordinate Sy
ystem
5.3.5 For the restituttion and presentation off this kind off topographic
c survey, it sshall be exe
ecuted in
accordan
nce with 5.1.22.3, with the exception off m) and n);
20
-PU
UBLIC-
N-47
N REV. J EN
NGLISH 09 / 2012
ographic-Ca
5.4 Topo adastral Surrveys
6 Inspe
ection, Acc
ceptance an
nd Rejectio
on
The cond
ditions establlished in ABN
NT NBR 131 33 shall be followed.
f
21
-PUBLIC-
INDEX OF REVISIONS
REV. A, B, C, D and E
There is no index of revisions.
REV. F
Affected Parts Description of Alteration
Revalidation
REV. G
Affected Parts Description of Alteration
All Revised
REV. H
Affected Parts Description of Alteration
3.14 Included
Figure 6 Included
REV. J
Affected Parts Description of Alteration
4.4 Alteration
4.4.1.1 Alteration
IR 1/2
-PUBLIC-
REV. J
Affected Parts Description of Alteration
4.4.1.4.1 Alteration
4.4.1.5 Alteration
4.8.4 Alteration
5.1.2.3 Alteration
5.2.7.3 Alteration
IR 2/2