Project No. : -
Tittle : Scope of Work & Supply Rev. : 2
Scope
Description Remarks
Vendor
Tank
Engineering
Process design & sizing √
Equipment Datasheet & Specification √ see drawing
Mechanical design calculation √
General arrangement & detail drawing √
Shop Drawing and MTO √
QA/QC Procedures ( WPS, PQR, ITP, Etc ) √
Manufacturig Data Report √
Material
Tank (Carbon Steel) √
Agitator (incl. motor) optional
Handrail (use galvanized pipe) √
Platform (use galvanized bordes plate) √
Stairway (use galvanized grating) √
Consumable √
Fabrication work (incl. tools &equipment) √
NDT Inspection
Radiography test N/A
Penetrant test √
Leak test (hydrotest) √
Surface finish : Sand blasting & Painting √
Packing & Delivery
Packing by wooden saddle √
Delivery to site √
Unloading at site √
Installation at site √
Dismantling old reactor R-101 1 unit √
Dismantling CS tank 1 unit √
Moving pinguin tank 2 unit √
Mobdemob & safety kit √
Safety kit √
Civil work
Fondation for base plate N/A
Anchoring √
Electric power source supply √ √
Water for hydrotest √ √