IMABS 2017
Raw material (S) =10.000

Ordering cost (F) = 1.000.000

Curyig cost (C) =10%(0,1)

Price per bottle (P) =30.000

2 fs
EOQ =
√ cp

2(1.000 .000)(10.000)
=
√ 0,1(30.000)

20.000 .000 .000


=
√ 3000

= √ 6.666 .666,67

= 2.581,99

= 2.582

TIC = CP ( Q/2 ) + F ( S/2 )

= 0,1 (30.000) (2.582/2) + 1.000.000 ( 10.000/2 )

= 3000 (1.291) + 1.000.000 ( 3.8730 )

= 3.873.000 + 38. 730.000

= 38.733.873.000

IF, Q = 5000

TIC = CP ( Q/2 ) + F ( S/2 )

= 0,1 ( 2700) + 1.000.000 ( 10.000/2 )

= 270 ( 2500 ) + 2.000.000

= 675.000 + 2.000.000

= 2.675.000

Analysis = take a discount