(a) For depth 0.0 to 1.5 m 180 m³ 69.00 12420.00
(b) For depth 1.5 to 3.0 m 86 m³ 79.00 6794.00
[2] ( ADB SOR ITEM 4.1.5)
Providing and laying in position cement concrete M10
excluding the cost of centring and shuttering - All work
upto plinth level :-1:3:6 (1 Cement : 3 coarse sand : 6
graded stone aggregate 20 mm nominal size).
- - - -
For foundation and plinth protection 61 m³ 2,428.70 148150.70
[3] (ADB SOR ITEM 5.1.2)
Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of centring,
shuttering, finishing and reinforcement - All work upto
plinth level:
[3]
Note:- The quantities worked out in the BOQ are derived from the actual structural design of the Over Head
Reservoir, However these may vary considering the wastages of materials as per construction practices during
execution of work.