This document summarizes a study analyzing and enhancing a manufacturing process. It shows that originally 79% of changeover tasks were completed during the changeover with 21% before and 0% after. The goal is to reduce changeover time from 15 minutes by reorganizing when tasks are done. It then lists 32 tasks involved in the changeover and whether they are internal or external tasks and if they are done before, during, or after the changeover.
This document summarizes a study analyzing and enhancing a manufacturing process. It shows that originally 79% of changeover tasks were completed during the changeover with 21% before and 0% after. The goal is to reduce changeover time from 15 minutes by reorganizing when tasks are done. It then lists 32 tasks involved in the changeover and whether they are internal or external tasks and if they are done before, during, or after the changeover.
This document summarizes a study analyzing and enhancing a manufacturing process. It shows that originally 79% of changeover tasks were completed during the changeover with 21% before and 0% after. The goal is to reduce changeover time from 15 minutes by reorganizing when tasks are done. It then lists 32 tasks involved in the changeover and whether they are internal or external tasks and if they are done before, during, or after the changeover.
1 Disconnect the machine Internal During 2 Take out the bit Internal During 3 Look for the new bit External Before 4 Look for the tool External Before 5 Measure the bit's diameter External Before 6 Put away the tool External Before 7 Put away the bit box External Before 8 Look for the second tool External Before 9 Measure thickness External Before 10 Adjust the tape External Before 11 Check the measure made External Before 12 Adjust the tape External Before 13 Inster the bit into the drill Internal During 14 Take out the material External During 15 Look for new material External Before 16 Measure External Before 17 Look for tools External Before 18 Draw on the material External Before 19 Put away the toolbox External Before 20 Secure material External During 21 Connect the machine Internal During 22 Drill the holes Internal After 23 Quality test Internal After 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39