Foundation Sub-Structure details Super structure details

Key map Foundation


Existing Proposed Span Design FRL (in Concrete Qty Steel qty Cost of the
Sl. No. satelite level Depth of the Remarks
Chaiange Chainage Arrangements loading meter) in cum in MT Bridge (Rs.)
GPS (in meter) Type of Abutment Type of Top slab Bearing
SBC t/sqm foundation/Length Piers details
Foundation details superstructure Thickness (mm) details
of pile (m)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Major Bridges Details , Ring Road

Foundation Sub-Structure details Super structure details


Key map Foundation
Existing Proposed Span Design FRL (in Depth of the Concrete Qty Steel qty Cost of the
Sl. No. satelite level (in Type of Abutment Type of Top slab Bearing Remarks
Chaiange Chainage Arrangements loading meter) SBC t/sqm foundation/Length Piers details in cum in MT Bridge (Rs.)
GPS meter) Foundation details superstructure Thickness (mm) details
of pile (m)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Minor Bridges Details , Ring Road
New
597+952 1 x 14.00 590.7 596.465 Open 5.765 Solid Slab 750 Tar Papre Construction
New
600+967 3 x 10.4 593.350 602.286 Open 8.936 2 3 Deck Slab 700 Tar Papre Construction
New
603+410 3 x 12 587.900 596.148 Open 8.248 2 3 Deck Slab 750 Tar Papre Construction
New
604+952 591.280 599.084 Open 7.804 Deck Slab 700 Tar Papre Construction
New
607+111 3 x 10.4 593.200 601.652 Open 8.452 Solid Slab 700 Tar Papre Construction
New
609+244 593.100 603.684 Open 10.584 Solid Slab 700 Tar Papre Construction
New
611+484 604.500 612.807 Open 8.307 Solid Slab 700 Tar Papre Construction
New
613+678 599.500 608.787 Open 9.287 Deck Slab 700 Tar Papre Construction
New
615+470 600.500 611.808 Open 11.308 Deck Slab 700 Tar Papre
Construction
Foundation Sub-Structure details Super structure details
Key map Foundation
Existing Proposed Span Design FRL (in Depth of the Concrete Qty Steel qty Cost of the
Sl. No. satelite level (in Type of Abutment Type of Top slab Bearing Remarks
Chaiange Chainage Arrangements loading meter) SBC t/sqm foundation/Length Piers details in cum in MT Bridge (Rs.)
GPS meter) Foundation details superstructure Thickness (mm) details
of pile (m)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
ROBs Details , Ring Road
Steel
POT-PTFE New
3 605+988 1 x 32 604.5 617.99 Pile 13.490 2 Composite 220 BEARING Construction
Plate Girder