L&T Construction

Water & Effluent Treatment IC

DOCUMENT NO. DATE


PROJECT: NAGAUR CDS 03 (Package - 6)
LE170989-C-WS-CW-DC-3040 12/06/20
DESIGNED CHECKED PAGE
TITLE: CLEAR WATER PUMP HOUSE AT LADARIYA
KMG VP

Calculation of load for frame analysis :

I Dead Load calculation:

Apart from self weight of beam and column following are the

dead loads considered for the analysis

a) Load from parapet wall:

Self weight of parapet wall acting on roof beams

0.9x0.115x22= 2.28 kN/m

b) Load from s/w of roof slab, roof water proofing:

i) For roof slab= = 0.15 x 25 + 1.8 5.550 kN/m2

ii) For Porch slab= = 0.15 x 25 + 1.8 5.550 kN/m2

c) Load from brick wall:

i) Self weight of 230mm brick on plinth beams of MCC and loading bay

=0.23x2.875x22= 14.548 kN/m

ii) Self weight of 230mm brick on plinth beams of MCC and loading bay

=0.23x2.8x22= 14.168 kN/m

iii) Self weight of 230mm brick load acting on Tie beams

=0.23x1.65x22= 8.35 kN/m

iv) Self weight of 230mm brick load acting on Tie beams

=0.23x1.6x22= 8.1 kN/m

v) Self weight of 230mm brick load acting on Gantry beams

=0.23x1.55x22= 7.84 kN/m

v) Self weight of 230mm brick load acting on Gantry beams

=0.23x1.5x22= 7.59 kN/m

iv) Self weight of 230mm brick load acting on portico beam

=0.23x0.3x22= 1.52 kN/m

v) Self weight of 230mm brick load acting on rolling shutter tie beam

=0.23x0.275x22= 1.39 kN/m

# Sensitivity: LNT Construction Internal Use


L&T Construction
Water & Effluent Treatment IC

DOCUMENT NO. DATE


PROJECT: NAGAUR CDS 03 (Package - 6)
LE170989-C-WS-CW-DC-3040 12/06/20
DESIGNED CHECKED PAGE
TITLE: CLEAR WATER PUMP HOUSE AT LADARIYA
KMG VP

d) Load from Gantry girder:

iV) Dead load from Gantry girder= 6.88 KN

V) Moment due to gantry girder= 2.06 KN-m

II Live Load calculation:

a) Load from roof slab = 4 kN/m2

b) Live Load from Gantry girder:

i) Live load from Gantry girder= 32.91 KN

ii) Moment due to gantry girder= 9.87 KN-m

III Wind Load (WL1)

Wind Load Calculation:

Basic wind speed (Vb) = 47 m/s

Risk coefficient (k1) = 1.07

Terrain height, structure size factor (k2) = 1

Topography factor (k3) 1

Importance factor for cyclonic region 1

Design wind speed (Vz) = Vbxk1xk2xk3xk4 = 50.29 m/s

Wind pressure Pz = 0.6 x Vz2 = 1517.45 N/m2

Wind directionality factor Kd (Cyclone affected area) 0.9

Area averaging factor for Z-direction 0.8

Area averaging factor for X-direction 0.8

Combination Factor 1

Design wind Pressure Pd = KdxKaxKcxPz 1092.564

Design wind Pressure Pd = KdxKaxKcxPz 1092.564

Length of the building (b) = 42 m

Width of the building (a) = 15 m

Height of the building (h) = 8 m

# Sensitivity: LNT Construction Internal Use


L&T Construction
Water & Effluent Treatment IC

DOCUMENT NO. DATE


PROJECT: NAGAUR CDS 03 (Package - 6)
LE170989-C-WS-CW-DC-3040 12/06/20
DESIGNED CHECKED PAGE
TITLE: CLEAR WATER PUMP HOUSE AT LADARIYA
KMG VP

a/b= 0.36

h/b= 0.19

Ref fig 4B of Force coefficient for rectangular clad building = 1.2

IS 875 (p III) Wind pressure acting on building =1.2x1092.564/1000= 1.31 kN/m2

1.31 kN/m2

IV Seismic Load (SL)

Seismic zone = III

Damping percentage = 5 %

Importance factor (I) = 1.5

Response reduction factor (R) = 3

Ref IS:1893-02 Zone factor (Z) = 0.16

# Sensitivity: LNT Construction Internal Use


L&T Construction
Water & Effluent Treatment IC

DOCUMENT NO. DATE


PROJECT: NAGAUR CDS 03 (Package - 6)
LE170989-C-WS-CW-DC-3040 12/06/20
DESIGNED CHECKED PAGE
TITLE: CLEAR WATER PUMP HOUSE AT LADARIYA
KMG VP

# Sensitivity: LNT Construction Internal Use