Production Planning and Detailed Scheduling
Production Planning and Detailed Scheduling
SAP S/4HANA for Manufacturing planning and scheduling Comprehensive Plan to Produce
in ONE System is a great advantage to plan production process very detailed level.
PP/DS planning and scheduling features available in SAP S/4HANA
One MRP
One MRP planning runs for classical MRP planning and advanced PPDS heuristics.
One low-level code calculation
You can take the resource and component availability into account here. Above all, PP/DS
is used to plan critical products, such as products with long replenishment lead times or
products that are produced on bottleneck resources. You can use PP/DS to create
executable production plans and:
Once this advanced planning function activated the following SAP Fiori apps can be
accessed.
The apps activated by the Advanced Planning and Scheduling switch are not part of the
standard SAP S/4HANA Enterprise license. A dedicated license for Advanced Planning and
Scheduling is required if this switch is set to Active.