7 48 2 2 7 7 5 G F e D A B

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

E F

D 7 7
B 48 G
A 5 7
2

T H
M 2
5 15
L
P 14
14
I
7
S
R 5 K J
7 7 10
14 5 N
Q 5
1
U O
A. SITEWORKS
B. EXCAVATION AND FOUNDATION STEELWORKS
D. FOUNDATION, BACKFILL, SLAB STEELWORKS, BEAMS, AND COLUMNS
E. GROUND SLABS
F. FIRST FLOOR BRICKW ALLS
G. SECOND FLOOR SLABS
H. STAIRCASE
I. SECOND FLOOR BRICK WALLS
J. ROOF FRAMING MATERIALS
K. ROOF MATERIALS
L. PLUMBING PIPES
M. PLUMBING FIXTURES AND ACCESORIES
N. CEILINGS AND PARTITIONS
O. EXTERIOR GLASS WALLS
P. ELECTRICAL WORKS
Q. DOORS, WINDOWS, AND ACCESORIES
R. TILEWORKS
S. SEPTIC VAULT
T. TRUSS-SMITHING
U. SITE-CLEANING AND DEMOBILIZATION

FOR CRITICAL PATH:


A+B+D+E+F+G+H+I+J+K+L+M+P+R+T=2+5+48+7+7+7+2+7+10+7+14+5+14+14+1=78 DAYS
A+B+D+E+F+G+H+I+J+K+S+R+U=2+5+48+7+7+7+2+7+10+7+5+14+1=122 DAYS
A+B+D+E+F+G+H+I+J+K+N+O+Q+R+U=2+5+48+7+7+7+2+7+10+7+7+5+5+14+1=136 DAYS
A+B+D+E+T+J+K+L+M+P+R+U=2+5+48+15+10+7+14+5+14+14+1=135 DAYS
A+B+D+E+T+J+K+S+R+U=2+5+48+15+10+7+5+14+1=107 DAYS
A+B+D+E+T+J+K+N+O+Q+R+U=2+5+48+15+10+7+7+5+5+14+1=119 DAYS
EVENT ACTIVITY DURATION ES LS EF LF TF=LS-ES TF=LF-EF
1-2 A 2 0 0 2 2 0 0
2-3 B 5 2 2 7 7 0 0
3-4 D 48 7 7 55 55 0 0
4-5 E 7 55 55 62 62 0 0
5-6 F 7 62 62 69 69 0 0
6-7 G 7 69 69 76 76 0 0
7-8 H 2 76 76 78 78 0 0
8-9 I 7 78 78 85 85 0 0
9-10 J 10 85 85 95 95 0 0
10-11 K 7 95 95 102 102 0 0
11-12 L 14 102 102 116 116 0 0
12-14 M 5 116 116 121 121 0 0
11-13 N 7 102 118 109 125 16 16
13-15 O 5 109 125 114 130 16 16
14-16 P 14 121 121 135 135 0 0
15-16 Q 5 110 130 115 135 10 10
16-17 R 14 135 135 149 149 0 0
11-16 S 5 102 130 107 135 28 28
5-9 T 14 62 71 76 85 8 8
17-18 U 1 149 149 150 150 0 0